On the day of the New Year's Day, the School Tendering Office will convene all technical experts from the tendering units and schools to answer questions about bidding and summarize the information put forward by all parties. The summary is as follows:
Tender office
Year month day hour
can
discuss
age
ask
Tender office
Year month day hour
Bidding documents of Jinhua Vocational and Technical College
Give you another version.
The 10th Meeting of Bidding Management Committee of xx Power Grid Corporation in 2008
Meeting summary
Guizhou Electric Power Bidding ProposalNo. [2008] 128, issued by He Chaoyang.
On June, 2008165438+1October 2/kloc-0, the company's tender management committee held its 10th meeting in 2008. The meeting heard the report of the fourth batch of project bidding, supervision bidding construction, centralized meter reading system for low-voltage users of XX power grid, electric energy collection and anti-theft equipment, solar energy system engineering, material management system, anti-theft system, financial management system, main optical communication network upgrading project and supervision bidding bid evaluation expert group leader of the company's office building overhaul and reconstruction project. This paper reviews the inquiry negotiation reports of supervision of some power grid construction projects and evaluation of county-level power supply enterprises in 2008. The bidding scheme of Guiyang Power Supply Bureau's customer safety electricity risk assessment system and other projects is reviewed. Members of the tender management committee of the company attended the meeting (see annex for the list). The minutes of the meeting are as follows:
1. The meeting heard the report of the leader of the fourth batch of engineering construction project bidding and bid evaluation expert group on the bid evaluation in 2008, and made a selection resolution according to the comprehensive bid evaluation report submitted by the bid evaluation expert group.
1, Gan Tang (Duyun west) 220kV substation project, the winning bidder is xx Electric Power Construction First Engineering Company.
2.220kV Weng 'an power transmission and transformation expansion project (including interval expansion of Fuquan 500kV to 220kV Weng 'an power transmission and transformation project) was won by xx Power Transmission and Transformation Engineering Company.
3. The winning bidder of Sunjiaba three 220kV interval projects is xx Tianneng Electric Power Construction Co., Ltd. ..
The winning bidder for the new project of 4.220kV Wenglang Substation is Gezhouba Group Electric Power Co., Ltd.
The winning bidder for the new project of 5.220kV Luodian (Limu) substation is xx Power Transmission and Transformation Engineering Company.
The winning bidder for the new project (civil part) of 6.220kV Zhao Si Substation is xx Power Transmission and Transformation Engineering Company.
7. The winning bidder of Gan Tang (Duyun West) 220kV transmission line project (including Gan Tang-Duyun OPGW:12km) is xx Power Transmission and Transformation Engineering Company.
8. Xiangtan Water Conservancy and Electric Power Development Co., Ltd. won the bid for the 220kV Weng 'an power transmission and transformation extension project (OPGW synchronous construction).
9. The winning bidder of Kaili-Wenglang 220kV transmission line project (including OPGW) is xx Electric Power Construction Second Engineering Company.
10, Fuquan Substation-Kaili Substation primary and secondary circuit 220kV lines are connected to Wenglang 220kV Substation Project, and the winning bidder is xx Electric Power Construction Second Engineering Company.
1 1, Changming 1 10kV substation projects were won by xx Power Construction First Engineering Company, and the price was reduced to 5.4 million yuan.
12, Dalong 220kV substation ~ Tian Ping1/0kv substation 1 10kV transmission line new construction project (including OPGW), the winning bidder is xx Tongren Xingtong Electric Power Co., Ltd.
13, Dalong 220kV to Wanshan 1 10kV line project (including OPGW) was won by xx Power Construction Second Engineering Company, and the price was reduced to 3.5 million yuan, otherwise it was won by xx Power Transmission and Transformation Engineering Company.
14, Changming 1 10kV transmission line project (including OPGW) was won by xx Power Transmission and Transformation Engineering Company.
15, Dalong Substation and Wanshan Substation each extended110/0 kV interval project, and the bidding failed because all the bidding quotations were beyond the effective range, so the bidding work of this project was resumed.
16 and I-II circuit 1 10kV substation from 220kV substation in Qianxi to Linquan (including OPGW and 1 10kV linquan substation interval expansion project).
17, Qianxi 220kV substation ~ Chengdong 1 10kV substation phase I secondary circuit 1 10kV line project (including OPGW), four 1 10kV to/kl.
18, Bijie 220kV substation ~ Toubuqiao substation 1 10kV line project, the winning bidder is xx Electric Power Construction First Engineering Company.
19, Bijie Qingshuipu 1 10kV substation to Datun 1 10kV substation 1 10kV line project (including OPGW) won the bid by xx Power Construction First Engineering Company.
20. 1 10kV puping I-back π wiring mugang substation (including OPGW) won the bid by Liupanshui tuoyuan group xingsheng power engineering co., ltd.
