Traffic Adjustment during the Construction of zhu cun Station of the North Extension Line of Metro Line 4
Road closure:
1. time
From July 28th, 2008 to October 24th, 20081* *180 days.
2. Roads
Closure construction of Yuzhu Street in Longhua District.
Bypass route
Vehicles passing through this section in the past can pass along Guanlan Avenue or other surrounding roads.
Traffic Adjustment during the Construction of Shuangyong Street Station of Metro 10 Line
1. Road closure:
1. time
From July 28th, 2008 to October 24th, 20081* *180 days.
2. Roads
Close Shuangyong Street (from Pinghu Street intersection to Yu He South Street intersection), Shuangyong Street (from Yu He South Street intersection to Xinli Street intersection), Shuangyong Street (from Xinli Street intersection to Jingxin North Street intersection) and Shuangyong Street (from Jingxin North Street intersection to Fenghuang Avenue intersection) for construction.
Bypass route
Vehicles passing through the above sections should be diverted to Ping Long Road, Shouzhen Street or other surrounding roads.
Second, the road changes direction:
1. time
From July 28th, 2008 to October 24th, 20081* *180 days.
2. Roads
The section from the intersection of Xinli Street (Liyuan Street) to Xinyuan Road in Longgang District was adjusted from two-way traffic from north to south to one-way traffic from south to north.
Traffic Adjustment during the Construction of Subway 12 Line and Heping Station
I. Road closure 1;
1. time
From July 28th, 2008 to September 26th, 2008 ***60 days.
2. Roads
Songfu Avenue (Chongqing intersection to bridge and intersection) will be closed for construction.
Bypass route
Vehicles that used to pass this section can be changed to pass along Fuyuan No.1 Road, Yonghe Road or other surrounding roads.
Second, closed roads 2:
1. time
From July 28th, 2008 to September 26th, 2008 ***60 days.
2. Road closure
Close bridges and roads (Fuyuan No.1 intersection to Yonghe intersection) for construction.
Bypass route
Vehicles passing through this section can be diverted to Chongqing Road, Hexiu West Road or other surrounding roads.
Traffic Adjustment during the Construction of Xin 'an Park Station of Metro 12 Line
Road closure:
1. time
From July 28th, 2008 to October 6th, 2008/kloc-0 *** 180 days.
2. Roads
The closed construction of Baonong Lane 1 (Qianjin Lane 1 to Longjiang Lane 2).
Bypass route
Vehicles that used to pass this section can be changed to pass along Xin 'an Second Road, Shenzhen East Road or other surrounding roads.
Traffic Adjustment during the Construction of Baoshilu Station of Metro 13 Line
Road closure:
1. time
July 3 1 to June165438+1October 28 *** 120 days.
2. Roads
Ruyi Road (from the intersection of Baoshi East Road to He Bin North Road) is closed for construction.
Bypass route
Vehicles passing through this section in the past can be changed to pass along Shiyan Avenue, Baoshi South Road or other surrounding roads.
Traffic Adjustment during the Construction of Song Yuan Station of Metro Line 4
1. Road closure:
1. time
From July 18 to October 14 *** 180 days.
2. Roads
Close the Guixin intersection of Guanlan Avenue for construction.
Bypass route
Vehicles passing through this section can be diverted along Lanhua Road, Yanhe East Road, Gui Lan Road, Gui Lan Middle Road or other surrounding roads.
Second, the road changes direction:
The section of Yanhe East Road (Guanlan Avenue to Lanhua) in Longhua District has been adjusted from two-way traffic from north to south to one-way traffic from north to south.
Traffic Adjustment during the Blasting Construction of Lianhua Village Station of Metro 10 Line
Road closure:
1. time
July 12 to 10.8, * *180 days, morning 10: 30 to afternoon 12: 30, afternoon 14: 00 to afternoon/kloc.
2. Roads
At that time, the intersection of Caitian Road and Lihong Road will be temporarily closed 1 minute for blasting construction, and vehicles and pedestrians are prohibited from entering the blasting construction area. Drivers and pedestrians are requested to observe traffic signs and markings and obey the command of the traffic police when passing through the above-mentioned sections within the above-mentioned time.
Adjustment during construction of Shigu Station of Metro 13 Line
Road closure:
1. time
July 1 1 to September 19 * * 70 days.
2. Roads
Dashi No.2 Road (Xiancha Road to Xiangu Road) is closed for construction.
Bypass route
Vehicles passing through this section in the past can be changed to pass along Dashiyi Road or other surrounding roads.
