The general process is as follows: there is a piece of land (the design and repair of the house are the first tasks). Dig the soil first and lay the foundation (this depends on the height of your floor, and the structure of the house affects the choice of materials and the depth of the foundation, such as the bond strength of cement and the size of steel bars). Second, after the foundation is laid, you need to pull the protective net (to prevent bricks from falling and hurting people). Second, build a house. (If the tile structure is not capped, there is no need for bricklayer, and it is directly sealed with reinforced concrete. Generally speaking, a bricklayer is actually a bricklayer. (3) Water and electricity treatment of the whole building structure. (The treatment of sewers and oil fume pipes belongs to design and construction) The above types of work include: architects and migrant workers (construction teams). Secondly, decoration: interior and exterior decoration. Exterior decoration can be painted with exterior paint or plastered with exterior wall tiles (this type of work requires painters and masons). Exterior wall decoration materials: exterior wall brick, exterior wall paint, doors and windows. For interior decoration.
Expand:
Foundation refers to the soil or rock mass that supports the foundation under the building. As a building foundation, the soil layer is divided into rock, gravel soil, sand soil, silt soil, cohesive soil and artificial fill. There are two kinds of foundations: natural foundation and artificial foundation (composite foundation). Natural foundation is a natural soil layer that does not need to be reinforced. Artificial foundation needs artificial reinforcement, such as stone chip cushion, sand cushion and mixed lime soil backfill and compaction.