Construction scale and main technical indicators: the total length of Deqing Xijiang Bridge is 2,482.2 meters, of which the bridge length is 1.274.87 meters, the approach length is 1.207.33 meters, and the total project investment is 1.35 million yuan.
Bridge deck width: full bridge deck width 12.5m, clear width 1 1.5m, roadway 9m, sidewalks on both sides of the bridge respectively 1.25m, and 0.5m wide anti-collision guardrail is set outside.
Design load: car with more than 20 people, trailer 120.
Navigation standard: two main navigation holes and two auxiliary navigation holes, with a clear width of 90m for the main navigation hole, 70m for the auxiliary navigation hole and a clear height of 18m.
Construction of Xijiang Bridge: This project is jointly invested by Provincial Communications Department, Municipal Highway Bureau, Deqing County, luoding city, Yunan County and Hong Kong New World Group, with the proportion of Chinese contribution being 35% and foreign contribution being 65%. It was built by Provincial Changda Highway Co., Ltd. and County Highway Bureau.
Xijiang Bridge1August 1996,1May 26, 1998,141October 23, the whole bridge was completed. "One bridge flies north and south, and the natural moat becomes a thoroughfare", Deqing Xijiang Bridge will surely play an important role in economic development and social progress on both sides of the middle reaches of Xijiang River in central and western Guangdong.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.