As the most dynamic factor in productivity, modern information technology is rapidly changing the face of traditional construction industry because of its wide application. We believe that information construction is to enjoy all aspects of information in the whole process of engineering construction, and orderly store and filter the fleeting information of manpower, materials, machinery and capital in the process of technology, commerce, materials, quality, safety and administration, so as to provide corresponding, appropriate, accurate and low-cost information for management decision-making. These processes are largely completed by computers. This not only improves the efficiency of information processing and storage in project management, but also greatly improves the effectiveness of project management.
I. Construction of hardware facilities
1, the project department is equipped with 6 computers, among which the project manager is equipped with ultra-thin laptop to meet the needs of mobile office and image display; The positions of deputy project manager and chief project engineer are equipped with computers respectively. In particular, the project engineer should ensure that the graphics processing function meets the functional requirements of virtual reality.
2. The project department set up a multimedia electronic conference room and purchased a projector. When the project is accepted, reported and checked by the leaders, the notebook computer is connected to the projector for demonstration, which is intuitive and reflects the technical and management level of the project.
3. Specially purchase digital cameras to record the nodes and key parts of the construction process, so as to facilitate the data preparation for quality acceptance, cup evaluation and demonstration project acceptance in the future.
4.HP8300 series recorders are considered as storage devices, and all engineering data can be carved into CDs for permanent storage.
TV monitoring system has been widely used in our company. The TV monitoring network will be established in this project site to strengthen the safety and civilized management of the construction site. The TV monitoring network consists of the general control room and probes. There are two types of probes: stationary and rotary. Set fixed probes around buildings, entrances and exits of gates and living quarters. The rotary probe is arranged on the working face.
Second, the network construction
1, intranet
The project department establishes a local area network to share internal information resources.
2. Internet
The project department enjoys the Internet through the server.
2. 1 Through the Internet, you can communicate with the outside world and the company headquarters, send file notifications and transmit information, which can obviously save the manpower used in office and improve efficiency.
2.2 Through websites such as "China Construction Network", you can inquire about standard materials and conduct online inquiry and procurement of engineering materials.
2.3 Establish an independent homepage website, update the construction situation in real time, provide sufficient information, meet the social concern for engineering construction, show the corporate image and accept social supervision.
Third, the software system configuration
Make full use of integrated software in the construction site to improve the level and grade of project management.
1. Project management software is used to control progress and resources reasonably and effectively.
2. The material management and cost control of this project adopts the company's EPCCS software, so as to reduce man-made waste and ensure the sufficient supply of materials in multi-disciplinary and high-speed construction.
3. The on-site formwork system adopts the formwork supporting design system of Chen Zhong Research Institute, and the formwork supporting scheme and formwork engineering quantity are clear at a glance, which is very convenient.
4. SJ series products are adopted in the project budget and final accounts, and the steel bars are double-sampled, so the relevant data can be enjoyed quickly.
5. Automation office software and CAD system are widely used on site.
6. Adopt the company's unified financial professional software to facilitate data sharing.
Fourth, organization
Establish an information team headed by the chief engineer, coordinate data sharing among various departments, deal with problems in the use process, and train relevant personnel.