opening hours
The south section of the first phase of Kunming Metro 1 Line was put into trial operation on May 20, 20 13 (Xiaodongcun Station-south of University);
The first phase of Kunming Metro 1 and Line 2 was put into trial operation on April 30th, 20 14 (North Bus Station-higher education mega center south).
Open web site
Kunming Metro Line 2: North Bus Station, Longtou Street Station, Sijiaying Station, Yangchangcun Station, Linyuqiao Station, Beichen Station, Jinxing Station, Baiyun Road Station, North Railway Station, Chuanxin Gulou Station, Jiaosanqiao Station, Dongfeng Square Station, Tangzixiang Station and Huancheng South Road Station;
Kunming Metro 1 Line: Huancheng South Road Station, Kunming Railway Station, Fude Station, Rixin Station, Wujiaba Station, Changhong West Road Station, Xiaodongcun Station, Jier Road Station, Yao Xing Road Station, New Asia Sports City Station, South Bus Station, Dounan Station, Chunrong Street Station, Hump Street Station, Lian Jie Station, Yikang South Road Station, University Town Station and Higher Education Park South Station.
(Note: At present, Kunming Metro 1 Line and Line 2 are connected together, so citizens can take Kunming Metro Phase I 1 Line and Line 2 directly from the northern bus station to the south of Higher Education Mega Center without changing. )
Operating torque
The daily operation hours of Metro 1 Line and Line 2 Phase I are 6:20-22:00 (the first and last buses), with 5-minute train interval, 40-second stop at the intermediate station, 60-second stop at the terminal station, 72.5 minutes one way, total turnaround time 155 minutes, and average travel speed of 34./KLOC-0. North Bus Station 06:2022:00- Longtou Street Station 06:2222:0207:3023: 10 Sijiaying Station 06:2422:0407:2823:08 Yangchang Village Station 06: 2622. : 3022:1107: 2223: 02 Jinxing Station 06:3222: 1307:2023:00 Baiyun Road Station 06: 3422:1507:/kloc-0. 907: 1322:53 Jiaosanqiao Station 06: 4022: 2107:122: 51Dongfeng Square Station 06: 4222: 2307:1022:. 6:4822:3007:0222:00 Fude Station 06:5 122:3207:0022:42 Rixin Road Station 06:5222:3406:5822:40 Wujiaba Station 06: 5422: 3606: 5622. Kloc-0/7 Chunrong Street Station 07:1823: 0006: 3222:12 Hump Street Station 07:2023:0206:3022: 10 Lian Jie Station 07: 2223: 0406.
opening hours
The first phase of BRT supporting facilities of Kunming Metro New Airport (Kunming Metro Line 6) was put into operation from 2065438 to June 28th, 2002.
Open web site
At present, the first phase of Kunming Metro Line 6 has opened two stations, East Bus Station and Airport Central Station, for trial operation.
The East Bus Station is located on the south side of the East Bus Station, with two exits, one facing Hongqiao Road and the other facing the waiting hall of the East Bus Station.
The airport central station is located on the second floor of Changshui International Airport, which is connected with the terminal building.
Operating torque
The departure time of the two stations of Kunming Metro Line 6 is the same, with the first bus at 7: 00 and the last bus at 19: 05. Trains leave every 25 minutes, and the whole running time is between 2 1-23 minutes.
07:00 07:25 07:50 08: 15 08:40 09:05 09:30 09:55 10:20 10:45 1 1: 10 1 1:35 1 2:00 12:25 1 2:50 13: 15 13:40 14:05 14:30 14:55 15:20 15:45 1 6: 10 16:35 17:00 17:25 65 438+07:50 18: 15 18:40 19:05
Suspend trial operation
Kunming Metro Operation Company announced that the first phase of Metro Line 6 will be suspended from the eastern passenger station to the terminal station on March 5. Kunming Metro 1 Line is a backbone line running through the north and south of the old and new urban areas of Kunming, with a total length of about 4 1.4 km.
Website trend
Main line: Provincial School of Political Science and Law Station-Polytechnic University Station-West Railway Station Overpass Station-Panjiawan Station-Mile Temple Station-Jinbi Square Station-Desheng Bridge Station-Huancheng South Road Station-Kunming Station-Fude Station-Rixin Road Station-Wujiaba Station-Changhong West Road Station-Xiaodong Village Station-Jill Road Station.
Branch line: Chunrong Street Station-Administration Center Station-Jingming North Road Station-Bailongtan Park Station-Kunming South Station.
