20 10 On July 28th, a groundbreaking ceremony was held at Wuping Interchange in Shifang-Liu Dong section of expressway (Gu Lei Port to Wuping Expressway) in Gu Wu, Fujian Province.
20 10 On July 28th, a groundbreaking ceremony was held at Wuping Interchange in Shifang-Liu Dong section of expressway (Gu Lei Port to Wuping Expressway) in Gu Wu, Fujian Province. Guwu expressway (Wuping Section) is the first expressway newly built in Fujian Province on 20 10.
The ancient Wu expressway is the eighth cross in the "three verticals and eight horizontals" of the expressway network in Haixi, starting from Gu Lei Port in Zhangzhou and ending in Liu Dong Town, Wuping County, Longyan. It is one of the channels for Fujian Province to dredge ports and the mainland to enter Fujian, and it is also one of the most important channels for expanding cross-strait exchanges and cooperation.
Wuping section has a total length of 38.032 kilometers and a total investment of 3.035 billion yuan. It starts from Sanfang Village, Shifang Town, connects with expressway, Shen Chang (G25), passes through Chengxiang Township, Pingchuan Town, zhongshan town, and ends at Fox Gorge, Liu Dong Township, Fujian and Jiangxi, and is connected with the national expressway Net Jiguang (G35) expressway. It passes through 5 townships and 17 administrative villages. The whole line is built according to the standard of two-way four-lane expressway, with a subgrade width of 24.5 meters and a design speed of 80 kilometers per hour.
At present, the section from Shifang Town to Wuping County has been successfully opened to traffic from 2065438 to February 2003. The section from Wuping County to Jiangxi Province is under construction, and it is expected to be completed in early 20 15 at the earliest.
The above is the introduction of CBI Zhong Da Consulting to Guwu Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.