First, we should recognize famous brands when purchasing: At present, the market is full of fake and shoddy goods, and toxic substances explicitly eliminated and prohibited by the state also flood into people's homes. Ordinary consumers should choose brand products with high popularity, good reputation, high anti-counterfeiting degree and passed the international quality system certification.
2. Waterproof parts should be comprehensive: bathroom (return height not less than 1.8m or full height), kitchen, balcony (return height not less than 0.3m), all floors and walls of the first floor residence (return height 0.3m), basement floor and walls should be waterproof and moisture-proof.
Third, the thickness of the waterproof layer should be sufficient: the thickness of the waterproof layer directly affects its waterproof life. If the thickness of waterproof layer is reduced, its waterproof life will be reduced.
Fourth, the construction technology should be meticulous: the joint between the wall and the ground, the corner of yin and yang, the water pipe, the floor drain, the periphery of sanitary ware, and the gouging at the laying place of cold and hot pipes are the key waterproof parts, so the construction must be meticulous.
5. Water-closing experiment after completion: After waterproof construction, close the entrance and drain, store water indoors for 24 hours, and check whether there are any leakage points.
Six, such as leakage, must immediately implement remedial measures.
The above six items are the skills of purchasing, and then we will choose the details of waterproof materials:
Ceiling: Because the water vapor in the bathroom is heavy, materials with waterproof, anticorrosive and antirust properties should be selected.
Floor: be sure to be waterproof before laying floor tiles; After the ceramic tile is laid, it is necessary to ensure that the surface of the ceramic tile has a drainage slope (generally 1 or so is appropriate), and the slope faces the floor drain; After laying the tiles on the ground, you must do a closed water experiment for at least 24 hours; When laying floor tiles, pay attention to the joints and alignment with the wall tiles to ensure the overall sense of the whole bathroom and avoid visual clutter.
Wall: The tiles on the wall should also be moisture-proof and waterproof, and the tiles should be flat and aligned with the tiles to ensure the overall feeling of the wall and the ground; If you meet the outlet of the water supply pipe, the cut of the ceramic tile should be small and appropriate, so that the flange cover on the water feeder can cover the cut and make the appearance perfect.
Doors and windows: it is best to have windows in the bathroom to facilitate ventilation; If there are no windows, pay special attention to the details of the door. In order to prevent the water in the bathroom from overflowing, the door boundary should be slightly higher than the inside of the bathroom; The gap between the bathroom door and the ground is larger to facilitate the return air; If it is a sliding door, it is necessary to make a waterproof layer between the sliding door and the bathroom floor tile.
Circuit laying: Tin must be hung at the wire joint between bathroom and bathroom, and waterproof glue cloth and insulating tape should be wrapped in turn to ensure safety; The wire body must be wrapped with a flame retardant tube; All switches and sockets should have moisture-proof boxes, and their positions should be determined according to the size and position of electrical appliances to ensure convenient and reasonable use.
Waterway reconstruction: it is best not to make too much changes to the water supply and drainage lines in the bathroom. If you want to change it, you should decide according to the specific situation. For example, the location of water supply and drainage will be different for different models of washing machines.
Sanitary ware installation: it is best to remember the spacing of sewer holes before decoration, and choose sanitary ware such as bathtub, toilet, toilet and washbasin according to the size to avoid inappropriate size during decoration; The installation of the toilet should be sealed with toilet mud first, and then fixed with expansion screws or glass glue, so that the toilet can be repaired if it is blocked.
The above are the skills of purchasing waterproof materials for Wenzhou decoration shared by Bian Xiao. For more decoration information, please pay attention to Tuba Rabbit Wenzhou Decoration Network.
Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~