Transfer station
University of Technology Line 4
Panjiawan Station on Line 3
Mile Temple Station on Line 5
Deshengqiao Station Line 2 and Line 6
Line 2 Huancheng South Road Station
Kunming Railway Station Line 2
Changhong West Road Station on Line 8
Yao Xing Road Station of Line 4
Dounan Station on Line 4
Chunrong Street Station 1 Line Branch
Kunming South Station on Line 4
Line 4 Liandajie Station
job schedule
On June 65438+February 65438+February 09, 2008, the trial section of Kunming Metro 1 Line (Jier Road Station-Nanbu Bus Station) was opened, marking the beginning of Kunming Metro construction.
On March 6, 2009, the trial section of Kunming Metro 1 Line was officially started after the green belt was demolished.
On September 8, 2009, Chunrong Street Station and University South Station of Kunming Metro 1 Line were opened.
From June 5438 to February 2009, the branch line route of Kunming Metro 1 Line was determined, and Chunrong Street Station began to be rebuilt.
On June 5438+February 2, 20091,construction started at Hump Street Station, Yikang South Road Station, University Town Station and Dounan Station-Chunrong Street Station.
20 10 On April 30th, Kunming Metro 1 Line Huancheng South Road Station-Jier Road Station and Da Lian Street Station officially started.
On June 3rd, 20 10, the shield machines "Chuncheng No.1" and "Chuncheng No.5" rolled off the production line, marking the start of the construction of Kunming subway tunnel.
20 1 0 June 19, Kunming Metro1Line was capped in the south of the University (the first capped station of Kunming Metro).
20 10 On July 28th, 1 Line University Town South-Jincheng South Station and Kunming Rail Transit Industrial Park started construction, which meant that the design of Kunming Metro 1 Line was changed again, and the line was increased to 55km.
20 10, 10 Kunming Metro 1 Line Chunrong Street Station-Hump Street Station right tunnel runs through (the first tunnel of Kunming Metro).
20 1 0165438+1October 7 -27, Kunming Metro Phase II1Line (Jinbi Square Station-Deshengqiao Station) carried out geological survey.
20 1101Kunming Metro1Line Chunrong Street Station-Hump Street Station runs through. (The first through double-track tunnel of Kunming Metro)
20 1 1 On 27th, the track-laying project of Kunming Metro 1 Line started at Yao Xing Road Station.
20 1 1 year 65438+February 3 1 day, the tunnels and viaducts in the south section of Kunming Metro 1 line (Xiaodongcun Station-higher education mega center south) run through the whole line.
On June 12, 20 1 1, the southern section of Kunming Metro 1 line began to transmit electricity.
On June 26th, 20 12, the cold sliding test was started in the south section of Kunming Metro 1 Line.
On August 7th, 20 12, the southern section of the subway 1 line was completed.
20 1 2165438+1On October 5th, the trial operation of the southern section of Kunming Metro1Line began.
20 13 On May 20th, the southern section of Kunming Metro 1 Line (Xiaodongcun Station-south of the University) started passenger operation. With an interval of 8 minutes and a running time of 34 minutes, this is the first plateau full-featured subway in China.
20 13 12 3 1, the train thermal sliding test was carried out from Yan Jiashan Depot to Xiaodongcun Station in the northern section of the first phase of Kunming Metro.
On April 30th, 20 14, the northern section of the subway 1 line was put into trial operation.
Railway route planning
Main roads: Jianshe Road, Xichang Road, Jinbi Road, Beijing Road, Cheng Chun Road, Changhong Road, Cai Yun Road and Wang Liang Road.
Administrative divisions: Wuhua District, Xishan District, Guandu District and Chenggong District.
Functional areas: main city, Wujiaba Central Business District, Century City Residential District, Chenggong Central Business District and Chenggong University Town.
Warehouse setting
Kunming Metro 1 Line Daliyuan Parking Lot is located in the south of University Town-Yuanbao Village Station, and Wulacun Depot (comprehensive base) is located in South Bus Station-Dounan Station. Kunming Metro Line 2 is a subway line running through the north and south of the main city of Kunming, with a total length of 22.8 kilometers.
Website trend
North Bus Station-Longtoujie Station-Sijiaying Station-Yangchangcun Station-Linyuqiao Station-Beichen Station-Jinxing Station-Baiyun Road Station-North Railway Station-Chuanxin Gulou Station-Jiaosanqiao Station-Dongfeng Square Station-Tangzixiang Station-Huancheng South Road Station-Kunming Railway Station-Nanba Road Station
Transfer station
Linyuqiao Station on Line 8
North Railway Station Line 4 and Line 5
Dongfeng Square Station on Line 3
Tangzixiang Station 1 Line and Line 6
Huancheng South Road Station 1 Line
Kunming Railway Station Line 1
Guangfu Road Station on Line 7
Suwangcun Station on Line 5
job schedule
From August 0 1 day to August 0 10, 2009, a geological survey was conducted at Kunming Railway Station, North Bus Station of Kunming Metro Line 2.