2 1, puding-zhijin optical fiber communication project (including installation of zhijin optical transmission equipment and communication power supply), the winning bidder is xx power transmission and transformation engineering company.
Two. The meeting heard the report of the leader of the supervision bidding bid evaluation expert group on the construction of the fourth batch of engineering construction projects in 2008, and made a selection resolution according to the comprehensive bid evaluation report submitted by the bid evaluation expert group.
1, Gan Tang (Duyun west) 220kV substation project won the bid by xx electric power engineering construction supervision company.
2.220kV Weng 'an Substation Expansion Project (including interval expansion of Fuquan 500kV to 220kV Weng 'an Substation) was won by xx Power Engineering Construction Supervision Company.
3. The bid winner of Sunjiaba III 220kV interval expansion project is xx Power Engineering Construction Supervision Company.
The winning bidder of the new project of 4.220kV Wenglang Substation is xx Power Engineering Construction Supervision Company.
The winning bidder for the new project of 5.220kV Zhao Si Substation is xx Power Engineering Construction Supervision Company.
6. The winning bidder of Gan Tang (Duyun West) 220kV transmission line project (including Gan Tang-Duyun OPGW:12km) is xx Power Engineering Construction Supervision Company.
The winning bidder of 7.220kV Weng 'an power transmission and transformation extension line project (OPGW synchronous construction) is xx Power Engineering Construction Supervision Company.
8. The winning bidder of the 220kV transmission line project (including OPGW) from Kaili to Wenglang No.1 and No.2 substations is xx Power Engineering Construction Supervision Company.
9. The winning bidder of 220kV line from Fuquan Substation to Kaili Substation I and II to Wenglang 220kV Substation Project is xx Power Engineering Construction Supervision Company.
10 and changming 1 10kV substation project won the bid by xx electric power engineering construction supervision company.
The winning bidder of Dalong and Wanshan Substation 1 1110kv interval project is xx Power Engineering Construction Supervision Company.
12, changming 1 10kV transmission line project (including OPGW) was won by xx electric power engineering construction supervision company.
13, Dalong 220kV to Wanshan 1 10kV line project (including OPGW), and the winning bidder is xx Power Engineering Construction Supervision Company.
14 and I-II circuit 1 10kV substation from 220kV substation in Qianxi (including OPGW and 1 10kV linquan substation interval expansion project).
15, Qianxi 220kV substation ~ Chengdong 1 10kV substation I-II circuit 1 10kV line project (including OPGW), Qianxi 220kV substation ~ Gan Tang 165438. Qianxi 220kV Substation 1 10kV Line Project ~ Tailai 1 10kV Substation10kV Line Project (including OPGW and 1 10kV Substation Interval)
16, Bijie 220kV substation to Toubuqiao substation 1 10kV line project (including OPGW) won the bid by xx Power Engineering Construction Supervision Company.
17, Bijie Qingshuipu 1 10kV substation ~ Datun1kloc-0/0kv substation 1 10kV line project, and the winning bidder is xx Power Engineering Construction Supervision Company.
18, 1 10kV Puping I-back π-connected Mugang Substation (including OPGW) won the bid by xx Electric Power Engineering Construction Supervision Company.
19. The optical fiber communication project from Puding Substation to Zhijin Substation (including the installation of optical transmission equipment and communication power supply in Zhijin Substation) was won by xx Power Engineering Construction Supervision Company.
Three. The meeting listened to the report of the leader of the bid evaluation expert group on the upgrading project of low-voltage users' centralized meter reading system, electric energy collection and anti-stealing equipment, solar energy system engineering, material management system, anti-stealing system, financial management system and trunk optical communication network, and made a calibration resolution.
1, the centralized replication construction project for low-voltage customers of xx Power Grid Company was won by xx Tianneng Power High-tech Co., Ltd.
2. The bid winner of 2.xx power grid electric energy collection and anti-stealing terminal equipment procurement is Chongqing Asia East Asia Electric (Group) Co., Ltd.
3. The winning bidders for the solar power supply system project of 3.xx Power Grid Company are Zunyi and Duyun: Shenzhen Rihengli Industrial Co., Ltd.; Bijie Prefecture and Tongren Prefecture: Beijing Yiwei Xinbang Energy Technology Co., Ltd.
4. The successful bidder for the material management system of 4.xx Power Grid Company is Beijing Tongfang Electronic Technology Co., Ltd. ..
5. The winning bidder for the anti-virus system project of 5.xx Power Grid Company is Guangzhou ChinaSoft Information Technology Co., Ltd. ..
6. The winning bidder for the project of software and hardware equipment procurement and integration of financial management information system of 6.xx Power Grid Company is Yuanguang Software Co., Ltd. ..
7. The winning bidder for the equipment procurement of the main project of the upgrading and reconstruction of 7.xx power grid backbone optical communication network (10G) is Guangzhou Haiyi Electronic Technology Co., Ltd. (ZTE Corporation).
