2. The qualification of design consulting units is divided into three grades, namely:
The engineering design scope and area of Grade A engineering design units undertaking construction projects in corresponding industries are not restricted.
Class B engineering design units can undertake engineering design tasks of small and medium-sized construction projects in corresponding industries, and the areas undertaking engineering design tasks are not restricted.
Class C engineering design units can undertake the engineering design tasks of small-scale construction projects in corresponding industries. Undertaking engineering design tasks is limited to the administrative areas under the jurisdiction of provinces, autonomous regions and municipalities directly under the central government.
Units with Grade A and Grade B qualifications can undertake corresponding consulting business, and can also undertake corresponding engineering design special qualification business unless otherwise specified.
Do units engaged in safety standardization consulting need qualifications? You don't need qualification to engage in safety standardization consultation, but you need the corresponding level of evaluation qualification to engage in safety standardization evaluation, but both consultation and evaluation are done by the same company. Enterprises will not choose units without evaluation qualification for consultation, otherwise they will have to find other companies, and the cost is very high. Safety evaluation qualification has nothing to do with safety standardization consultation or review. '
1. The qualification applicant shall submit the Registration Form of XXX Safety Production Standardization Appraisal Unit, the original Registration Form of XXX Safety Production Standardization Appraisal Personnel and the copy of "Audit Materials" in the Audit Filing Form (see Annex 1). Units applying for the qualification evaluation of safety production standardization in industrial and mining industries must have more than 6 full-time evaluators who have obtained the qualification certificate of the industry evaluation and training at or above the municipal level.
Two, the qualification audit is given priority to with material audit, on-site audit when necessary. On-site audit needs to review the original relevant materials, and the time will be notified separately. The audited entity will publicize it to the public for 7 days. If there is no objection, the Municipal Bureau will approve the qualification evaluation of the audited entity and announce it to the public. If there is any objection, it will be verified separately. Units that pass the qualification examination will be reported to the Provincial Safety Supervision Bureau for the record.
Third, others.
(a) the applicant shall ensure that the application materials are true and effective, and make careful preparations.
(2) The industrial and mining industries mentioned in this Notice include: industrial and trade enterprises, dangerous chemicals, fireworks (wholesale) business, non-coal mines, etc. (3) The applicant shall send the application materials (in duplicate) to the Standardization Department of Ningbo Safety Supervision Bureau (No.XX, XXX Road, XXX District, XXX City). Contact person: XXX Tel: (fax).
Attachment:
1, qualification examination and filing of the third-level safety production standardization evaluation unit in industrial and mining industry;
2. List of existing laws, regulations, documents and standards
3. List of Facilities 20 1 1 Attachment on September 5, 2008 1 Qualification Audit Record Form of Level-III Safety Production Standardization Evaluation Unit in Industrial and Mining Industry Audited unit: contents of serial number audit and comments on audit results of audit materials.
1 Application Registration Form
1, XXX city safety production standardization evaluation unit registration form;
2, XXX city safety production standardization evaluation personnel registration form;
It is qualified as a legal person and has no record of illegal acts.
1, business license of enterprise as a legal person, with a registered capital of more than 500,000 yuan;
Have a fixed workplace, office facilities and daily management personnel suitable for their work, and have the necessary technical support conditions.
1. Property right certificate or lease contract of the fixed office;
2. List of existing laws, regulations, documents and standards;
3. List of equipment and facilities;
4. Have a sound internal management system, review procedural documents and review personnel files, etc.
1, enterprise review quality control and other related management systems;
2, the full-time appraiser's labor contract and proof of paying the basic social endowment insurance premium this year;
There are more than 6 full-time assessors trained by the safety supervision department at or above the municipal level, and the professional structure can meet the assessment requirements of this major.
1, full-time assessor's academic qualifications, professional titles and assessment qualification materials;
2. Professional requirements of full-time staff of relevant industry evaluation units: industry and trade: there shall be no less than two mechanical majors and no less than 1 one electrical major. Hazardous chemicals industry: there shall be no less than 2 chemical majors and no less than 1 major in mechanical or electrical fields. Non-coal mines: there shall be no less than 2 mining majors and no less than 1 mechanical or electrical majors. Audit conclusion: □ Qualified □ Unqualified Reviewer: Note: "Audit result" should be marked "√" and "Audit conclusion" should be marked "√" before the corresponding options. Attachment 2 List of Standards for Archives of Current Laws and Regulations Unit Name (Seal): Date of Filling:No. NameNo. (StandardNo.) Archives of Laws, Regulations and Standards
note:
1. The appraisal unit shall collect effective laws, regulations, documents and standards related to the appraisal industry of the unit.
