The term "secondary water supply facilities" as mentioned in these Measures refers to the auxiliary facilities such as pump room (station), water tank (pool), water pump, valve, water meter, electric control device, power distribution facilities, safety monitoring facilities, inspection facilities, disinfection and advanced treatment equipment, water supply pipeline, etc. set for secondary water supply, but does not include fire fighting, hot water and direct drinking water. Article 4 The people's governments of cities and counties (cities, districts) shall establish and improve the government responsibility system for secondary water supply, and promote the construction and management of secondary water supply facilities as a whole. Fifth Municipal People's government housing and urban and rural construction departments responsible for the city's secondary water supply management, specifically responsible for the supervision and management of secondary water supply in Xiaogan central city.
County (city, district) people's government to determine the urban water supply department is responsible for the administrative area of the two water supply management.
City, county (city, district) health department of the people's government is responsible for the health supervision of two water supply facilities.
City, county (city, district) people's government development and reform, finance, public security, natural resources, urban management and other departments according to their respective responsibilities to do a good job in the management of secondary water supply. Sixth urban public water supply enterprises and secondary water supply management units shall establish and improve the water supply emergency security system, formulate emergency plans, and improve the emergency security capacity of secondary water supply. Article 7 The competent department of urban water supply of the people's government of a city or county (city, district) shall, when preparing the special plan for urban water supply, rationally arrange the secondary water supply facilities, and make overall consideration of the layout of centralized water storage and pressure regulating facilities in the water supply pipe network area, so as to ensure smooth pipe network and even pressure, and promote energy conservation and consumption reduction. Eighth new construction, renovation and expansion of housing construction projects, water supply pressure or water demand exceeds the city's urban public water supply pipe network service pressure standards, the construction unit shall support the construction of secondary water supply facilities.
Supporting the construction of secondary water supply facilities should be designed, constructed, accepted and delivered at the same time with the main project of housing construction, and its construction investment should be included in the total project budget. Article 9 The competent department of natural resources of the people's governments of cities and counties (cities, districts) shall solicit the opinions of urban public water supply enterprises on the design scheme of secondary water supply facilities that should be connected with the urban public water supply network when examining and approving the planning and design scheme of new construction, renovation and expansion of housing construction projects.
When reviewing the construction drawing design of housing construction projects, the construction drawing review institution shall review the design scheme of secondary water supply facilities simultaneously in accordance with the relevant specifications of urban secondary water supply projects and the technical guidelines of this Municipality, and solicit the opinions of urban public water supply enterprises.
The urban public water supply enterprise shall, after receiving the comments in the first and second paragraphs of this article, give a reply within the prescribed time limit or the time limit of its public commitment. Article 10 The design of secondary water supply facilities shall strictly implement the relevant specifications of urban secondary water supply projects and the technical guidelines of this Municipality, match the water supply capacity of urban public water supply network and the water demand of users, and meet the requirements of environmental protection, construction and installation, operation management and maintenance inspection.
The secondary water supply facilities shall be designed and constructed according to the terminal charging standards of one meter per household, one meter per household and one meter per household of urban public water supply enterprises.
The secondary water supply facilities shall be set up independently and shall not be mixed with other facilities such as commerce and fire fighting. Article 11 The quality of water supply pipelines, materials, equipment and appliances used in the construction of secondary water supply facilities shall conform to the provisions of the technical guidelines for secondary water supply projects in this Municipality. Twelfth to encourage the construction unit to entrust the local urban public water supply enterprises to build a unified secondary water supply facilities. Thirteenth construction units in the organization of housing construction joint completion and acceptance, it shall notify the city public water supply enterprises to participate in the acceptance of secondary water supply facilities.
Before the delivery of the secondary water supply facilities, it shall be washed and disinfected in accordance with the relevant specifications of the urban secondary water supply project and the technical guidelines of this Municipality, and the water quality of the secondary water supply must be tested by a water quality testing institution with corresponding qualifications.
Two water supply facilities without acceptance or unqualified acceptance, water quality testing unqualified, shall not be put into use. Fourteenth new construction, renovation and expansion of housing construction projects after the acceptance of secondary water supply facilities, the construction unit shall be handed over to the city public water supply enterprises for unified operation and maintenance.
The relocation of secondary water supply facilities of existing residential buildings shall be organized by the people's governments of cities and counties (cities, districts) to make plans and take measures to move within a time limit. The specific organization and implementation shall be the responsibility of the local sub-district office and the Town People's Government. Article 15 If the secondary water supply facilities of built residential buildings have been tested by urban public water supply enterprises, which meet the relevant specifications of urban secondary water supply projects and the technical guidelines of this Municipality, and most house building owners agree to transfer them according to law, the urban public water supply enterprises shall be responsible for operation and maintenance after the house building owners sign the secondary water supply service contract with the urban public water supply enterprises.