Four. The meeting heard the report of the leader of the supervision bidding bid evaluation expert group on the construction of the company's headquarters office building overhaul and reconstruction project. According to the comprehensive bid evaluation report submitted by the bid evaluation expert group, the decision was made to select xx Power Engineering Construction Supervision Company as the winning bidder.
Verb (abbreviation of verb) The meeting deliberated the Proposal on Bidding Method for Some Projects of Overhaul and Renovation of the Company's Headquarters Building, and agreed to purchase three-story dining room and four-story conference room carpets by means of inquiry negotiation, and selected the construction unit of Qingyun Road Convention and Exhibition Center exit upgrading and renovation project.
The intransitive verb meeting reviewed the Proposal on the Bidding Method of Engineering Cost Consultation for the Exhibition Center of Electric Power Technology, Environmental Protection and Energy Saving Products, and agreed to choose the engineering cost audit consulting organization by means of inquiry negotiation.
Seven. The meeting reviewed and approved the negotiation report on the evaluation and inquiry of county-level power supply enterprises, and invited the project unit to sign the contract according to the negotiation report.
Eight. The meeting deliberated and adopted the negotiation report on supervision inquiry of some power grid construction projects in 2008, and invited project units to sign contracts according to the negotiation report.
Nine. The meeting reviewed the Proposal on Bidding Methods for Environmental Protection Acceptance of Projects, and agreed to select consulting institutions by means of inquiry negotiation. Please ask the engineering department to organize the inquiry negotiation according to the inquiry negotiation plan.
X. The meeting reviewed the Proposal on Bidding for Research Project of Lightning Protection Technology for Secondary Equipment in Substation of xx Power Grid, and decided that the project unit should carry out the bidding work by itself.
XI。 The meeting reviewed the Proposal on Bidding for Optical Fiber Communication Project in the East of Xingyi Region, and decided to authorize Xingyi Power Supply Bureau to organize and implement the construction bidding for this project.
12. The meeting reviewed the proposal on promoting the project bidding method in the field of infrastructure information management system, agreed to carry out the bidding work by means of inquiry negotiation, and invited the project unit to carry out inquiry negotiation with the original system developer.
Thirteen. The meeting deliberated and adopted the Report on Inquiry Negotiation of Optical Transmission Equipment Procurement in Emergency Communication Network (Local Network), and required the project unit to sign a supply contract according to the Inquiry Negotiation Report.
14. The meeting reviewed the proposal of Guiyang Power Supply Bureau on improving the bidding method of this project, including the risk assessment system for customers' safe electricity consumption, the construction of handheld marketing information system for on-site service of power customers, the promotion of marketing automation system of county bureaus, and the monitoring of business halls, etc. It agreed with the suggestions put forward by the Power Supply Bureau and authorized Guiyang Power Supply Bureau to carry out the bidding work for the above projects.
Fifteen. The meeting heard the report of the ICT Center on the bidding situation of the expansion project of xx power digital synchronous network, and made a calibration resolution:
1. Application research on improving the technical ability of power grid communication and network system to resist major disasters. The winning bidder for the communication instrument part is Beijing Maikeya Communication Technology Co., Ltd.; The winning bidder for the network instrument part is Beijing ruitai Innovation Ye Wei Information Technology Co., Ltd.
2. Examined and approved the inquiry negotiation report of xx power digital synchronous network expansion project, and invited the project unit to sign the contract according to the negotiation report;
3. Examined and approved the inquiry negotiation report of xx power dispatching data network transmission channel reconstruction project (optical transmission equipment procurement), and invited the project unit to sign the contract according to the negotiation report;
4. The xx node construction project of China Southern Power Grid Integrated Data Network shall be implemented according to the bidding results of China Southern Power Grid Corporation. Please sign the contract according to the bid-winning notice issued by the tendering agency.
Sixteen. The meeting deliberated and adopted the Inquiry Negotiation Report of xx Power Grid 1 10 kV-500 kV Power Transmission and Transformation Project in 2008, and invited the project unit to sign the contract according to the negotiation report.
17. The meeting considered the proposal on the procurement method of the third batch of communication transmission equipment for main network projects in 2008. Due to the limitation of technical conditions, there are less than three potential bidders, so it is impossible to conduct bidding. It is decided that the bidding center will take the lead, the ICT center will cooperate, and the regulatory authorities will participate to purchase the required equipment by means of inquiry negotiation.
Attachment: List of participants
Xx power grid company
Press release issued on 1 1 February 2 1 2008
Internal development: Guiyang power supply bureau, dispatching bureau, experimental research institute and material company;
Planning and Development Department, Engineering Department, Biotechnology Department, Safety Supervision Department, Supervision and Inspection Department, Finance Department,
Marketing department, rural power bureau, enterprise management department, ICT center.
Xx Power Grid Corporation Office issued on June 2, 200811.