On April 30th, 2065438+00, the first phase of Kunming Metro Line 2 (North Bus Station-Kunming Railway Station) was started in an all-round way, and traffic control began on Beijing Road.
On 20th11Feb14th, the first shield machine of Kunming Metro Line 2 was launched at Yangchangcun Station.
2065438+May 0 1 2003, the third bridge station, Dongfeng Square Station, was opened, marking the opening of the first phase of Kunming Metro.
On April 30th, 20 14, the first phase of Kunming Metro Line 2 was put into trial operation.
Railway route planning
Main roads: Fengyuan Road, Beijing Road and Guannan Avenue.
Administrative divisions: Panlong District and Guandu District.
Functional areas: northern urban area, main urban area, southern urban area and Dianchi Peninsula area.
Warehouse setting
Suwangcun Parking Lot of Kunming Metro Line 2 is located at the southern end of Suwangcun Station (Fu Bao), and yan village Depot is located at the east side of Kunming North Station. Kunming Metro Line 3 is the backbone line connecting the east and west of the main city of Kunming, with a total length of about 23.6 kilometers.
Website trend
Xishan Forest Park Station-Chejiabi Station-Puping Village Station-Shizui Station-Dayu Road Station-Western Bus Station-Minshan Station-Changyuan Middle Road Station-Xiyuan Station-Liangjiahe Station-City Gymnasium Station-Panjiawan Station-Wuyi Road Station-Dongfeng Square Station-Tuodong Gymnasium Station)
Transfer station
Line 7 Changyuan Middle Road Station
Panjiawan Station 1 Line
Wuyi Road Station on Line 5
Dongfeng Square Station on Line 3
Dashuying Station on Line 4
Taiping Village Station on Line 5
Line 6 East Bus Station
job schedule
65438+February 09, 2009 ——20 100065438+20091October 30, 2009, geological exploration was carried out on the entire line of Kunming Metro Line 3.
20 10 On April 30th, Kunming Metro Line 3 and Kunming Metro Line 2 started construction at the same time.
On August 9th, at 20 10, construction started at Minshan Station and Changyuan Middle Road Station of Kunming Metro Line 3.
On 20th101June15th, the construction of Xiyuan overpass station of Kunming Metro Line 3 was closed.
2011065438+1On October 27th, the construction of Changyuan Middle Road Station of Kunming Metro Line 3 was changed from semi-closed to fully closed.
2011From February 6 to February 20, the second geological survey was conducted in the urban section of Kunming Metro Line 3 (Xiyuan overpass station-Dongfeng Square station).
On June 24th, 20 1 1, the section from Taiping Village Station to Hongqiao Overpass Station of Kunming Metro Line 3 was started.
20 11July 01day, Majie Station, Shizui Station and Xiaoyucun Station of Kunming Metro Line 3 started construction.
On 20th11July15th, the construction of Tuodong Gymnasium Station of Kunming Metro Line 3 started.
Pedestrian zone
Main roads: Chunyu Road, Renmin West Road, Dongfeng West Road, Nanping Street, Dongfeng East Road, Renmin East Road and Hongqiao Road.
Administrative divisions: Xishan District, Wuhua District, Panlong District and Guandu District.
Functional areas: Xicheng, main city and Dongcheng.
Warehouse setting
Chejiabi Parking Lot of Line 3 is located at the southern end of Chejiabi Station, and Fangmaqiao Vehicle Section is located on the east side of East Passenger Station and shared with Line 6. Kunming Metro Line 4 is a connecting line connecting all industrial parks in Kunming, with a total length of 43.5 kilometers and 26 stations.
Website trend
Daphuket Station-Chen Jiaying Station-Datangzi Station-Xiaotun Station-Polytechnic University Station-Lianhuachi Station-Xiaochaiyuan Station-North Railway Station-Bailong Road Station-Donghua Station-Dashuying Station-Chrysanthemum Station-Chrysanthemum East Station-Kunming East Station-niujie Zhuang Station-Xiaoxicun Station
Transfer station
Datangzi Station on Line 7
Gongda station line 1
Kunming North Station on Line 2 and Line 5
Dashuying Station on Line 3
Juhua Comprehensive Hub Station on Line 6 and Line 8
Line 7 yangfu Station
Dounan station line 1
Liandajie Station 1 Line
Kunming South Railway Station Line 1 Branch Line
Pedestrian zone
Main roads: High-tech Zone Middle Road, Haitun Road, Xuefu Road, Guikun Road, Xingcheng Road, Gudian Road and Da Lian Road.
