Prepare feasibility economic evaluation and investment estimation: investigate and collect data, complete the preparation of economic effect evaluation, including the analysis and comparison of various financial and economic data related to technical and economic factors and scheme input and output, determine and recommend the best scheme, and issue feasibility study documents; Complete the preparation of the total investment, fund raising and investment use plan of the project, including investment forecast, investment benefit analysis and project cost determination. , and issue investment estimation documents.
Compilation of design budget estimate: collect data, calculate all the expenses required for the proposed project from preparation to completion and delivery according to the drawings and descriptions of the preliminary design or the expanded part of the preliminary design, and use the current valuation basis and relevant regulations, and issue the budget estimate.
Compilation of project budget (pre-tender estimate): according to the design and construction drawing, the current valuation basis and relevant regulations, collect data, calculate the engineering quantity and complete the valuation, and issue the project budget.
Compilation of bill of quantities: according to the Valuation Code and the design and construction drawings, compile the names and corresponding quantities of partial and sub-project projects, measures projects, other projects, cost projects and tax projects of the proposed project, and issue a list.
Compiling the tender control price: according to the "valuation standard" and the design and construction drawing, according to the current valuation basis, valuation method and relevant regulations, calculate all the expenses required for the completed and provided bill of quantities, and issue the tender control price document.
Prepare the completion settlement; According to the contract and related clauses, the completion drawings, design changes, on-site visas, claims and related policy changes in the process of project implementation, etc. , the preparation of project settlement, issued by the completion of settlement book.
Calculation of steel bar clamps and embedded iron pieces: Carefully calculate the number of steel bars (iron pieces) in the proposed project as required, and issue a calculation sheet.
Audit budgetary estimate: according to the relevant provisions of the state, examine the basis, depth and content of the design budgetary estimate and issue an audit report.
Audit project settlement: according to relevant national regulations, contract stipulations and completion data, comprehensively audit the project quantity, materials and equipment prices and pricing process, and issue corresponding reports.
Cost control in the whole process of construction stage: refers to all cost consulting services from the compilation of bill of quantities to project settlement. These include formulating detailed rules for the implementation of cost control and determining control objectives; Review the relevant expense clauses in the bidding documents, Q&A documents and contract terms; Provide audit opinions on the payment of project progress payment; Review the cost content of design change, site visa and construction claim; Complete partial settlement in stages; Review the cost information of equipment and materials; Provide other consulting services related to cost control.
Description of the standard of engineering cost consulting fee:
1. Calculation of differential fixed rate and step rate: If the project budget is100000 yuan, the service fee is calculated as follows:
1 ten thousand yuan× 3.5 ‰+(500-100) ten thousand yuan× 3.1‰+(1000-500) ten thousand yuan× 2.8 ‰ = 29,900 yuan.
2. The pre-tender estimate, project budget, bill of quantities and completion settlement do not include the calculation of steel binding. Reinforcement fixture shall be calculated according to Item 7.
3. When the bill of quantities contains the control price, the cost multiplication factor is 1. 30.
4. When auditing the completion settlement, 5-8% can be charged according to the reduction (increase) amount, and the specific range will be specifically agreed by the entrusting party in the project cost consultation contract. The reduced (increased) expenses will be paid by the beneficiary.
5. Appraisal and arbitration consultation of economic disputes on project cost shall be undertaken by engineering cost management associations (societies) at all levels or engineering cost consulting units with engineering cost appraisal qualifications. If the case is retried due to the wrong appraisal conclusion, it will be re-appraised by the Guizhou Provincial Construction Engineering Cost Management Station. If the original appraisal unit has an error of more than 5% on the original appraisal conclusion, the original appraisal fee will be fully refunded.