House information: 120_
Decoration style: Nordic IKEA
Decoration method: half package
Community: Lily Huafu
Progress of renovation: hydropower renovation.
Transformation period: 17 days
2065438+May 22, 2005
From April 30 to May 22, 22 days later, the demolition was finally completed, and water and electricity finally came into play! For such a long time, I can't speak out. It is said that the demolition workers in our family are different. My neighbor told me that I came twice and saw different people. Forget it, forget it. At such an important moment when hydropower enters the market, of course, I need my husband's support! Let my husband take a day off to stay at home. In the morning, the project manager and the designer come together to determine the position of the switch and socket. In the afternoon, the supervisor went to his home to check and accept the water and electricity information together. No problem. 4 square lines will be delivered in two days.
2065438+May 22, 2005
The electrician lives in my house for seven or eight days. It feels so long! But just work hard! When I went to see the house in the afternoon, the electrician actually stepped on the water and electricity pipe to go to work. I was worried at first, but later my husband said that the supervisor said that if the station was broken, there was something wrong with the materials. Well, I believe that electricians are experienced! It's finally finished anyway! I feel that the decoration is finally about to start!
2065438+May 23, 2005
The long-awaited ventilator is finally going to be installed! This is the first time I realized that the renovation plan couldn't keep up with the changes, and all kinds of unexpected situations happened. It was also the first time I felt the terrible decoration. Our house is an old house in 2004. At that time, the air-conditioned tunnel was under the wall, and now it is necessary to install a ventilator on the wall! Moreover, the wall leading from the balcony to the outside is parallel to the floating window platform outside, so it is not easy to make holes. I just studied how to punch holes for more than an hour.
Just when I was in a dilemma and didn't know how to deal with it, my aunt went downstairs! She told me that the user of 2403 also installed an air duct machine and made an oblique hole in the balcony to the outside. She asked me to insist on doing this, saying that this is the most economical pipeline, the best host, and the best ceiling for hiding pipelines! With the support of an aunt, my husband and I insisted on walking on the top of the pipe and drilling oblique holes to wear the pipe.
2065438+May 26, 2005
The master of hydropower lives in my house. He is very nice and good at communication. Today, I went to the next house, and the progress of putty eradication was very slow. Because the original house was decorated with a layer of putty, it is said that shoveling is very difficult! The water and electricity have been dug and the wires connected. The master bedroom, the second bedroom, the balcony and the living room are basically done, but I feel that these slots are not neat at all. I remember that the slots opened next door were all very uniform. At least from the appearance, this one in my house is a bit inferior. Two renovation at the same time, the advantage is that there are things to discuss together; The downside is that, by comparison, I feel a little sad.
2065438+May 28, 2005
It has been a whole week for water and electricity, and it is said that it will take another whole week. Damn reinforced concrete! The progress is too slow, so we have to wait and wait. Daikin next door, today. I took one look and came back. What a long construction period!
May 30, 2065 438+05
I haven't been to the construction site for two days! I went to see it today, and the grooves are basically opened, and the pipes are being laid one after another. Manager Cao came today, and all the windows were pasted with the company logo and various banners. There is strong electricity in the weak box, wrapped in tin foil, which should still be standardized! The big stone in my heart has finally landed, so I should be able to accept it next week!
June 20 15 0 1
Come in, the plumber is not here. The plumber next door told me that our workers went out to work early in the morning. I asked my husband to call the project manager, but he didn't answer. Do you think I should give him a week to take his time? The whole room was painted solid green and felt like a Hulk. The ground solid is sent by the decoration company to prevent the cement from sanding. The wiring of the whole room is almost laid, quite neat and looks quite standardized. I can't come for the next three days. I hope the master won't let me down and finish it quickly!
June 7, 1965 438+05
Today's water and electricity acceptance.
Step 1: Pressure measurement by Jinniu water pipe manufacturer. Originally, it was about 10, and the project manager, the director of the decoration company and the staff of Jinniu water pipe manufacturer arrived at 9: 00. Husband hurriedly got up and ran over. When I got there, it was almost finished. The general water pressure test is 0.8MPA, the normal water pressure at home is 0.3MPA, and the Taurus pressure test is 1.2MPA, and the people from the factory come over, so everything is at ease. On the signed manometer, a few words were written in big letters: "Use it safely for 50 years!" Ok, will my house still be there in 50 years?
Step 2: Acceptance of water pipe wiring. After the supervisor came today, he agreed to my request to change the direction of the hot water pipe yesterday. Workers' rerouting is also in place, there is no problem in other places, and the waterway acceptance is relatively smooth.
Step 3: Circuit acceptance. Director Zeng 10 arrived at 10: 30. During this period, the project manager, supervisor and we confirmed the arrangement of sockets and switches one by one. Once the supervisor came, he also looked at it together, and a * * * proposed the following rectification projects:
1. Introduction of videophone: It turns out that the videophone line was put there through a pipe, which is ugly and difficult to handle in the future. Workers need to install a box and wind wires in it.
2. The network cable interface of the study should be placed under the desk.
3. The incoming line of the kitchen is 4 square meters, but due to wiring reasons, the line on the side with large electricity consumption is 2.5. It is required to change it to 4 square meters.
4. The master bedroom needs double control for disclosure and single control for final rectification.
5. The wires of the two sockets on the balcony are exposed, so it needs to be rectified.
The distance between strong and weak electricity on the ground is 20 cm, which does not meet the standard of 30 cm. The supervisor criticized the workers. The supervisor said it would not affect the use, and we didn't ask for rectification.
In the past, the hot water pipe was punched according to the method of taking the hot water pipe to the living room, and two holes were punched. Later, the project manager suggested that the water pipe should be changed as soon as it entered the door, and three holes were drilled. This hole was drilled by an electrician and took 150. I still trust my project manager and workers, but 50 holes, one of which is red brick, are too expensive. But there is nothing we can do. After all, we don't have time to come by ourselves. Next door is also a decoration company looking for someone to punch holes, every 30 yuan.
Generally speaking, the acceptance of water and electricity is relatively smooth, and the supervision also says it is relatively standardized. Compared with other troublesome renovations, the renovation of my home is really worry-free, except that the construction period is a bit slow. Look forward to the future!
More exciting reading recommendations:
Nine commandments of decoration, be a law-abiding owner.
Teach you to read the "argot" in the decoration model room
What should I do if I am afraid of cold in winter? Is floor heating better or floor heating better?
I am no longer afraid of taking a bath in winter, and the bathroom floor heating has many benefits.
Don't expose the misunderstanding of IQ small apartment decoration and learn secretly
A secret that a decoration company won't tell you.
Diary of Supervision and Acceptance of "Natural Enemy" of Decoration Company