Part of Xinhua Road in Zhongshan District has become a one-way street.
The renovation and upgrading project of Zhongshan area involves five roads: Datong Road, Siming East Road, Xiaxi Road, Xinhua Road and Gong Yuan West Road.
Renovation content: sidewalk and motor vehicle pavement upgrading, bus station upgrading, pipeline upgrading, landscape and lighting engineering.
Duration: 2065438+09101October 26th to 202010/0.
1, 65438+1October 2 to 65438+February 14, Xinhua Road (Tongan Road to Gongyuan South Road, Southwest Gate of Municipal Public Security Bureau to Forbidden City), the construction section is adjusted to a one-way street from south to north.
Bypass route: Forbidden City Road, Xiahe Road, Park East Road, Park West Road and other peripheral roads.
The section from the southwest gate of Xinhua Road Public Security Bureau to the south intersection of Park maintains two-way traffic to meet the police demand.
2. In the sections such as Siming East Road and Datong Road, the original roads are all two-lane one-way traffic. After half of the enclosure is closed, the rest will pass in one direction.
3. Xiaxi Road is constructed by subsection and half fence to ensure the vehicles to pass in and out. Park West Road only builds sidewalks, which has little impact on motor vehicle traffic.
4. Only sidewalks are built on Park West Road, which has little impact on motor vehicle traffic.
Bus adjustment
Due to the renovation project of municipal facilities in Zhongshan District, the bus lines and stops of No.4 and No.21have been adjusted from 20 19 1 since 2 October.
Affected by this, the two bus lines and stops passing through the above sections will be adjusted from 20 19 1 1.2, and the specific scheme is as follows:
Temporarily adjust the route direction of Route 4 to Wenping.
Route direction: Depart from Qixing Bus Station, arrive at Datong intersection of Siming North Road, pass through Siming North Road, Siming South Road, Zhenhai Road, Xinhua Road and Gong Yuan South Road to Xinhua Road Station, and run according to the original route. The return trip is the same.
Field adjustment
Temporary stop: Chinatown
Temporary stop reduction: Datong Road
Temporarily adjust the route direction from 2 1 road to the railway station.
Route direction: Xiamen University (South Putuo) starts from Zhenhai Road and Siming South Road, and then connects with the original route via Zhenhai Road, Xinhua Road and Park South Road to Xinhua Road Station. The return trip is the same.
Field adjustment
Temporary stop: First Hospital
Temporary stop reduction: Zhongshan Road and Datong Road
After the relevant traffic control measures are lifted, the above two lines will resume their original operation.
Part of Baisong Road in Baisong area has become a one-way street.
20 191From October 26th to February 29th, 2020, Lian Yue Road and Baisong Road in Baisong District will also be upgraded.
During the renovation, sidewalks and motorways will be demolished and built, and bicycle lanes with a width of 1.5 meters will be built on the sidewalks, which will have a great impact on vehicles.
1, Lian Yue Road will be constructed in three staggered working faces to ensure the traffic as much as possible.
Construction is divided into three steps:
The first step is to build the Hubin North Road-Jiahe section of Lian Yue Road about 650 meters, and simultaneously build the Hou Yu Road-Jiahe section of Baisong Road about 730 meters;
The second step, the construction of Lian Yue Road Xianyue Road-Hubin North Road, about 820m, excluding Baisong Road;
The third step is to build a 400-meter-long section from Yuhoukou to Lianyuekou of Baisong Road, combining with the simultaneous construction of Lian Yue Road and Baisong Road.
2. At the same time, Baisong Road also needs to be built. The first is the section from Hou Yu intersection to Jiahe intersection, which is divided into three sections to ensure two-way traffic. After that, the section from Hou Yu intersection to Lian Yue intersection will be constructed again, with four and a half lanes closed, and the remaining two lanes will travel from east to Xidan.
There are many schools on the road from Hou Yu intersection to Lian Yue intersection. During the construction of this section, four lanes are closed, and the remaining two lanes are eastbound to Xidan. Meanwhile, car owners can bypass Lian Yue Road-Hubin North Road-Changqing Road, or Yu Xiu East Road-Xianyue Road-Hou Yu Road.
At present, the construction time of this section is planned to be 65438+ 10 during the winter vacation from the beginning of October to the end of February 2020. The specific time period will be adjusted according to the construction progress, and a notice will be issued in advance.
Closed Road Section of Zengcuo _ Xili Section in Siming District
From now until June 65438+ 10/0 next year, some sections of Zengcuo _ Xili in Siming District will be closed.
Due to the construction needs of the first-stage drainage and flood control project in Zengcuo _ Xikeng Reservoir Basin, from now until June next year at 65438+ 10/0 at 24: 00, Zengcuo _ Xili (187 to Zengcuo _ West Road intersection) in Siming District is closed. At that time, vehicles passing through this section can detour along "Zengcuo _ West Road-Zengcuo _ Beier Road-Zengcuo _ Xili" in advance.
Mei Jian South Road in Haicang District is closed.
From now until next year1October 30th, Haicang District will be closed to Meinan Road 165438+.
Due to the construction needs of Haicang District to Meicun Anjufang Project, from now until next year,165438+1October 30, Haicang District will be closed to Meinan Road for construction, and vehicles are prohibited from passing.
Hu 'an South Road and Hu 'an South Third Road
From now until165438+1October 23rd, Hu 'an South Road and Hu 'an South Road will be changed into one-way streets in time-sharing sections.
Due to the construction needs of the road reconstruction project around Haicang Sports Center, from now until165438+1October 23, Hu 'an South Road and Hu 'an South Road in Haicang District will be changed into one-way streets in time-sharing sections.
Specific restrictions and bypass routes are as follows
1, from now on to165438+1October 1 1, Hu 'an South Road (from the third intersection of Hu 'an South Road to Haicang Avenue) is only allowed to pass from west to east (from the third intersection of Hu 'an South Road to Haicang Avenue). Vehicles can detour along "Haicang Avenue-Jiaosong Road-Husan South Third Road" in advance.
2. From now until165438+1October 23rd, only one-way traffic is allowed from south to north (Jiaosong intersection to Hu 'annan intersection). Vehicles can detour along "Hu 'an South Road-Haicang Avenue-Jiaosong Road" in advance.