Management analysis of electromechanical installation site?

In construction engineering, the installation of construction machinery and electricity is a very important part. It not only affects the development of social economy, but also directly affects people's quality of life. Therefore, the electromechanical installation project is very important to improve the efficiency, comfort and safety of the building. This paper mainly introduces some relevant effective measures for site management of electromechanical installation.

Paying attention to the construction management of building electromechanical installation engineering is the key to improve the quality of contemporary building engineering. Therefore, its construction management quality is of great significance in the construction electromechanical installation project. In the construction of building electromechanical engineering, it involves a wide range of specialties, and the technology develops rapidly, which is extremely difficult to master. Therefore, in the process of working practice, we must constantly learn, increase our mastery of basic electromechanical technology and knowledge, and do a good job in management and quality control more effectively. At the same time, we should gradually improve the management level of mechanical and electrical installation in construction projects, so as to make our mechanical and electrical construction quality by going up one flight of stairs.

Main factors affecting the construction management of building electromechanical installation engineering

The management level is backward and the engineering design is unscientific.

First of all, most modern workers who manage enterprise contracts lack ideological understanding and deep understanding of related majors, which directly leads to unreasonable and lax contract results and project management. The final result not only affects the reputation of the enterprise, but also affects the economy and interests of the enterprise. Secondly, in today's information age, the management concepts of many enterprises can't keep up with the pace of informatization, and they are still traditional, which directly leads to a single management information channel for obtaining project cost, untimely information processing or unreasonable classification, and can't directly express market demand.

The cost management is chaotic and the installation is not standardized.

The cost of this project greatly exceeds the original project budget. In addition, there are some enterprises that intend to expand the evaluation means of fixed quantities in the final accounts of engineering projects in order to improve the package price of sub-projects In the past two years, many enterprises have seriously violated the basic requirements of relevant design codes in the construction process.

The design is not standardized and lacks coordination.

At present, many construction drawings are simply marked with lightning protection maps, but there is no relevant detailed explanation and marking in important construction drawings.

Effective measures to strengthen on-site management of electromechanical installation

Drawing design management

In the process of building construction, drawings are also the most important guidance and reference. We must strictly organize and manage the design of drawings, because builders should carry out construction according to the contents of drawings. In drawing design, it is necessary to ensure that in addition, the designers who build high-rise buildings must have valid drawings, and the design drawings must obtain the qualification certificates of relevant units and be carried out within the effective scope allowed by the certificates, so as to ensure that the construction design drawings are valid and legal, and only after the construction is completed can they be used as valid vouchers for settlement.

quality management

(1) Before construction, we should grasp the design quality of drawings; (2) In the electromechanical installation of buildings, the quality of equipment used in electromechanical installation is the most critical factor that directly affects its quality; (3) In the construction project, its quality control is also an important aspect that affects quality management; (4) In the later stage of engineering debugging, the system and equipment must be debugged in strict accordance with the specified requirements.

Engineering organization and management

In the process of building construction, in order to ensure the quality and quantity of the project can be completed within the specified time, it is necessary to carry out reasonable and scientific organization and management, so the organization and management of electromechanical installation project is also very important.

Progress management of electromechanical installation construction

In the construction of industrial electromechanical installation, the process can be roughly divided into three stages: pre-embedding, installation and debugging, which are presented in the installation stage at the peak of construction. After the start of the project construction, the staff can make and control the progress plan reasonably according to the overall plan progress of the project. We can refine and decompose the control objectives and implement them to each operation team in different construction stages to form a good project progress management system. At the same time, according to the needs of different stages of the actual industrial electromechanical installation project, the operation and construction arrangements should be reasonably revised, and the construction personnel, equipment, machinery and expenses should be allocated to each link to ensure that the project objectives and progress in each stage can be reasonably realized.

And the safety performance of the control is improved.

In order to ensure the construction period, the project can adopt the construction method of "interchange of different types of work, two shifts or overtime work", and reserve some electromechanical system pipelines to maintain the normal operation and partial replacement function of the project. If the safety measures are not in place, "large area water leakage, electric shock, fire, etc." accident. Can happen, so the project department should be equipped with enough personnel and disaster prevention equipment, irregularly check the inside of the construction scope, and find and eradicate some in time. For the lighting power system and the original pipeline system to be dismantled or replaced, technicians should personally go to the site to operate and confirm, and hang up the obvious sign of "Do not touch" before arranging the construction personnel to carry out the construction. This part is also the focus of safety inspection.

In short, with the continuous progress and development of modern society, people's requirements for living standards are getting higher and higher, and the construction level of buildings is developing faster and faster. Therefore, people's requirements for building electromechanical installation engineering are getting higher and higher. Therefore, in the process of building mechanical and electrical installation, the personnel in relevant positions must be familiar with the specifications and strictly control the quality.