Question 2: Do all projects need to be filed? What are the main filing requirements? Thank you ... the construction project must obtain the construction land planning permit, the construction project planning permit and the construction permit in advance, and the house completion acceptance information must be submitted after the project is completed before the real estate license can be obtained. You can look at the Urban and Rural Planning Law and the Measures for the Registration of Urban Houses.
Question 3: What is project filing? 1. Engineering documents refer to construction drawings, bill of materials, etc. The completion data of the construction industry that need to be submitted for approval to the departments of fire protection, municipal administration and construction bureau before the construction project starts, and the completion data after the project is completed.
Second, the construction project for the record required materials:
1, construction permit application form
2, the construction project planning permit
3, construction drawing design document review report
4, quality and safety supervision registration form
5. Letter of acceptance
6. Construction contract and supervision contract (original)
7, construction organization design
8, the construction enterprise qualification certificate, business license, safety production license copy
9, supervision planning
10, copy of qualification certificate and business license of supervision unit.
1 1, fire protection design audit opinion.
12, basis for payment of relevant expenses stipulated by the state.
13, accidental injury insurance for construction personnel
14, commercial concrete contract (original)
15, general plan for planning approval
16, the project payment certificate of the construction unit, and the payment guarantee or deposit payment certificate of both parties.
17. Copy of labor subcontract (original), qualification certificate, business license and safety production license of labor service enterprise.
18, wall modification registration procedure
In the application requirements, for the materials that can be submitted with copies, the construction unit should add the words "This copy is checked correctly with the original content" on the copy, affix the seal of the unit, and provide the original for review.
Different places will have different places and requirements, but the main contents are similar.
Question 4: Which items need filing compensation? What do you see? It's too profound. What documents does the NDRC generally file? Land sales and other major investment projects.
Question 5: What are the requirements for filing construction contracts? Submit the list of filing materials 20 points.
1. General construction contract or professional contract
1, the original application form for the construction permit of the construction project;
2. The official text of this contract is in quadruplicate;
3. The original certificates of the legal representatives of both parties to the contract, and the original power of attorney of the legal representative if the legal representative is authorized to sign the contract;
4. If the contractor is a foreign enterprise, a copy of the contractor qualification certificate and the project manager qualification certificate (original) shall be submitted;
5. A project subject to tender shall submit the tender documents and the copy (original) of the Certificate of Completion of the Bidding (Contract-awarding) Procedure for Construction Projects or the Letter of Acceptance;
6. For non-tendering projects, the original project budget signed by the registered cost engineer and stamped with the special seal for registered practice and the official seal of the preparation unit shall be submitted, and a copy of the registration certificate of the registered cost engineer shall also be submitted. * * * Investment projects (projects involving national security and state secrets, emergency construction projects and disaster relief construction projects) also need to provide a copy of the audit report issued by the Audit Bureau.
Second, the professional subcontract
1. Original application form for construction subcontract filing;
2. The official text of this contract is in quadruplicate;
3. The original certificates of the legal representatives of both parties to the contract, and the original power of attorney of the legal representative if the legal representative is authorized to sign the contract;
4. A project subject to tender shall submit the tender documents and the copy (original) of the Certificate of Completion of Bidding (Contract-awarding) Procedures for Construction Projects or the Letter of Acceptance;
5. For non-tendering projects, the original project budget signed by the registered cost engineer and stamped with the special seal for registered practice and the official seal of the preparation unit shall be submitted, and a copy of the registration certificate of the registered cost engineer shall also be submitted;
6, the construction unit and the construction general contracting enterprise signed a copy of the construction general contracting contract for the record;
7. The original certificate that the construction unit agrees to subcontract the project (the subcontracted professional project in the labor subcontracting or general contracting contract may not be provided);
8. If the contractor of the subcontracted project is a foreign enterprise, a copy of its qualification certificate and the qualification certificate of the project manager (constructor) shall be submitted (original copy);
9. For non-tender projects, a copy of the subcontractor's safety production license and the project manager's safety production assessment certificate (original) shall be provided.