Traffic Adjustment during the Construction of Longcheng West Station of Metro 16 Line
I. Road closure 1;
1. time
From July 1 1 to1October 14 * * 95 days.
2. Roads
The section of Gexi No.3 Road (Huangge intersection to Weisan street intersection in Sha Tin) is closed for construction.
Bypass route
Vehicles that used to pass through this section can be changed to pass along Gexi No.2 Road or other surrounding roads.
Second, closed roads 2:
1. time
From July 1 1 to1October 14 * * 95 days.
2. Road closure
The first section of Wai Street (Ruyi Road to Gexi Road) in Sha Tin is closed.
Bypass route
Traffic can be diverted to Second Street in Sha Tin Wai or other peripheral roads.
Traffic Adjustment during the Construction of Shuanglong Station of Metro 16 Line
Road closure:
1. time
From July 5 to June 2008, 65438+ 10/* * *180 days.
2. Roads
Fu Jia Street (Changsheng Street to Xinglong Street) is closed for construction.
Bypass route
Vehicles passing through this section in the past can be diverted to Jincheng Street, Jinlong Street or other surrounding roads.
Traffic Adjustment during the Construction of Gangxia North Comprehensive Transportation Hub Project of Subway
Road closure:
1. time
July 20, 2008 to 20081October 9 *** 173 days.
2. Roads
The underground passage on the west side of Shennan Huanggang Interchange was closed for construction.
Bypass route
Vehicles that originally left Fuke No.1 Road for Shennan Avenue eastbound or Huanggang Road southbound via this closed section can leave Shennan Avenue westbound via the internal road on the east side of Shenzhen International Innovation Center, and then turn around and turn into Shennan Avenue eastbound or Huanggang Road southbound.
Traffic Adjustment during the Construction of Kexing Station of Metro 13 Line
I. Road closure 1;
1. time
June 2 1, to June 65438+February18 * *180 days.
2. Roads
Ke Hua Road (Keyuan Road to Kewei Road) is closed for construction.
Bypass route
Vehicles passing through this section can be diverted along Wenhua Road, Kefeng Road or other surrounding roads.
Second, the road is changed to 1:
1. time
June 2 1, to June 65438+February18 * *180 days.
2. Roads
The two-way traffic of Wenhua route is adjusted to one-way traffic from west to east.
Second, the road changes direction 2:
1. time
June 2 1, to June 65438+February18 * *180 days.
2. Roads
The two-way traffic of Kefeng route is adjusted to east to Xidan.
Adjustment of Four Bus Lines in Longhua District
In order to further improve the bus service level in Longhua District, Shenzhen Public Transport Administration has adjusted four bus lines in Longhua District.
Adjustment time: from August 2008 1.
E 1 1 line
E 1 1 line, add Yixiu New Village 1 pair of bus stops in both directions.
No.37 express bus
The bidirectional operation of bus line 37 of the high-speed bus from Li Guang Industrial Zone Station to Minle Subway Station North Bus Station was adjusted to one-way operation from Li Guang Industrial Zone Station to Huangting Guangchang Station.
The road leading to Huang Ting Square was changed from sightseeing road and Meiguan Expressway to sightseeing road, Meiguan Expressway, Huanggang Road, Li Hong Road, Caitian Road, Hua Fu Road, Wuzhong Xin Road, Hua Fu No.3 Road, Zhongxin No.4 Road and Hua Fu Road.
Cancel four unilateral bus stops such as "Liguangshekang Center, Jiekun Industrial Zone, Dafu Industrial Zone Intersection and Yijia Industrial Zone", and add seven unilateral bus stops such as "Minle Subway Station ③, Meilong Tianqiao, Great Wall Development, Lianhua Second Village ②, Armed Police Detachment, Fortune Building and Gangxia Subway Station".
When the service time is adjusted to 06:25-07:50.
B92 1 line
B92 1 Line increases in both directions 1 Opposite stops.
B769 line
The B769 line from Longhua Station in Silicon Valley to IKEA Industrial Park Station was adjusted to Fuan Yayuan Station to Hengkengwei Bus Station.
The service roads are adjusted from Yijia Road, Fu Rong Road, Hua Fu Road, Fu Qian Road, Nuclear Power Road, Yuexing Road, Guanlan Renmin Road, Guanlan Avenue and Dahe Road to Fu Qian Road, Yijia Road, Fu Rong Road, Hua Fu Road, Fu Qian Road, Nuclear Power Road, Yuexing Road, Guanlan Renmin Road, Dahe Road, Guanlan Renmin Road, Ping 'an Road and Feng Jia Road.