Administrative divisions: Wuhua District, Panlong District, Guandu District and Chenggong District.
Functional areas: High-tech Zone, Main City, Economic Development Zone, Chenggong Industrial Park and Chenggong New City.
Warehouse setting
The Dayangtian parking lot of Kunming Metro Line 4 is located in the north of Daphuket Station, the Bailongtan parking lot is located in the east of Kunming South Station (Bailongtan), and the Happy Valley Depot (comprehensive base) is located between Xiaoxicun Station and Happy Valley Station.
job schedule
20 15, the construction of Line 4 is planned. Kunming Metro Line 5 is a subway line connecting major tourist attractions in Kunming, with a total length of 24.0 kilometers.
Website trend
Expo Park Station-Bailong Temple Station-Shizha Station-North Railway Station-Zoo Station-Cuihu Station-Wuyi Road Station-Mile Temple Station-Wuhua Gymnasium Station-Youth Palace Station-Zhenghe Community Station-Daba Station-Hewei Village Station-Dianchi Tourism Resort Station-Yongfu Station-Shuangcun
Transfer station
Expo Park Station on Line 8
Bailongsi Line 4
North Railway Station Line 2 and Line 4
Wuyi Road Station on Line 3
Mile Temple Station Line 1
Line 7 Zhenghe community station
Suwangcun Station on Line 2
Pedestrian zone
Main roads: Bailong Road, Huashan West Road, Wuyi Road, Dianchi Road, Hongta East Road and Huanhu East Road.
Administrative divisions: Panlong District, Wuhua District, Xishan District and Guandu District.
The main city, Dianchi tourist resort.
Warehouse setting
Yunzhixiang Depot of Line 5 is located on the south side of Yuntianhua Station.
job schedule
20 15, the construction of Line 5 is planned. Kunming Metro Line 6 is a subway line connecting the main city and Kunming New Airport, with a total length of 26.6 kilometers.
Website trend
Tangzixiang Station-Tuodong Gymnasium Station-Juhua Comprehensive Hub Station-Juhua Station-East Bus Station-Dabanqiao Station-Airport Front Station-Airport Central Station-Airport North Station
Transfer station
Tangzixiang Station 1 Line and Line 2
Juhua Station of Line 4
Line 3 East Bus Station
job schedule
20 10 3 18, the construction of Kunming Metro Line 6 comprehensive transportation hub station-Airport South Station started.
On 20 1 0 August 01day, the construction of the comprehensive transportation hub station of the eastern passenger station of Kunming Metro Line 6 started.
20111kloc-0/On October 28th, the first train of Kunming Metro Line 6 rolled off at Zhuzhou South Locomotive.
2011165438+1On October 22nd, the first train of Kunming Metro Line 6 arrived at Dabanqiao Depot.
20111On February 27th, the train of Kunming Metro Line 6 successfully carried out the cold sliding test.
20111On February 30th, the train of Kunming Metro Line 6 successfully carried out the thermal sliding test.
On February 8, 20 12, trial operation of Kunming Metro Line 6 began.
20 12 On June 28th, Kunming Metro Line 6 and Changshui International Airport were opened simultaneously. The operation time is from 7: 00 to 19: 05 every day, and the departure interval is 25 minutes.
2065438+July, 2004 1 day, the second phase of Metro Line 6 started construction.
2065438+From July to September, 2004, the green belts on the north and south sides of Tuodong Road were relocated and the footbridge was demolished.
From June, 20 14 to February, 20 15, the south enclosure and temporary pavement of the construction station were covered, and the traffic on Tuodong Road was changed to traffic on both sides of the road.
From March to April, 2065438+2005, the east and west sides of Tangzixiang interchange station on Line 6 still need partial enclosure. In order to reduce the impact on Beijing Road traffic, temporary cover plates will be set on the east and west sides of interchange nodes, so as to ease Beijing Road traffic from the east side to the west side first and ensure the traffic width of 28 meters.
From May 20 15 to June 20 1 16, the traffic diversion mode moved south to Tuodong Road, with a traffic width of 23 meters.
After the second phase of the project is completed, a new city terminal will be built near Tangzixiang Station, the starting station. The new city terminal will be connected with the departure station of Line 6 Phase II, and passengers can handle aviation services such as baggage consignment and boarding pass printing in the city.