3. Labor subcontracting contract
1. Original construction subcontract filing application form
2. The official text of this contract is in quadruplicate;
3. The original certificates of the legal representatives of both parties to the contract, and the original power of attorney of the legal representative if the legal representative is authorized to sign the contract;
4. A project subject to tender shall submit the tender documents and the copy (original) of the Certificate of Completion of Bidding (Contract-awarding) Procedures for Construction Projects or the Letter of Acceptance;
5. For non-tendering projects, the original project budget signed by the registered cost engineer and stamped with the special seal for registered practice and the official seal of the preparation unit shall be submitted, and a copy of the registration certificate of the registered cost engineer shall also be submitted;
6 copies of the business license and qualification certificate of the construction labor service enterprise (original);
7. The letter of appointment of the person in charge of the construction labor operation team and the original power of attorney of the legal representative.
Supervision contract
1, the original application form for the construction permit of the construction project;
2. The official text of this contract is in quadruplicate;
3. The original certificates of the legal representatives of both parties to the contract, and the original power of attorney of the legal representative if the legal representative is authorized to sign the contract;
4. A project subject to tender shall submit the tender documents and the copy (original) of the Certificate of Completion of Bidding (Contract-awarding) Procedures for Construction Projects or the Letter of Acceptance;
5. For non-tendering projects, submit the original audit document of supervision remuneration signed by the registered cost engineer and stamped with the professional seal of registered practice and the official seal of the preparation unit, and submit a copy of the registration certificate of the registered cost engineer;
6. Copy (original) of the practice certificate of the chief supervision engineer and the letter of appointment of the chief supervision engineer. If the supervision unit is a foreign enterprise, a copy (original) of its qualification certificate shall be submitted.
5. Filing of contract changes
1, and the original supplementary agreement is in quadruplicate;
2. 1 original contract for the record.
Handling: directly handle it at the business acceptance window of the Construction Bureau. Receive the processing result with the receipt of filing acceptance ... >>
Question 6: What are the filing materials for construction projects? (1) project completion acceptance record;
(2) the project completion acceptance report;
(three) the approval or permission documents issued by the planning and environmental protection departments in accordance with laws and administrative regulations;
(four) according to the law should be issued by the public security fire department of large crowded places and other special construction projects acceptance certificate;
5) Project quality warranty signed by the construction unit;
(6) Other documents required by laws and regulations.
(7) residential quality guarantee and residential instructions.
Question 7: The things that need to be put on record for enterprise bidding should be in Beijing Construction Committee. Is your company engaged in construction? Go to the website of the Construction Committee. If there is a form, download and fill it out, bring the qualification certificate and safety production license, open a credit certificate in the construction Committee, and then take the opened things to the local construction Committee or the competent department you want to bid for for the record.
Question 8: Which projects must be audited, which projects must be filed and how to file them? There are no special rules for these.
First of all, you have to understand the purpose of auditing and filing.
First, according to the national Audit Law and other relevant regulations, whether the project budget is overspent in the implementation, whether there are hidden funds, interception of infrastructure income and investment contract balance, and whether there is a violation of discipline in dividing infrastructure investment in the name of investment contract balance. Audit is based on infrastructure projects, with accountants and auditors as the main employees.
Non-investment construction projects, which are large in scale and involve many stakeholders, must be audited, such as real estate developed by housing enterprises. Enterprises decide for themselves whether to audit the construction projects built by enterprises for their own use. But no matter what construction project, it only needs to be audited if it has a certain scale. For example, to build a simple carport for the * * * organ, the cost is 1 1,000 yuan, and there is no need to review it.
Second, the same is true for filing. Ding who meets the public bidding needs to go to the corresponding local management department for the record.
1。 Why put a case on file: In order to strengthen the supervision and management of the construction project contract, maintain the order of the construction market, protect the legitimate rights and interests of the parties to the construction project contract, and prevent illegal acts that endanger the interests of the state and society by using the contract.