2. Tick "√" in the column of "laws and regulations", "archives" or "standards".
Attachment 3 List of Installation and Facilities Company Name (Seal): Serial Number Name Quantity Remarks 1 Computer Notebook Desktop Computer 2 Printer 3 Copier 4 Filing Cabinet 5 Other Fillers: Person in Charge of the Company (Signature): Date Remarks:
1, "Other" fill in the devices and facilities related to safety production standardization that the audited entity considers necessary; 2, "remarks" column to fill in the audited units that need to be explained;
What qualifications do the consulting, design, construction and construction units of the data center need? If it is a large-scale formal consulting project, it needs engineering consulting qualification.
If it is a data center construction implementation project, it needs system integration qualification.
If it is * * *, state-owned enterprises and other investment projects, it also needs information security qualification.
As for the level of qualification, it is related to the nature and scale of the project and the requirements of the owner.
Generally speaking, the requirements for the qualification of secondary system integration are not too high.
How to apply for architectural design consulting qualification? You must apply for design qualification. Which one is it?
What are the requirements for a qualified construction unit? A qualified construction unit should have the following conditions: registered capital, technical personnel, technical equipment and engineering performance. thank you
Construction enterprise qualification application materials include the following contents:
Enterprise qualification application form and corresponding electronic documents;
Copy of business license of enterprise as a legal person (copy);
Articles of association (copy);
File of the legal representative of the enterprise (copy);
Identity certificate of the legal representative of the enterprise (copy);
The identity certificate of the person in charge of the enterprise (enterprise manager);
Professional title certificate of the person in charge of the enterprise (enterprise manager);
File of the person in charge of the enterprise (enterprise manager);
Graduation certificate of the person in charge of the enterprise (enterprise manager);
The identity certificate of the technical director;
Professional title certificate of technical director;
Proof of project performance of the representative of the technical director;
The post file of the technical director;
Graduation certificate of technical director;
The identity certificate of the person in charge of finance;
Certificate of title of chief financial officer;
The identity certificate of the registered practitioners;
The registered practice certificate of a registered practitioner;
The certificate that the registered practitioners terminate the employment contract with the original employer and the employment contract of the new employer;
The professional title certificate of unregistered professional and technical personnel;
Identity certificate of unregistered professional and technical personnel;
Graduation certificate of unregistered professional and technical personnel;
Proof of old-age insurance for unregistered professional and technical personnel;
The certificate that unregistered professional and technical personnel terminate the employment contract with the original employer and the employment contract of the new employer;
Professional title certificate of special professional and technical personnel;
Identity certificate of special professional and technical personnel;
Proof of endowment insurance for special professional and technical personnel;
The certificate of termination of the employment contract between the special professional and technical personnel and the original employing unit and the employment contract of the new unit;
Enterprise equipment certificate (1, equipment purchase invoice or lease contract, 2, equipment account, 3, instrument list);
Certificate of factory building (house title certificate or house lease contract of factory building);
Materials related to safety production conditions (enterprise safety production management system);
Original and photocopy of enterprise qualification certificate (photocopy);
Annual financial statements of the enterprise (audited financial statements of the enterprise in the last three years: audit reports of accounting firms, including (1) balance sheet, (2) profit and profit distribution statement, (3) cash flow statement, (4) project settlement income and expenditure statement and (5) notes to financial statements);
Annual statistical report of enterprises (statistical report of construction industry in recent three years: (1) basic annual report of production, housing construction and financial situation of construction enterprises, (2) basic information of legal entities in China economic census, (3) production situation of construction enterprises and (4) financial situation of construction enterprises);
Original and photocopy of enterprise safety production license (photocopy);
Relevant certification materials of enterprise's engineering performance ((1) engineering contract, (2) bid-winning notice, (3) completion acceptance record, (4) quality verification data, (5) engineering final accounts data, etc. );
Application form for change of qualification certificate (audit form for change of qualification certificate of construction enterprise);
Restructuring and reorganization plan (enterprise restructuring, division and merger plan); (including the division of assets, personnel and project performance between the new enterprise and the original enterprise);
The approval decision of the superior asset management department or the shareholders' meeting (the approval document of enterprise restructuring, division and merger, the resolution of the shareholders' meeting);
