Introduction of Fengtai Huaihe River Bridge?

Fengtai Huaihe River Bridge is located in the southeast of Fengtai County, Huainan City, Anhui Province. It is a cable-stayed bridge with two towers and two cables built by modern new technology, and it is an important bridge on the Huaihe River.

Engineering situation

Fengtai Huaihe River Bridge started construction on New Year's Day 1986 and was opened to traffic on May/990 1 day. The accumulated use of funds is 45 million yuan.

Bridge building structure

The bridge has a total length of 766 meters, a deck width of 15 meters, four lanes in both directions and a design speed of 80 kilometers per hour. The main bridge of the bridge is a prestressed concrete cable-stayed bridge with twin towers and double cable planes, with a total length of 452 meters and a fully floating system. The span combination of the bridge body is 38m+76m+224m+76m+38m, and it is suspended by a box girder with a weight of1.20t.. The approach bridge is hoisted by prestressed concrete T-beam, with a span of 30 meters, 9 holes on the south bank of Huaihe River 1 hole and Fengtai Bank. The bridge foundation is a reinforced concrete structure, and the pier is a bored rock-socketed cast-in-place pile with a rock-socketed depth of 3 meters. Pier No.4 of the main pier is an open caisson with a diameter of12m and a rock-socketed depth of 8m. The cables are tensioned from top to bottom. The stay cables are 5mm galvanized high-strength parallel steel wire bundles, and the cross section is 6 1 wire, 73 wire, 85 wire and 109 wire, with 368 cables in the whole bridge.

History of bridge construction

Fengtai, an ancient city, has long been a transportation and military center, which is beneficial to shipping and unfavorable to itself. During the "Seventh Five-Year Plan" period, the country was rich and strong, Huainan and Huaibei were rich and strong, and the development of Huaibei mines was arduous, and the exchanges only depended on Laizhou. Ferry Shui Miao is choppy, with snow, rain and fog naturally; Car and road are harmonious, goods are in the way, business travel is difficult to return, time-consuming and misleading; Traffic between East China and northwest Anhui, Henan, Shanxi and Shaanxi is seriously blocked.

With the attention of Party committees and governments at all levels, the Ministry of Communications, the Ministry of Coal and Metallurgical Industry and the planning and transportation departments of provinces, cities and counties, Fengtai Huaihe River Bridge was completed. The project was designed by Anhui Highway Survey and Design Institute and constructed by Anhui Road and Bridge Company. 1 new year's day, 1986, officially started construction,1may, 19901day, with a total capital of 45 million yuan. The people of Fengtai County have made great contributions to the construction of the bridge. The bridge has fifteen holes, with a length of 716m and a main span of 224m. Foundation, most of the piers are bored rock-socketed cast-in-place piles with a rock-socketed depth of 3m; Pier No.4 is an open caisson, which is straight through12m, embedded with rock for 8m, and poured with reinforced concrete. Bridge deck, with an elevation of 35 meters and a width of 20 meters, the approach bridge is hoisted by a 30-meter-long T-beam, and the weight of the main bridge system is 120 ton box girder. This 90-meter-high cable tower has 368 cables tensioned from top to bottom. The supporting approach roads at both ends of the bridge are spacious, with a length of 1.927 m, and a magnificent circular road island is connected with the road. The whole building, with Yandun Mountain in the east and Fengtai City in the west, is 5 Li Long. Hongqiao opens the sky, magnificent; Giant cable around the air, magnificent; Millennium water flattens, Millennium wind promotes prosperity. People cheered:

The long bridge hangs high in the sky, and the pillow city bears the mountain.

The cable tower is inserted into the cloud, and the inclined cable is embedded in the Longtan.

Guanjin has a bumpy road in the past, and the country will take on a new look in the future.

Cars run like stars and people fly in the blue sky like geese.

First overhaul of Fengtai Huaihe River Bridge

As the second cable-stayed bridge in Anhui Province, Fengtai Huaihe River Bridge was overhauled for the first time since 2007 10, and 64 PE sheaths of stay cables were repaired.

Fengtai Huaihe River Bridge was completed on New Year's Day in 1986 and officially opened to traffic on 1 May, 990/day. It has been running for more than 17 years. The total length of the whole bridge is 752 meters, in which the main bridge is a prestressed concrete cable-stayed bridge with twin towers and double cable planes, with a total length of 452 meters, and the approach bridge is a simply supported T-beam bridge with a span of 30 meters. Due to the long opening time and large traffic flow, the bridge has many diseases at present. The whole overhaul project is divided into two phases, with a total investment of120,000 yuan.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.