1, engineering materials and engineering equipment, whether included in the project cost or not, shall be included in the charging base.
2. Both parties choose 5. 1 and 5.2 charging methods; Among them, the charging method of 5. 1 should be calculated, and the benefit expenses should be borne by the beneficiary.
3. The whole process cost control in the project implementation stage does not include the review of bid price and re-measurement caused by modification of drawings, and the consulting fee shall be determined by both parties through consultation; If this happens to other consulting projects, please refer to the implementation.
4. The decoration project, installation project and repair project entrusted separately shall be multiplied by the coefficient 1.2 on the basis of the above expenses.
5. The audit fee for project budget, bill of quantities, bill budget, fixed budget and final accounts shall be multiplied by the coefficient of 0.9 on the basis of the above fees.
6. The consulting fees for the preliminary work of construction projects, including the preparation and evaluation of the special study of construction projects, project proposal or feasibility study report, and other consulting service fees related to the preliminary work of construction projects, shall be determined by both parties through consultation with reference to market conditions.
7. Pre-control in engineering design stage, such as comparison of supporting design schemes, optimization design, quota design, etc. According to the consulting work content and workload, the consulting fee shall be determined by both parties through consultation. The fluctuation range of this model is 20%.