Generally speaking, the purpose of contract filing management mainly includes three aspects: first, the establishment of contract filing materials to provide a basis for various project evaluation indicators, contract management, judicial proceedings, etc. In the city; The second is to standardize the construction market and improve the contract performance rate; Third, establish bad credit files of enterprises to promote the healthy and orderly development of construction enterprises.
2。 Legal basis: Contract Law of People's Republic of China (PRC) and Measures for the Administration of Bidding for Housing Construction and Municipal Infrastructure Projects of Ministry of Construction (Article 12 A tenderer who handles construction bidding by himself shall file with the construction administrative department of the local people's government at or above the county level five days before the tender announcement or invitation letter is issued).
3。 Contract filing procedures and materials provided
Before going through the contract filing procedures, the project must meet the following conditions: the project has been planned; Bidding procedures have been completed for the project subject to tender, and the construction unit has been determined; Projects that meet the conditions for direct contracting have gone through the formalities for direct contracting approval; Both parties to the contract have signed a written contract; The construction unit has handled the project payment guarantee according to the regulations; The construction unit has handled the project performance guarantee as required. Project contract filing procedures and materials to be provided for filing are as follows:
Information to be provided for contract filing:
Construction contract of construction project (including renovation contract):
L, the construction contract in duplicate (including renovation contract) 8 copies (or customized not less than 5 copies);
2, Shenzhen construction information registration and approval form;
3, the developer project payment guarantee;
4. Contractor's performance guarantee;
5. Bidding documents;
6. Bid price list;
7. For directly contracted projects, provide cost verification certificates issued by cost verification agencies?
8. The legal representative proves or entrusts the power of attorney of the agent.
Project supervision contract:
L, supervision contract filing form 1 copy;
2, supervision contract time;
3. Plan approval;
4, the project subject to tender shall provide the supervision contract format approved by the construction administrative department;
5, the appointment of the chief supervision engineer;
6, the chief supervision engineer's practice certificate;
7, chief supervision engineer practice liability insurance
8. Notice of bid-winning for a project subject to tender
Subcontract:
1, five formal subcontracts;
2, the construction project developer agreed to subcontract documents;
3, the subcontractor's business license and qualification certificate;
4, the subcontract works if bidding should provide the tender and tender offer;
5. For directly contracted projects, provide a budget consistent with the subcontracting price;
6, the contractor's payment guarantee; Subcontractor's performance guarantee;
7. The legal representative proves or entrusts the power of attorney of the agent.
Cost consultation contract:
1, contract time for construction project cost consultation;
2, consulting company business license, engineering cost consulting qualification certificate;
3, the project leader's cost engineer registration certificate;
4, engineering cost consulting practice liability insurance;
5. Certificate or power of attorney of the legal representative ...... >>
Question 9: What projects does the company need to register? The registered projects of the company include bidding, foreign trade operator registration, website registration, tax-free registration, etc.
Filing system: refers to the legal requirement that the relevant authorities register those who meet the legal conditions in accordance with legal procedures.
At present, China's laws and regulations provide less legal liability for filing and registration of rules. For the filing obligation organ, according to the filing provisions of laws and regulations, if the filing rules are not submitted or not submitted on time, the legal institution of the State Council shall notify the enacting organ to submit them within a time limit; If it is still not submitted within the time limit, it shall be notified and ordered to make corrections within a time limit. But this is only the minimum requirement of filing review-"filing", which stipulates the legal responsibility of the enacting organ. As for other cases of non-registration, it is not stipulated whether the main person in charge is responsible. Especially for the higher authorities, whether filing and registration will generate corresponding legal responsibilities, who will pursue it, and the relationship between filing and registration and judicial review needs further study.
Question 10: What is the difference between project filing and approval? 2. "Examination and approval system" refers to the system that enterprises need to report the specific information of the project to the corresponding * * * management authority for examination and approval, otherwise the project will not be established. At present, the state decentralizes project approval, and only foreign-funded projects are approved. Domestic-funded projects are filed at the grassroots level (provinces, cities, districts and counties), and their purposes have legal effect. Consult the local development and reform bureau or economic commission for details.