The resolution of the enterprise workers' congress agreeing to the restructuring and reorganization;
Apply for supplementary qualification certificates and other materials;
Loss statement;
Bank credit certificate of the enterprise in the past three years;
Receipt or settlement certificate for overseas projects that the enterprise has paid the business tax for the construction industry in the past three years;
Certificate or valid approval document of enterprise technology (R&D) center or sub-center at or above the provincial or ministerial level;
National building method appraisal archives;
Certification of patented technology;
Certificate of National Science and Technology Progress Award;
Copies of the announcement (or order), cover, catalogue, preface and introduction of national standards and industry standards for engineering construction;
The labor subcontracting enterprise shall provide the post certificates and identity certificates of the personnel required by the standards;
Financial statements and statistical statements for the three years before the enterprise restructuring and division;
The financial statements, statistical statements and the latest consolidated statements of each enterprise in the three years before the merger;
A capital verification report issued by an accounting firm (to be provided when the enterprise is restructured, divided or merged);
Application form for qualification renewal of construction enterprises;
Resolutions or documents of the shareholders' meeting or the board of directors of the enterprise on the change;
Written opinions of the original competent departments of people's construction in industrial and commercial registration province, autonomous region and municipality directly under the Central Government on the qualification change;
A copy of the original business license before the change and the original and copy of the new business license after the change;
(Quality Management System Certification Certificate);
(environmental management system certification certificate);
(Occupational Health and Safety Management System Certification Certificate);
Main honorary certificate;
What qualifications does the gas station construction unit need? Gas station construction units need to be qualified: generally speaking, it is related to the scale of the project, and there is no special requirement, mainly depending on the scale structure type of the gas station to determine the construction qualification. The general contracting qualification and safety production license of housing construction projects issued by the Ministry of Construction are enough.
Gas station, usually refers to a supplementary station that serves automobiles and other motor vehicles and retails gasoline and engine oil, and generally adds fuel and lubricating oil.
Mechanism analysis of electrostatic ignition of flammable and explosive liquids and gases;
Static electricity may be generated in the process of liquid flowing, stirring, settling, filtering, shaking, spraying, splashing, washing and dumping. Static electricity often causes fires and explosions of flammable and explosive liquids. Its starting mechanism is based on dipole layer theory. When a liquid contacts a solid, two layers of charges with equal charges and opposite signs will be formed at its interface, that is, dipole layer. The main reason for the formation of dipole layer is that liquid medium can be dissociated into positive and negative ions in different ways. For example, polar molecular liquids or impurity molecules can be directly dissociated.
Mechanism analysis of electrostatic ignition of flammable and explosive gases
Under normal circumstances, it will not be filled with pure gas. There is static electricity when high-pressure gas is ejected because solid or liquid particles are suspended in these gases. When the high-pressure gas is mixed with solid particles, when the gas is ejected at high speed, the particles and the gas flow together in the tube, and the particles frequently contact and separate from the inner wall of the tube, so that the particles and the wall of the tube are charged with the same amount but different signs respectively. When injecting high-pressure gas, if liquid (non-solid particles) is mixed in the pipeline, spray electrification will occur with the injection of high-pressure gas. This is because when high-pressure gas is ejected, the liquid in the gas will contact with the inner wall surface of the pipeline or nozzle, forming a liquid film on the inner wall surface of the pipeline or nozzle and forming a dipole layer on the solid-liquid interface. When the liquid is peeled off from the wall with the movement of air flow, charge separation occurs, and charged droplets are dispersed in the gas and ejected, resulting in charge.
Several links and causes of static electricity in gas station;
There are many facilities in the gas station area, but static electricity mainly accumulates in the oil storage tank area, oil pipeline, refueling area and tanker. Due to the different structures and locations of various facilities and equipment, the links and reasons for generating static electricity are also different.
When static electricity is generated in the oil storage tank area, the bottom refueling method is generally adopted when the oil storage tank is refueled or poured tank by tank. Although this method is more reasonable than the top oil injection method, when the oil is ejected from the oil injection pipe at high speed, the oil storage tank is charged because of the charging of the injection. At the same time, the impact of oil on the tank wall causes oil mist, which is also easy to cause charge accumulation and discharge.
gas station
1.3.2 Generation of static electricity in oil pipeline and refueling area When oil passes through the oil pipeline from the oil storage tank, it is easy to flow and be charged, resulting in flushing current.
