Project Equipment Installation Model Contract (1) Employer (Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative: _ _ _ _ _ _ _ _ _ _ _
Contractor (Party B): _ _ _ _ _ _ _ _ _ _ _
Person in charge: _ _ _ _ _ _ _ _ _ _ _
Through friendly negotiation between Party A and Party B, Party A agrees to contract out all earth and stone works in _ _ _ _ _ _ _ _ to Party B.
1. Project content: earthwork excavation, filling, leveling, transportation and waste disposal.
Second, the project site selection:
3. Engineering quantity: the earthwork project is about _ _ _ _ _ million cubic meters. The construction is organized online, and the project settlement is calculated according to the actual completed engineering quantity.
Four. Contract mode: Contract mode is adopted, and the unit price is RMB/m3. All expenses for muck, transportation, dumping and muck registration in this project shall be borne by Party B, and shall be priced separately through negotiation between stonework and concrete structure.
Verb (abbreviation of verb) settlement method: After Party B enters the site, Party A will pay Party B an entrance fee of RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6. The taxes and fees shall be borne by Party A. ..
Seven. Party A's responsibilities
1. Water and electricity are provided by Party A. ..
2. Party A sends technicians to the site to assist Party B in construction guidance, strengthen project quality supervision, ensure the project quality meets the requirements, and conduct quality acceptance of concealed projects in time.
3. Party A is responsible for sending special personnel to sign and confirm the completed quantities in time, so as to cooperate with Party B to carry out the follow-up work smoothly.
Eight. Construction Date: The construction tasks of the above projects shall be completed within _ _ _ _ days from the commencement date. Design changes, natural disasters and other irresistible factors, as well as holidays, muck office notice to stop work and other stones, (causing delays in the construction period, the construction period will be postponed accordingly.
Nine. For matters not covered in this contract, both parties shall negotiate separately to supplement and improve the agreement.
X this contract was signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party A: (signature) _ _ _ _ _ _ _ _ _ _ Party B: (signature) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B.
Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Model contract for installation of engineering equipment (II) Owner (Party A): _ _ _ _ _ _ _ _ _ _ _ _
Representative: _ _ _ _ _ _ _ _ _ _ _
Contractor (Party B): _ _ _ _ _ _ _ _ _ _ _
Person in charge: _ _ _ _ _ _ _ _ _ _ _
According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, on the basis of equality and voluntariness, Party A and Party B have reached the following agreement on the installation of _ _ _ _ _ _ _ _ _.
Article 1 Specification, model, quantity and general situation of the equipment ordered by Party A and installed by Party B:
1, equipment:
Product Name _ _ _ _ Specification Model _ _ _ _ Unit _ _ _ _ _ Quantity _ _ _ _
2, the installation project overview:
_ _ _ _ _ Global Chinese Home Portal
(1) Project location and area: _ _ _ _ _ _ _ _ _ _ _ _
(2) Project cost: _ _ _ _ _ _ yuan;
(3) Commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
(4) Completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(5) Payment method: _ _ _ _ _ _ _ _ _ _ _ _
Article 2 When Party B's engineering materials enter the site, Party A shall confirm and designate the place where the goods are stacked (the place designated by Party A must be secured), and both parties shall be responsible for the safety of the engineering materials. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 3 Installation, debugging and acceptance of products:
1. Party B is responsible for the installation and commissioning of _ _ _ _ _ _ _ _ _ equipment.
Party A and Party B agree that:
( 1)_______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(2) Before _ _ _ _ _ _ _ _ _ _
(3) Complete equipment installation and system debugging before _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ All required materials should be in place at the time agreed by both parties.
2. The installation quality standard shall meet the national standards and industry requirements, as well as the engineering installation design instructions provided by Party B and the manufacturer. Party B shall notify Party A of the acceptance on the day when the project is completed, and Party A shall organize personnel to accept the project within three days after receiving the acceptance notice. If the quality and content of the project meet the requirements, the representatives of both parties shall sign and seal the project acceptance form (form). Party B is responsible for providing product certificate, material certificate, product warranty, daily operation procedure description and fault consultation. The product installation scheme shall be based on the design drawings and selection scheme proposed by Party B and agreed by Party A; If it is necessary to change the design scheme, it must be agreed by both parties through consultation; If the aircraft type adjustment is involved, the supplementary text of the contract shall be signed for confirmation.
