Who has the account number of China Purchasing and Bidding Network, can you help me find a message? The name of the project is "EPC general contracting tender for tunnel project of China-Myanmar natur

Who has the account number of China Purchasing and Bidding Network, can you help me find a message? The name of the project is "EPC general contracting tender for tunnel project of China-Myanmar natural gas pipeline project", thank you. TenderNo。 :69900-ZB-WJ-XEX-(20 1 1)-0 12。

China-Myanmar natural gas pipeline project (domestic section) is an infrastructure project approved for construction, which is managed by China Oil Pipeline Construction Project Management Department. Now, the EPC general contracting tender for the tunnel project of China-Myanmar natural gas pipeline project (domestic section) is organized nationwide.

1. Project overview

1. 1 project name: EPC general contracting of tunnel project of China-Myanmar natural gas pipeline project (domestic section)

1.2 Project Location: Yunnan Province and Guizhou Province.

1.3 source of funds: self-raised funds;

1.4 project scale: China-Myanmar natural gas pipeline project (domestic section) includes 8 1 trunk lines, which are parallel to China-Myanmar crude oil pipeline. The trunk line enters from boundary pillar 58 in Ruili City, Yunnan Province, and is separated from the oil and gas pipeline in Anshun City, Guizhou Province. The natural gas pipeline passes through Guiyang, duyun city, Hechi and Liuzhou, and finally reaches Guigang. The total length of the trunk line is 1726.8km, the pipe diameter is10/6mm, the design pressure is 10MPa, and the whole line adopts X80/X70. Branch lines are Lijiang Branch Line, Yuxi Branch Line, Duyun Branch Line, Hechi Branch Line, Guilin Branch Line, Qinzhou Branch Line, Beihai Branch Line and Fangchenggang Branch Line; The branch line is 855.6 kilometers long.

There are many large rivers crossing and mountain tunnels in this project, and the coordination workload is heavy. The river spans six places. There are 65 mountain tunnel projects in China-Myanmar natural gas pipeline project (domestic section), of which 56 are used by China-Myanmar oil and gas pipeline, of which 10 is laid by natural gas pipeline alone. The total length is about 73. 17km, the longest tunnel is 2908m, the cross section of ordinary tunnel for oil and gas pipeline is 3.8m× 3.8m, and that of single tunnel for natural gas pipeline is 3.0m× 3.0m. ..

1.5 project nature: engineering design, procurement, general construction contract.

2. Bidding scope

Construction drawing design, material procurement and general contracting of China-Myanmar natural gas pipeline project (domestic section) tunnel project.

3. Planned construction period:

Commencement date: 20 1 1 end of May;

Completion date: 2065 438+02 65438+ end of February.

4. Quality requirements:

The project meets the 100% qualification standard.

5. Pre-qualification method:

This prequalification adopts the qualification system.

6. Qualification requirements:

An independent legal person or consortium with Grade A qualification of engineering survey, Grade A qualification of engineering design and Grade A qualification of tunnel engineering or corresponding general contracting qualification.

7. Other requirements:

Since 2007, it must have the EPC general contracting performance of tunnel projects of the same scale and above; Have quality management system certification and HSE management system certification; In good financial condition in the past three years; There have been no lawsuits in the past two years.

8. The tenderer:

China Petroleum Pipeline Construction Project Manager Department

9. Acquisition of prequalification documents

See the Annex of this tender announcement "Pre-qualification Document for EPC General Contracting of Tunnel Project of China-Myanmar Natural Gas Pipeline Project (Domestic Section)".

10. Submission of prequalification application documents

10. 1 deadline for submitting prequalification application documents: 20119: 00 March 14. The pre-qualification application documents are submitted at Room 1804, Marco Polo Building, No.80 Anli Road, Chaoyang District, Beijing.

10.2 The tenderer will not accept the pre-qualification documents that are delivered late or not delivered to the designated place.

10.3 when submitting the prequalification application documents, the applicant shall provide the originals of the supporting documents in the prequalification application documents, including the originals and copies.

1 1. Prequalification

1 1. 1 prequalification time: 2011March 9: 0014;

1 1.2 Pre-qualification location: Kyle Boluo Building, No.80 Anli Road, Chaoyang District, Beijing.

12. Contact information of the tenderer

Contact: Huang Changming

Tel: 848898 12

Chuan Zhen: 0 10-84889868

E-mail: HCM12 15@petrochina.com.cn;

China Petroleum Pipeline Construction Project Manager Department

20 1 1 year March 1 day