Pedestrian zone
Main roads: Hongqiao Road and New Airport Expressway.
Administrative Division: Guandu District
Functional areas: main urban area and airport economic zone.
Warehouse setting
Fangmaqiao parking lot is located on the east side of East Passenger Station and shared with Line 3. Xiaoshao Depot is located between Dabanqiao Station and Comprehensive Transportation Hub Station. Kunming Metro Line 7 is a connecting line connecting the northwest and southeast of Kunming, which is in the initial planning stage. The stations and lines are for reference only.
Website trend
Phuket Transfer Station-Northwest Passenger Station-Datangzi Station-Heilinpu Station-Changyuan Middle Road Station-Shagouwei Station (Changyuan Middle Road)-Nanya Station-Tianjiadi Station-Qianxing Road Station-Dashanghui Station-Guannan Guangfu Station-Changhong Guangfu Station-Century City West Station-Guandu Ancient Town Station
Transfer station
Datangzi Station on Line 4
Changyuan Middle Road Station on Line 3
Nanya Station of Line 5
Guannan Guangfu Station of Line 2
Changhong Guangfu Station on Line 8
New Asia Sports City Station Line 1
Guangwei Station of Line 4
Guo Lin Reservoir Station on Line 9
Pedestrian zone
Main roads: Phuket Road, Changyuan Middle Road, West Third Ring Road, Caohai Tunnel, Rixin Road, Qianxing Road, Guangfu Road and Anshi Highway.
Administrative regions: Wuhua District, Xishan District, Guandu District, Chenggong District and Yangzonghai Scenic Area.
Functional areas: High-tech Zone, Dianchi Resort, Century City Residential Area, Chenggong Industrial Park and Qidian Industrial Park. Kunming Metro Line 8 is a connecting line connecting the northeast and southeast of the urban area. In the preliminary planning stage, the station and route are for reference only.
Website trend
Longquan Road Station (Shabaying)-Xiaokang Avenue Station-Linyuqiao Station-Kunqu Expressway Station-Chuanjin Road Station-Expo Park Station-Bailongsi Station-Southwest Linda Station-Jinsha Community Station-Taiping Village Station-Chrysanthemum Overpass Station-East Railway Station-Guanguan Forest Park Station-Changhong West Road Station-
Transfer station
Line 2 Linyuqiao Station
Songming Second Line of Kunqu Expressway Station
Bailong Temple Station on Line 5
Taiping Village Station on Line 3
Juhua East Station on Line 4 and Line 6
Line 4 East Railway Station
Close the East-West Express Line and the North-South Express Line of Forest Park Station.
Olympic Sports Center Station 1 Line
Changhong Guangfu Station on Line 7
Pedestrian zone
Main roads: Lin Yu Road, Platinum Avenue, Yuanbo Road, Bailong Road, Changhong Road and Huanhu East Road.
Administrative divisions: Wuhua District, Panlong District and Guandu District.
Functional area: Kunming Metro Line 9 in the northern urban area, the eastern urban area and the Dianchi Peninsula area is a subway line connecting the new urban areas in Kunming, and the middle section is expected to start construction first.
Website trend
Dabanqiao North Station-Dabanqiao Station-Guo Lin Reservoir Station-Kunming South Station (Bailongtan)-Jingming South Road Station-xia zhuang Station (Yunnan University)-Chenggong University Town Station (Radio and TV University)-Yuanbao Village Station-Radio and Television Media Station-Ma Jinpu Station-Gong Yuan North Road Station-Gong Yuan South Road Station-Baiyun Village Station
Transfer station
Dabanqiao Station of Line 6
Guo Lin Reservoir Station on Line 7
Kunming South Station (Bailongtan) Line 65438+Line 0 and Line 4
Xiazhuangcun Station 1 Line
Chenggong University Town Station (TV University) Line 1
Color development method
20 10 On July 28th, Kunming South Locomotive Rail Transit Industrial Park and Kunming Metro Line 9 started construction.
Pedestrian zone
Main roads: Chenghuang Expressway in Jincheng District, Liangwangshan Road, Da Lian Road, Jingming North Road, Ma Jinpu Middle Road and Nanbei Avenue.
Administrative divisions: Airport Economic Zone, Chenggong District and Jinning County.
Functional zones: Airport Economic Zone, Chenggong New District, Ma Jinpu High-tech Zone and Jincheng New District.
Warehouse setting
Industrial Park Depot is located in Jincheng North Station-Industrial Park Station.