Article 4 Liability for breach of contract
1. Party B's responsibilities:
(1) The person in charge of Party B's _ _ _ _ _ _ site is fully responsible for the installation of the site;
(2) Except as stipulated in the contract, if Party B fails to deliver the work within the time stipulated in the contract, Party B shall pay liquidated damages of _ _ _% of the total price to Party A for each day of delay, but the total amount of liquidated damages shall not exceed _ _ _% of the total price. If Party B still fails to deliver the work after reaching this deadline, Party A may consider terminating the contract, and the losses caused to Party A therefrom shall be borne by Party B, unless it is signed and approved by Party A. ..
(3) If Party B delays the construction period without reason, it shall pay a penalty of 1‰ to Party A for each day of delay, except for Party A's reasons. ..
(4) Party B shall be responsible for the responsibilities and losses caused by unqualified installation.
2. Party A's responsibilities:
(1) The person in charge of Party A's _ _ _ _ _ _ site is fully responsible for the installation of the site;
(2) Party A shall create conditions for Party B to enter the site for construction, vacate the site and connect the water and electricity for construction _ _ _ days before commencement;
Party A: (signature) _ _ _ _ _ _ _ _ _ _ Party B: (signature) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B.
Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Model contract for installation of engineering equipment (III) Owner (Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative: _ _ _ _ _ _ _ _ _ _ _
Contractor (Party B): _ _ _ _ _ _ _ _ _ _ _
Person in charge: _ _ _ _ _ _ _ _ _ _ _
Whereas Party A is the employer of _ _ _ _ _ _ _ _ _
1. The refrigeration equipment, materials and installation remuneration provided by Party A for Party B are as follows:
* * _ _ _ _ _ _ _ Refrigeration room and * * _ _ _ refrigeration equipment, with a total price of _ _ _ _ _ _ _ _ _.
Second, the delivery and installation cycle
Start with _ _ _ _ _ _ _ _.
Third, the warranty
Party B shall insure the refrigeration equipment for _ _ _ _ years, and the losses caused by Party A's illegal operation shall be borne by Party A; The warranty period starts from the date when the installation and commissioning are qualified and the trial operation begins.
Four. accept
After the installation is completed, Party B shall notify Party A for acceptance within _ _ _ _ _ days from the completion date; Party A shall organize the acceptance within _ _ _ _ _ days from the date of receiving the acceptance notice. After acceptance, Party B shall provide Party A with the necessary technical instructions, operating instructions and precautions. If the acceptance is unqualified, Party B shall rework it for free until it reaches the agreed standard.
Verb (abbreviation of verb) settlement method and time limit
1, and the quantities are calculated according to the actual construction.
2. Pay RMB advance payment _ _ _ _ _ days after signing the contract; After the refrigeration equipment arrives at the installation site, Party A shall pay Party B RMB _ _ _ _ _ _. Pay Party B RMB _ _ _ _ _ _ _ _ _ _ _ Yuan, and the remaining RMB _ _ _ _ _ _ _ _ _ _ Yuan shall be paid to Party B as quality guarantee upon the expiration of the warranty period.
6. After receiving the advance payment, Party B shall remit the money to the manufacturer in time to order the equipment. The equipment shall be transported by rail (including road combined transport). Upon receiving the delivery notice, you should timely inspect the goods, pay for the equipment, and pick up the goods in time. When Party A fails to pay according to the contract after arriving at the installation site, Party B shall not unload the goods and may take the equipment with him.
7. Party A shall provide a three-phase power supply (which must have a neutral line) in line with national regulations. Due to power supply, the construction period is delayed and the completion date is postponed.
Eight. Party B shall not be liable for the losses caused by force majeure.
Nine, during the performance of the contract, either party shall notify the other party in writing of the termination of the contract, and any economic losses caused to the other party shall be compensated by the responsible party.
X. liability for breach of contract
Because the project payment is not in place on time, if Party A fails to pay on time, which will affect the construction period, Party A will delay the settlement of the payment by Party B and pay liquidated damages to Party B at the rate of _ _ _% per day; The losses caused to Party A due to Party B's failure to complete the project on schedule shall be borne by Party B..
XI。 supplementary terms
1. When Party A fails to pay the total project price, the ownership of the equipment belongs to Party B. ..
2. This contract was signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. This contract shall come into effect after being signed and sealed by both parties.
4. Matters not covered in this contract shall be settled by both parties through consultation. If negotiation fails, both parties may bring a lawsuit to the people's court where the project is located.
Party A: (signature) _ _ _ _ _ _ _ _ _ _ Party B: (signature) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B.
Phone number: _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ _ Phone number
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.