Interim Measures for the Selection of High-quality Structural Engineering in Chengdu
Article 1 In order to implement the Construction Law of People's Republic of China (PRC) and the Regulations on Quality Management of Construction Projects, guide and encourage construction enterprises to strengthen management and improve the quality of construction projects, these measures are formulated in accordance with the relevant national technical standards and the Trial Measures for Quality Evaluation of Construction Projects in Sichuan Province, combined with the actual situation in Chengdu.
Article 2 These Measures shall apply to new housing construction and municipal infrastructure projects within the administrative area of Chengdu.
Article 3 The selection of high-quality structural projects in this Municipality follows the principles of voluntariness, openness, fairness and impartiality, and no fees are charged.
Fourth Chengdu high-quality structural engineering is an honorary award for the construction quality of housing construction and municipal infrastructure projects in this city. Obtaining high-quality structural engineering projects in Chengdu is a necessary condition for applying for high-quality projects in Chengdu (Furong Cup).
Article 5 The high-quality structural engineering in Chengdu must ensure the safety of the foundation and the main structure, the beauty inside and the beauty outside, and conform to the mandatory provisions of the national engineering construction standards and the requirements of the current national standards, specifications and design documents.
Sixth high-quality structural engineering in Chengdu is voluntarily declared by the general contractor or the main contractor, and approved by the construction unit, survey unit, design unit and supervision unit. Encourage the participating high-quality structural projects in Chengdu to adopt new technologies, new processes, new equipment and new materials to improve the quality of the projects.
Article 7 The evaluation activities of high-quality structural engineering in Chengdu shall be conducted under the leadership of the Chengdu Municipal Construction Committee, which shall set up the Chengdu High-quality Structural Engineering Evaluation Committee to be responsible for the evaluation and identification of high-quality structural engineering in Chengdu. The office of the review committee is located in the Quality and Safety Department of the Municipal Construction Committee, and is responsible for organizing and coordinating the selection of high-quality structural projects in Chengdu.
Chengdu Construction Engineering Quality Supervision Station is responsible for the acceptance, daily verification and initial evaluation and recommendation of high-quality structural projects in Chengdu within the five urban areas (including high-tech zones) of Jinjiang, Qingyang, Jinniu, Wuhou and Chenghua. District (city) County Construction Bureau may entrust local quality supervision institutions to be responsible for the acceptance of applications, daily inspection and preliminary recommendation of high-quality structural projects in Chengdu within their respective jurisdictions.
Article 8 The review committee shall establish a review expert database. The bid evaluation expert should be a professional engineer with the title of middle and senior engineer, with professional technical knowledge and construction management experience, and be familiar with norms and standards, fair and honest.
Ninth to participate in the high-quality structural engineering in Chengdu, the project should meet the following basic conditions:
1. The construction procedure is legal and the procedures are complete;
Second, it has an independent structural stress system;
Three, the foundation of the project, the main branch are organized by the applicant;
Four, the construction technology and quality documents are complete;
Five, the construction scale requirements:
(a) the area of a single residential project is more than 3000M2.
(two) the construction area of single public buildings and industrial buildings is more than 4000M2.
(3) More than 1.5 million seats (including1.5 million seats);
(4) Gyms with more than 2,000 seats (including 2,000 seats);
(5)/kloc-0,000 or more swimming pools and art galleries (including/kloc-0,000);
(six) more than 500 (including 500) theaters (or multi-function halls);
(seven) the single building area of 2000M2 (including 2000M2) above the city overpass, the single length of 500 meters above the tunnel project;
(eight) the investment in other projects is more than 10 million yuan;
(nine) the scale of a single project can not meet the above requirements, but it has outstanding influence, commemorative significance, unique architectural style, novel design and advanced technology.
Tenth in the foundation, the main structure construction in any of the following circumstances, not included in the final evaluation scope of Chengdu high-quality structural engineering:
(a) the use of building materials, building components or chlorine-containing concrete explicitly eliminated by the state, province and city in the project;
(two) the existence of design quality defects or construction quality defects found by the design review or reinforcement of the project;
(three) in the process of bid evaluation, there are complaints, reports and verified projects due to construction quality problems;
(four) there have been more than four major quality accidents, safety accidents or violations of the main responsibility of the construction;
(five) before the main structure review, concealed works have been carried out.
Eleventh applications must be made before the project starts, and provide the following information:
(1) "Building Chengdu High-quality Structural Engineering Plan";
(2) A copy of the construction permit;
(3) A copy of the project contract;
(four) the project construction schedule, quality target plan and quality assurance control counter measures.