The two sides cancelled four pairs of bus stops such as Longhua Market Supervision Bureau, Guanlan Guohong Shopping Mall, Dahe Road and Fuji Xerox, and added six pairs of bus stops such as Fenglu, Hexi, Guancheng, Nanyue Pharmaceutical, Xintang Village and Yijia Industrial Park Pier.
Increase the one-way bus stop from Guanhu Taxation Office to Fuan Yayuan Bus Terminal 1, cancel the one-way bus stop from koi fish Farmers' Market to Hengkengwei Bus Terminal 1, and increase the one-way bus stop from koi fish 1.
The service time of Hengkengwei Bus Terminal was adjusted from 07:00-20:40 to 06: 10-20:00, and that of Fu 'an Yayuan Bus Terminal was adjusted from 06:20-20:00 to 07:00-20:50.
The 16 bus line changed after the relocation of the Shenzhen Universiade subway station.
Affected by the construction of the Universiade subway hub station, the original Universiade subway connection station needs to be relocated. Recently, the bus line 16 passing through the Universiade subway station has been adjusted:
M3 14 line:
One terminal station was changed from the Universiade subway connection station to the first and last bus stations of Hongmian Road.
Some roads in the direction of Hongmian Road Passenger Station were adjusted from Longgang Avenue and Longfei Avenue to Longgang Avenue, Longfei Avenue, Longxiang Avenue, Ainan Road and Longge Road, while some roads in the direction of Shatoujiao Passenger Station were adjusted from Longfei Avenue and Longgang Avenue to Longge Road, Longfei Avenue and Longgang Avenue.
The direction of the first and last stops of Hongmian Road is increased by 1 unilateral bus stop.
Add 1 unilateral bus stop in the direction of Sha Tau Kok Passenger Station.
M3 16 line:
One terminal station was changed from the subway bus connecting station of Universiade to the first and last bus stations of Hongmian Road.
Some roads in the direction of the first and last stations of Hongmian Road were adjusted from Longgang Avenue and Longfei Avenue to Longgang Avenue, Longfei Avenue, Longxiang Avenue, Ainan Road and Longge Road, while some roads in the direction of Fuping Main Station were adjusted from Longfei Avenue and Longgang Avenue to Longge Road, Longfei Avenue and Longgang Avenue.
Add 1 unilateral bus stop in the direction of the first and last stops of Hongmian Road and 1 unilateral bus stop in the direction of Fuping main station.
The service hours of the first and last stations of Hongmian Road were adjusted from 06:00-20:30 to 05:45-20:30, and the service hours of Fuping main station were adjusted from 07:00-2 1:30 to 07:00-2 1:45.
M546 line:
One terminal station was changed from the subway bus connecting station of Universiade to the first and last bus stations of Hongmian Road.
Some roads in the direction of the first and last stations of Hongmian Road were adjusted from Longgang Avenue and Longfei Avenue to Longgang Avenue, Longfei Avenue, Longxiang Avenue, Ainan Road and Longge Road, and some roads in the direction of Pingshan Biling Station were adjusted from Longfei Avenue and Longgang Avenue to Longge Road, Longfei Avenue and Longgang Avenue.
The two sides added 1 pairs of bus stops in the direction of Pingshan Campus of Kangning Hospital, 1 unilateral bus stops in the direction of the first and last stations of Hongmian Road, and 1 unilateral bus stops in the direction of Pingshan Biling Station.
The service hours of the first and last stations of Hongmian Road were adjusted from 05:30-2 1:00 to 05:20-2 1:00, and the service hours of Pingshan Biling Main Station were adjusted from 07:00-22:40 to 07:00-22:50.
M294, M322, M547 and M303 Series:
The two sides canceled the Universiade subway connection station 1 to the bus stop, and added the Universiade subway connection station ① 1 to the westbound direction of Longfei Avenue.
The eastbound direction of Longfei Avenue is increased by 1 "Universiade subway connecting station ②" unilateral bus stop.
M305 line:
1 terminal changed from Universiade subway bus connecting station to Universiade subway connecting station ①.
M367, M3 17, N28 and B852 lines:
1 terminal changed from Universiade subway connecting station to Universiade subway connecting station ③.
Peak lines M3 18, M446 and 90:
1 terminal changed from Universiade subway connecting station to Universiade subway connecting station ④.
Peak line 180:
The two sides canceled the bus stop of "Universiade subway connection station" 1 and added "Universiade subway connection station ③"1.
Other roads and stops of the above 16 bus lines remain unchanged.