Standard for inspection items of hardcover rooms
First, the entrance door
1, door surface phenomenon, protective measures, locks, hinges, switches and accessories installation.
2. Installation of door frames and fans, combination of fans and frames, sealing performance, variety, model, specification, size, opening direction and installation position of doors, etc.
Second, the indoor doors and windows engineering
Door:
1. Installation and fixation of window sash, accessories, anti-falling and anti-collision measures, opening, screen window and overflow.
2, material surface condition, sealant surface condition, sealing performance, gap treatment, drip line, etc.
Window:
1. Surface inspection: bubbles, sand holes, damage, scratches, etc.
2, hollow, tempered, frosted, flat, heat absorption, reflection, interlayer, iron wire, embossed glass inspection, etc.
Third, indoor ground engineering
1, marble tiles: hollowing, levelness, flatness, color difference, defects, scratches, cracks, missing edges and corners, gap size, surface jointing, finished product protection, etc.
2. Wood floor: surface condition, laying, joint treatment, flatness, sealing, gap treatment, etc.
3. The skirting line: the skirting line installation, interface, gap treatment, flatness, etc.
Four, indoor wall top surface engineering
1. Finishing works: flatness, verticality, levelness, angle of yin and yang, plastering, finishing, sinking, cracking and finished product protection.
2. Paper pasting items: joint leveling, straightness, yin and yang angle, sealing treatment, color difference, pollution, paper pasting, etc.
3. Lightweight partition wall: plate partition wall, glass partition wall, fixation, flatness, verticality, sound insulation, moisture prevention, etc.
4. Soft packaging project: installation, fabric, surface condition, border treatment, etc.
Five, beam surface cylindrical engineering
Levelness, verticality, flatness, inclination, hollowing, cracks, exposed steel bars, honeycomb, sinking, etc.
Six, ceiling engineering
Surface smoothness, joint condition, necking treatment, fixing condition, gypsum line, lamp trough installation, etc.
Seven, the finishing touches
Smoothness, coating surface, putty scraping, cracks, depressions, sand grains, etc.
Eight, door, cabinet integrated home equipment
1, solid wood door: surface, sash installation, verticality, opening, door and window cover, door hinge, lock, door suction, paint film, etc.
2. Sliding door: door surface, rail installation, fixing, door leaf opening, fittings installation, etc.
3. Cabinets: Cabinets are fixed in installation, verticality and levelness, finished product protection, drawers, cabinet door switches, hardware accessories, etc.
Nine, the kitchen
1. Integral kitchen cabinet: cabinet body, cabinet door, countertop, kitchen kit, wall hanging, sink, cooker accessories, pipes and gap treatment.
2. Wall and floor pasting: pasting, hollowing, levelness, flatness, finished product protection, jointing, ground flooding slope, water leakage, etc.
X. restroom
1. Sanitary ware and accessories: brand, specification, finished product protection, leakage, installation, fixing and sealing of accessories.
2. Wall and floor pasting: pasting, hollowing, levelness, flatness, finished product protection, jointing, ground flooding slope, water leakage, etc.
XI。 balcony
1 and * * * Features: external balcony, flooded slope, hollowing, cracks, wall tiles, leakage, etc. (Field closed water test)
2. Guardrail: vertical spacing, safe distance, height, installation and fixation of guardrail, etc.
Twelve, building electrical engineering
1. Safety: grounding mode, total equipotential connection, label of air switch, laying of electrical circuit, conductor material, wire diameter, etc.
2. Distribution box: wiring, wiring, protective grounding wire, leakage protector, air switch, etc.
3. Switch socket: connection, installation, special line, special road, ground wire configuration, etc.
4. Lighting circuit: loop control, identification, smooth power supply, etc.
5. Equipotential bonding: equipotential bonding trunk lines, local equipotential box connections, etc.
6. Lamps and lanterns: number of lamps and lanterns, installation, joint treatment with top surface, surface protection measures, etc.
Thirteen, building weak current engineering
Weak current system: TV information pipeline equipment, VoIP, integrated wiring, security, access control system, etc.
Fourteen: Water Supply and Drainage Works
1, * * *: pipeline fixing, pipe fitting interface, water seepage and rust prevention treatment.
2. Water supply: water supply fittings and hot water pipes are insulated and pressure tested on site.
3. Drainage: treatment measures for fire hydrant, launching, flooding slope, trap, water seal depth, and connection between pipeline and wall and ground.
Fifteen, reserved holes
Exhaust pipe, exhaust pipe, air conditioning hole, forced exhaust hole
Whether the settings of smoke exhaust duct, exhaust duct, air conditioning hole and forced exhaust hole are reasonable; Whether the reserved holes conflict with drainage pipes and rainwater pipes.