At present, to build their own houses in rural areas of China, an application must be submitted to the local government authorities, and they can only build their own houses after being approved by the relevant departments. So what costs will be incurred in these processes? Cost List: Production cost (generally within 5 yuan), examination and approval fee, registration fee and surveying and mapping fee vary from place to place. You can consult the local authorities.
Second, the cost of homestead.
Friends who have suitable homestead in rural areas can build houses directly, while friends who have no homestead or whose homestead area is not suitable can choose their own homestead through homestead application or homestead transfer.
First of all, according to the land management law, the application condition of rural homestead must first be the villagers in the village. If your household registration is in the village, it meets this condition. So there won't be too much cost in this respect. Secondly, the transfer of homestead needs to be negotiated with villagers, and there will be a certain negotiation cost at this time.
Third, the cost of drawing design.
Some people ask local bricklayers to draw a sketch and start work, but they may not pass when they need government approval, so at present, some people will spend money to buy drawings or ask designers to design a drawing. At this time, some drawing design fees will be generated, and different design fees are different. Such drawings are generally composed of effect drawings, building construction drawings, structural construction drawings, water supply and drainage construction drawings and electrical construction drawings. The construction drawing is very detailed, which can reduce the waste of building materials and save construction costs.
Fourth, building and construction costs.
In the process of construction, various expenses will be incurred. Here, Bian Xiao divides it into three categories: building materials, transportation and labor. In building materials, the cost of blank brick-concrete structure is about 400~ 1000 yuan /m2, and the cost of blank frame structure is 600~ 1600 yuan /m2, so the steel structure is more expensive. Transportation and labor costs depend on the local economic development level.
The cost of building materials takes the construction of a three-story villa with brick-concrete structure as an example;
1. red brick: Generally speaking, for a building area of 300 square meters, the amount of red brick used is about 90,000, which should be 50 cents according to the current normal cost. 90 thousand is 45 thousand!
2. Reinforcement: Generally speaking, the amount of reinforcement for brick masonry is 25 kilograms per square meter, so one * * * is 7.5 tons. At present, reinforcement costs about 4700 yuan, which is about 35000 yuan!
3. Sand and gravel: Generally speaking, the amount of sand and gravel with a building area of 300 cubic meters should be about 200 cubic meters, which is about 30,000 cubic meters according to the current 150 calculation.
4.? Cement: the dosage of cement in one square meter should be about 150kg, totaling about 4.5t At present, the price of cement should be about 290, which is about 14000!
5.? Wires and water pipes: this is generally around 8000.
6.? Real stone paint: At present, the mainstream price is about 0/00 yuan per square meter/kloc, and the facade of our 300-square-meter house is about 450 square meters, which is 45,000 yuan!
7. Roof door and window glass and glazed tile: generally around 35,000.
Total cost: 4.5+3.5+3+1.4+0.8+4.5+3.5 = about 2 1 ten thousand.
Verb (abbreviation of verb) decoration and post-payment
According to the choice of hardcover, paperback and blank, the cost of decoration is different, because the material consumption and labor consumption are also different. Secondly, the purchase cost of furniture and home appliances is also different according to personal choice.
The cost of self-built houses in rural areas probably includes these. I believe that after reading this article today, you should have a simple understanding of building costs. You can choose according to your actual situation, focusing on saving costs and improving work efficiency. Finally, I wish everyone a house that they are satisfied with.