The term "construction project" as mentioned in these Regulations refers to the civil engineering, construction engineering, installation engineering and decoration engineering of lines, pipelines and equipment. Article 3 The construction administrative departments of local people's governments at or above the county level shall be responsible for the supervision and management of the quality of construction projects within their respective administrative areas. The relevant administrative departments of transportation, water conservancy and other local people's governments at or above the county level shall be responsible for the supervision and management of the quality of professional construction projects within their respective administrative areas. Fourth construction, survey, design, construction, project supervision and other units should establish and improve the responsibility system for the quality of construction projects, and be responsible for the quality of construction projects according to law.
Encourage the use of advanced science and technology, construction methods and management methods, and implement the quality system certification system to ensure the quality of construction projects.
Strengthen the on-the-job training of construction engineering practitioners, strictly implement technical standards and operating procedures, and improve the awareness of quality responsibility. Chapter II Quality Responsibility and Obligation of the Construction Unit Article 5 The construction unit shall not dismember the construction project and contract it out in the following ways:
(a) the construction project that should be completed by a contractor is divided into several parts and contracted out to different contractors;
(two) the survey or design of a single project is divided into several parts for contracting;
(three) the professional project does not meet the needs of the project and is contracted separately. Article 6 The construction unit shall not require the contractor to contract the contract in advance. The construction unit shall provide the contractor with the guarantee for timely payment of the project funds.
The construction unit may require the contractor to provide the project quality guarantee. Article 7 The construction unit shall, according to the management authority of the construction project, submit the construction drawing and design documents to the construction administrative department of the local people's government at or above the county level or the relevant administrative departments of transportation and water conservancy for examination and approval. Article 8 When the construction unit submits the construction drawing design documents for review, it shall submit the following materials:
(a) the project approval document;
(2) Copies of engineering survey documents and survey and design contracts;
(three) preliminary design approval documents and main preliminary design documents;
(4) Construction drawing design documents;
(5) structural calculation;
(6) Other documents as prescribed by laws and regulations.
The construction administrative department of the local people's government at or above the county level or the relevant administrative departments of transportation and water conservancy shall make a review conclusion within 30 days from the date of receiving the materials or within the time limit prescribed by laws and regulations; Qualified, issued by the construction drawing design documents review approval; Unqualified, notify the construction unit in writing.
The construction drawing design documents of the basic part of a large-scale or technically complex construction project may be reviewed first, and the review period may be appropriately extended. Ninth due to special circumstances, it is really necessary to modify the approved construction drawing design documents, which shall be modified by the original design unit. If the revision involves public interests, public safety, structural safety, mandatory standards for engineering construction and the improvement or reduction of decoration standards, it shall be reported to the original examination and approval department for approval. Article 10 The construction unit shall, before obtaining the construction permit or commencement report, go through the procedures for quality supervision of the construction project with the construction administrative department of the local people's government at or above the county level or the relevant administrative departments of transportation and water conservancy, and provide relevant information in accordance with the regulations.
The construction administrative department of the local people's government at or above the county level or the relevant administrative departments of transportation and water conservancy shall issue a notice of construction project quality supervision within 15 days from the date of receiving the materials. Eleventh construction projects need to add external objects and structures in the construction process, the construction unit shall entrust the original design unit for unified design.
Housing construction users are not allowed to change the load-bearing structure, original design elevation, color and appearance format without authorization during the decoration process. Twelfth construction project supervision, the construction unit shall entrust a project supervision unit with the corresponding qualification grade for supervision. The following construction projects shall be supervised:
(a) national and provincial key construction projects;
(two) large and medium-sized infrastructure and public construction projects;
(three) residential areas and residential construction projects with a construction area of more than 5,000 square meters;
(4) Projects constructed with loans or aid funds from foreign governments or international organizations;
(five) other construction projects that should be supervised by the state. Chapter III Quality Responsibilities and Obligations of Survey and Design Units Article 13 Survey and design units must conduct survey and design in accordance with the project approval documents, mandatory standards for urban planning and engineering construction, depth requirements for survey and design of construction projects and contractual agreements.
The survey and design of professional construction projects shall be carried out in accordance with the requirements of professional planning. Fourteenth design units shall carry out the design of construction projects according to the documents of survey results.
The documents of construction engineering survey results shall meet the requirements of the depth of design documents stipulated by the state. The depth of construction drawing design documents of construction projects shall meet the construction needs stipulated by the state.