Twelfth application acceptance agencies to meet the requirements of the application materials audit projects should be included in the plan; If it does not meet the requirements, it shall explain the situation to the applicant within 5 working days and return its application materials.
Article 13 The Chengdu Construction Engineering Quality Supervision Station and the District (city) and County Construction Bureau shall conduct daily inspections on the projects accepted for record management according to the construction progress, quality target plan and quality assurance pre-control measures submitted by the applicant, and make original records and fill in evaluation opinions in accordance with the Provisions on the Selection of High-quality Structural Engineering in Chengdu.
Article 14 All participating projects shall be photographed at least three times, that is, before the foundation structure is concealed (not backfilled), when concrete is poured after the steel bar binding of any standard layer is completed (determined by the quality supervision organization), and before the main structure has been completed but has not yet entered the next working procedure.
Fifteenth after the completion of the main structure, before entering the next process, the applicant shall promptly submit the following application materials to the Chengdu Construction Engineering Quality Supervision Station or the District (city) County Construction Bureau:
First, the "Chengdu Quality Structural Engineering Application Form";
Second, the construction unit's self-evaluation opinions on the project and the drawings, words, videos (images) and other materials in the construction process of structural engineering;
Three, construction, survey, design, supervision, construction units of the written opinions on the foundation, the main structure.
Article 16 The Chengdu Construction Engineering Quality Supervision Station and the District (city) and County Construction Bureau shall conduct inspection and preliminary evaluation of the planned target projects, review the application materials submitted by the applicants, and recommend the review committee for review according to the daily verification. Do not meet, should explain to the applicant and return the information.
Article 17 When Chengdu Construction Engineering Quality Supervision Station and District (city) and County Construction Bureau recommend participating projects to the jury, in addition to signing opinions, they should also submit the application materials submitted by the applicant and the supervision records (photocopies) of the project quality supervisors to the jury office. The office of the review committee shall promptly randomly select experts in design, survey, construction, supervision and supervision from the expert database to form a review team. The review team shall review the quality of the engineering structure before the main structure is concealed, and submit it to the review committee after passing the examination.
Eighteenth city high-quality structure evaluation content should cover the management quality, building materials, equipment and product quality, construction quality, environmental quality and engineering quality of the main project construction process. The evaluation standard should be higher than the national standard, highlighting the key points, functions and key parts, as well as the quality pre-control measures in the construction process. The specific contents include:
A, the construction site has a complete quality management system and construction technical standards and quality control and quality inspection system for the project, and has a written execution record;
Second, the main structure should comply with the corresponding provisions of the mandatory provisions of the engineering construction standards, and must meet or exceed the standards of GB 50300-2001+0;
Three, the foundation division and the main branch of the project must be a qualified acceptance;
Four, the measured data and perception data of the engineering structure entity quality;
Five, the supervision unit of engineering structure quality evaluation report.
Nineteenth review team work procedures:
First, after the review team comes into play, listen to the introduction of the relevant responsible units about the project construction and review;
Two, access to information, including engineering construction management information and construction technology quality information;
Three, on-site inspection of the quality level of engineering structure, including perception, measurement, engineering and internal quality;
Four, a detailed record of the inspection and fill in the conclusion of the review team.
Article 20 The review committee shall organize two reviews every year to review the opinions and relevant materials of the review panel, and vote by secret ballot, and the projects with more than two-thirds of the votes will pass the review of high-quality structural engineering in Chengdu.
The project identified as a high-quality structural project in Chengdu after evaluation must be publicized for not less than seven days, and then reported to the Chengdu Construction Committee for approval and publication, and medals and honorary certificates will be awarded to the general contractor, construction unit, design unit and supervision unit identified as a high-quality structural project in Chengdu.
Twenty-first encourage enterprises to actively strive for the city's high-quality structural engineering, and Chengdu's high-quality structural engineering can be recorded in credit files as the performance data of enterprises and individuals.
Twenty-second reporting units should adhere to the principle of seeking truth from facts and shall not resort to deceit. Violators will be given informed criticism according to the seriousness of the case, until they stop applying for 1-3 years' qualification for the selection of high-quality structural engineering in Chengdu, and the winning projects will be revoked.
Article 23 A judge shall act impartially, be honest and self-disciplined, and may not accept gifts for personal gain. The evaluation should be scientific and fair. The evaluation results shall not be published by themselves. Violators will be given informed criticism according to the seriousness of the case until they are disqualified from participating in the review.
Twenty-fourth review institutions and reviewers should accept the supervision of the applicant and the public, and the reviewers who participated in the project review should take the initiative to avoid.
Twenty-fifth approach by the Chengdu Municipal Construction Committee is responsible for the interpretation of. It will be implemented as of the date of promulgation.