It and the first-class constructor exam are both very difficult majors, and the annual pass rate is very low.
The two have different division of labor. The first-class constructor belongs to the project construction management, and the registered cost engineer belongs to the project cost and belongs to the budget category. The most important thing is to look at the development direction. Generally speaking, there are more people who take the first-class construction engineer exam.
Personally, I think it depends on what I am mainly exposed to at work. If you have more contact with the project site, the initial construction test will be much easier. If the contact cost is more, it may be easier to test the cost.
If the work you are engaged in has nothing to do with both, it is best to take the first-class construction engineer, at least the book can be read, and the cost engineer may be difficult to understand without guidance.
Project cost refers to the total cost of a project construction. Project cost is a broad concept, which has different meanings on different occasions. Because of the different research objects, the project cost includes construction project cost, single project cost, unit project cost and construction and installation project cost. The major of engineering cost cultivates advanced technical applied talents who have good scientific literacy, master the basic knowledge of engineering cost, are familiar with the whole process management of engineering cost, undergo strict practical skills training, and pay attention to the compilation and control of engineering cost in construction stage.