You must have this form when you close the door. If not, even if you close the house, it doesn't mean you are the owner of the house.

Many people are buying houses for the first time, and they don't know much about the problems and processes of repossession. When repossessing the building, we must pay attention to the specific details, and some places must be carefully inspected. Someone should have reported this when the house was closed. If not, ask the developer in time. Otherwise, even if the house is closed, it doesn't mean you are the owner of the house. Let's have a look.

Let's first take a look at what form it takes to close the house.

Today, I will focus on a more important repossession form, that is, the completion acceptance record form, which is related to whether the property can be successfully managed in the future and let the owner become the real owner of the house.

The filing of the completion acceptance of a construction project refers to the behavior that the construction unit reports the completion acceptance report of the construction project and the approval documents or permission documents issued by the planning, public security, fire protection and environmental protection departments to the construction administrative department for review after the completion acceptance of the construction project.

Some houses themselves do not have the conditions to apply for real estate licenses, so they cannot apply for real estate licenses, but some houses may not apply for real estate licenses temporarily because of problems in the houses themselves or other reasons.

Let the developer show the construction quality certificate. At the same time, it is necessary to obtain residential instruction manual, residential quality guarantee and comprehensive acceptance certificate of real estate development and construction projects.

In addition, there are various related acceptance forms, such as the household acceptance handover form (the functional partition of the room and the subject matter list the acceptance contents, such as the living room floor and balcony floor, etc.). ) and acceptance form (such as building acceptance record).

Finally, after studying the purchase contract, confirming the collection process, verifying the information on site, collecting and receiving the house inspection form, paying the money, giving the key and inspecting the house, the last step is naturally to sign the check-in handover form. If the owner feels that there is not much problem with the house, he can sign the "check-in handover form" directly, which is equivalent to handling the check-in procedures.

Second, what should I pay attention to in the acceptance of new house decoration?

1. Check the doors, windows, balconies and other places of the new house in detail to see if the doors and windows are cracked and open and close normally. Pay attention to whether the balcony cracks are too large and whether the fence is solid and reliable. If it is a duplex building, check the firmness of the stair fence to see if there are any signs of looseness. If so, inform the decoration company in time and pay attention to the workers' correction at any time.

2. Whether there are cracks in the wall, whether it is easy to seep water and whether the wall is flat or not needs to be carefully checked. In the decoration, wall decoration also accounts for a large proportion, whether it is the living room wall, or the top surface of other walls such as bedrooms, kitchens and bathrooms, we must check clearly. It is also necessary to make it clear to the decoration company that there are water leaks, water seepage and cracks, and then supervise the maintenance of workers and return home with a safe and beautiful wall.

3. Whether the floor is paved with tiles or boards, remember to check whether the floor is empty and cracked. Empty drum is easy to cause the accident of punching through the floor during decoration, and the ground cracks are easy to penetrate into the downstairs residents, affecting the neighbor relationship.

4. Turn on the faucet to check whether there is water leakage, which is easy to block and not closed tightly. You can turn up the tap to make the water flow faster and check whether the water pressure and drainage speed are normal. Test whether the lights at each switch are lit normally, and use a multimeter to test whether the strong and weak current are unblocked. Taking a wok can test whether the coal can be used normally, which is related to the safety of the family after moving in. The host must not be careless.

5. The step to check and accept the launch situation is to fill each launch site with a basin of water, about two basins of water are enough. If there is a grunt and there is no water on the ground, it means that the launch site is normal.

6. Generally, when a new house is renovated, there will be some harmful smells, such as formaldehyde, which will do great harm to people. You can put some plants in the flowerpot to absorb harmful gases.

7. When the general owner talks about the decoration preferential conditions with the decoration company, the decoration company will attach some facilities and equipment, such as upgrading the main materials of the base materials and giving away home appliances. Therefore, when accepting the new house, it is necessary to check whether the facilities and equipment marked as gifts in the intention contract are complete.

For those who accept the house, they must know the details of the house before accepting the house, pay attention to the quality of the house and some basic projects, and avoid problems after living in the future. When decorating a new house, it is recommended that you ask a professional decoration company to carry out the construction to ensure the quality of use.