Property type: commercial apartment
Property fee: 3.8 yuan/flat/month.
Decoration: Lite.
Building type: high-rise building
Parking space: * * underground parking space 1384.
The Bay Area era covers an area of 46,000 square meters, with a total construction area of about 6.5438+0.8 million square meters. It is jointly developed by the five major shareholders, Hong Xin Industrial Group, Baode Ying Property, the vast number of properties, the winning clothing and the cutting-edge equity. The developer is Dongguan Mamintai Real Estate Development Co., Ltd. The project is located in Mayong Business Planning Area, relying on the Pearl River Delta Automobile Expo Center Industrial Park and Mayong Riverside Commercial and Residential New District. According to the location advantage near Guangzhou Economic Development Zone, the project will be planned and developed into a commercial complex integrating business, office and other supporting facilities. Responding to the planned Suigang City, we will build a bridgehead on the east bank of Dongjiang River. According to the requirements of the planning points, the whole product is mainly divided into office and commercial facilities. Development is divided into two stages. Phase I Planning 1-3 Building. The product plan is 38-60m2 duplex with 2 bedrooms, 3 bedrooms and 4 bedrooms, which is super high in utility rate, with a total of 1334 households. The whole project is designed with a basement as a parking garage and equipment room. The buildings are all designed with plate-type buildings, arranged at will, and strive for a larger and wider river landscape and a landscape courtyard built inside the project. The layout of slab buildings is compact, the traffic area of public buildings is strictly controlled, and the utilization rate is maximized. The second phase of the product is under planning. The project is separated from Guangzhou Economic Development Zone by a river, with a distance of about 1 km, a distance of about 10 km from the center of Huangpu District in Guangzhou and a distance of about 16 km from the center of Dongguan. The area where the project is located has convenient transportation, and multi-dimensional traffic such as subway, urban rail, expressway, main road and bus express line is closely connected with the project plot, with high accessibility, realizing the Pearl River Delta half-hour living circle.
Click to view: Bay Area Time Details.