Hangzhou Shaoyong expressway introduced?

Hangzhou-Shaoxing-Ningbo Expressway refers to the double track of Hangzhou-Ningbo Expressway from Shaoxing to expressway in Ningbo, passing through Ningbo, Shaoxing and Hangzhou and ending at Hangzhou Ring Expressway, with a total length of about135km. Zhong Da consulted various building websites and got relevant information about Hangzhou-Shaoyong Expressway:

Hangzhou-Ningbo expressway (the first expressway in Zhejiang, 145km long, 1996 opened to traffic, and in 2007165438+1October 28, the whole line realized two-way eight-lane traffic) and National Highway 329 have great traffic pressure, so it is necessary to build another expressway from Hangzhou to Ningbo.

The planned total length of Hangshao expressway is 1.28km, with two directions and six lanes. It will be connected with Jiashao Bridge, Hangzhou Bay Cross-sea Bridge and Jintang Bridge of Zhoushan Island connecting line project, and form a north-south echo with Hangzhou-Ningbo Expressway. The project started on 20 10.

According to the plan, Hangzhou is 25 kilometers long and Ningbo is about 90 kilometers long. Ningbo section is implemented in two phases: the first phase is about 75km from Sundong to Yuyao Xiaocao' E in Zhenhai, and the second phase is about15km from Yuyao Xiaocao' E to Shaoxing in Ningbo.

Hangshao Expressway starts from Xiasha, Hangzhou in the west, goes from west to east along the south bank of Hangzhou Bay, passes through Shaoxing, reaches Ningbo, and indirectly contacts Zhoushan.

Hangshao expressway, about 25 kilometers long in Hangzhou, has six lanes in both directions. The newly-built section of Ningbo is about 65 kilometers, including the section from the south connection of Hangzhou Bay Bridge to Jintang Bridge and the section from Andong Interchange to Simen Bridge.

Hangshao expressway is a expressway along the south bank of Hangzhou Bay, and it is a passage across Hangzhou Bay and Qiantang River. It can establish horizontal connecting lines, give full play to the advantages of channels, and divert the existing Hangzhou-Ningbo Expressway. At the same time, Hangzhou-Shaoxing-Ningbo-expressway can be used as the second expressway between Zhoushan, Ningbo and Hangzhou to enhance the concentrated radiation capacity of Beilun and Zhoushan Port.

According to the alignment scheme, the total length of Hangshao expressway is about 1, 6 1 km, and the south connection of Hangzhou Bay Bridge is about 24 km. Hangzhou is about 9 kilometers long, Shaoxing is about 29 kilometers long, and Ningbo is about 123 kilometers long.

The starting point of the route is near the south connection of Qianjiang Passage, but the specific location has not yet been determined. At present, there are three schemes: the starting point of Wan Xin, the starting point of Dangwan and the starting point of benefiting agriculture. The wharf is located at Chaiqiao Hub, connecting expressway and Liu Heng Highway Bridge. Expressway is built with two-way and six lanes.

The above is the introduction of Zhong Da Consulting of CBI to Hangshao Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.