New house decoration mode
First, all-encompassing.
This method is convenient and quick, and the decoration company is responsible for it from the early stage to the late stage, and the owner only participates in the examination and determination of the design scheme and budget and the final acceptance of the project. Design, construction and material selection are all completed by the same company, and the final effect will be more complete and the style will be more unified. However, in the current decoration market, companies and employees are mixed, and it is really not easy to identify and select, especially in the purchase of building materials, which is likely to be tricky.
Second, half a pack
Semi-package is between full package and clear package, which means that the owner is responsible for purchasing the main materials, while the design and auxiliary materials are purchased and provided by the decoration company or the construction team. The main building materials are purchased by ourselves, which is more secure in terms of safety and economy. The decoration company helps them design, so they don't have to study the design, as long as you know more about the building materials. But there is still a lot of time to run the building materials market, and decoration is not easy. When signing the contract, you must specify the details, otherwise it will be easy for the decoration company to take advantage of it and buy everything.
Third, clear the package.
Refers to the contract that the owner buys all materials and finds a decoration company or a decoration team to undertake the project. The decoration company or construction team is only responsible for the actual decoration construction, while the design, material selection, material procurement and acceptance are all completed by the owner. The owner has the greatest initiative in clearing the package, and everything is under his own supervision and control, so it is easy to rest assured. Compared with other methods, the price is more economical and easier to control, which eliminates the chance of being cheated. But the owner has to spend a lot of time and energy running around. It is also necessary for the owner to know the professional knowledge of materials and construction, and to be familiar with the market conditions.
How much is the decoration of a 90 square meter house?
1, about 30,000 paperbacks;
2, half a package is a common way in the market, 90 square meters is about 40,000 to 60,000;
3, all-inclusive because the main material is good or bad, the price is not capped, depending on your requirements.
General decoration advocate material costs are as follows:
Ceramic tiles: about 6000.
Paint: 1000 or so.
Upper limit: around 2500.
Doors and windows: about 3000.
Cabinet: about 3000.
Bathroom: about 5000.
Hydropower transformation: about 5000 yuan.
Labor cost: about 9000 yuan.
4, clearing the package, the current labor cost is 200 to 400 a day, depending on how many renovation projects you have and the duration of the project.