Generation of static electricity of oil tanker. In the process of loading, unloading, transportation and unloading, oil products are repeatedly washed, contacted and rubbed with the tank wall, the crane pipe for unloading and loading oil, resulting in the accumulation of charge and static electricity.
When the charged body reaches a certain electrostatic potential (generally greater than 300v) due to the accumulation of charges, electrostatic discharge will occur, and there will be explosive mixtures in the surrounding space, which may lead to explosion accidents.
What qualifications do you need for offshore oil industry design? Petroleum and natural gas industry engineering design qualification.
Qualification declaration and approval procedures
An enterprise applying for Grade A qualification of engineering survey, Grade A qualification of architectural engineering design, Grade A and Grade B qualification of special design (except Grade B qualification of architectural decoration) and other Grade A and Grade B qualifications of engineering design shall file an application for industrial and commercial registration with the construction administrative department of the province, autonomous region or municipality directly under the Central Government where the enterprise is located. Among them, enterprises managed by the central government directly apply to the administrative department of construction in the State Council, and their subordinate enterprises apply by the central administrative department, and at the same time, they file with the administrative departments of construction in the provinces, autonomous regions and municipalities directly under the Central Government where the enterprises are located at the time of industrial and commercial registration.
Enterprises applying for Grade B qualification of engineering survey, service qualification of engineering survey, Grade B qualification of architectural design, Grade B qualification of architectural decoration design and other qualifications of architectural survey and design below Grade C (including Grade C) shall apply for industrial and commercial registration to the construction administrative department of the local people's government at or above the county level where the enterprise is located. Newly established construction engineering survey and design enterprises can apply to the construction administrative department for qualification only after they are registered in the administrative department for industry and commerce.
Grade A qualification of engineering survey, grade A qualification of architectural engineering design, grade A and grade B qualification of special design (except grade B qualification of architectural decoration) and grade A and grade B qualification of other engineering design shall be examined and approved by the administrative department of construction of the State Council.
The application for Grade A qualification of engineering survey, Grade A qualification of architectural engineering design and other Grade A and Grade B qualifications of engineering design shall be examined and approved by the construction administrative departments of People's Republic of China (PRC), autonomous regions and municipalities directly under the Central Government. The application for Grade A and Grade B qualification for special design of environmental engineering shall be examined by the competent administrative department of environmental protection and construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government. The audit department shall verify the qualification conditions of the construction engineering survey and design enterprises and the information provided by the enterprises applying for qualification.
Application for Grade A and Grade B qualification of engineering design in railway, transportation, water conservancy, information industry, civil aviation and other industries shall be reviewed by the relevant departments of the State Council. To apply for Grade A qualification of engineering survey, Grade A qualification of architectural engineering design and Grade A and Grade B qualification of other engineering design, the the State Council construction administrative department shall entrust relevant industry organizations or expert committees to conduct preliminary examination.
Applications for Grade B qualification of engineering survey, engineering survey service qualification, architectural design qualification, architectural decoration design qualification and other qualifications of architectural survey and design below Grade C (including Grade C) shall be examined and approved by the construction administrative department of the province, autonomous region or municipality directly under the Central Government where the enterprise is registered for industry and commerce.
Excuse me, what qualification design unit is needed for gas pipeline engineering design in enterprises? How about the design qualification of GB2/GC 1, 2, 3? GB2 is a heat pipe-this is definitely impossible.
GC 1\2\3 are all industrial pipelines-it depends on the gas parameters (pressure and temperature) you design.
It is best for the design unit to have the qualification of GB 1 (town gas pipeline).
At the same time, the design institute should also obtain Grade A survey and design qualification.
What qualifications do fire maintenance units need? On May 1 2009, the new fire protection law was promulgated. The difference between the old and the new is that the maintenance of fire-fighting facilities must be carried out by qualified professional companies. However, at present, the local construction bureaus have not certified the fire maintenance companies. It is the default engineering company with construction qualification. So the qualification of maintenance, that is, your company has the qualification of fire engineering construction, is ok. The construction of laws and regulations in various places is slightly lagging behind.