What are the procedures for the transfer of land and factory buildings?

Workshop purchase and transfer link 1: provide the required information to the financial deed tax collection department;

1. Copy of business license, articles of association, resolutions of shareholders' meeting, legal person ID card, factory director ID card, and relevant original materials built by the seller (such as construction and installation invoices, etc.). )

2. Agreement between the buyer and the seller of the factory building (provided together with the real estate sales invoice issued by the local tax department)

3. The overall evaluation price of assets issued by the medium-priced institution in the real estate transaction evaluation (not necessarily required).

Deed tax collection basis:

1. When the agreed price (or fare) of the factory building is not lower than the minimum taxable value of the plot specified by the deed tax collection department, the deed tax shall be directly collected at the agreed price, and a deed tax certificate shall be issued.

2. When the agreed price is lower than the minimum taxable value of the plot set by the deed tax collection department, it is necessary to provide the overall asset evaluation price issued by the medium-priced institution in the real estate transaction evaluation. Finally, the deed tax is levied at the overall evaluation price of the assets not lower than the minimum taxable value of the plot set by the deed tax collection department, and a deed tax certificate is issued.

Extended data:

Characteristics of industrial workshop

Industrial plants can be divided into single-storey industrial buildings and multi-storey industrial buildings according to the building structure. Most of the workshops in multi-storey industrial buildings are found in industries such as light industry, electronics, instrumentation, communication, medicine and so on. The floors of such workshops are generally not very high, and their lighting design is similar to that of common scientific research and experimental buildings, and fluorescent lighting schemes are mostly adopted.

The workshops in machining, metallurgy, textile and other industries are generally single-storey industrial buildings. According to the production needs, there are more multi-span single-storey industrial workshops, that is, multi-span workshops arranged side by side in parallel, and each span can be the same or different as needed.

The width (span), length and height of a single-storey factory building are determined according to the technological requirements on the basis of meeting certain building module requirements. The plant span b is generally 6,9, 12, 15,18,21,24,27,30,36m. L: The length of the workshop ranges from tens of meters to hundreds of meters.

Workshop height h: generally 5 ~ 6m lower, 30 ~ 40m higher, or even higher. The span and height of the workshop are the main factors considered in the lighting design of the workshop.