What is the telephone number of Wuhan Chengtou Sunac Guo Bo Marketing Center?

The telephone number of Wuhan Chengtou Sunac Guo Bo Wuji Marketing Center is 4006569058 ext. 14589 (copy "4006569058, 14589" to dial with one button quickly on the mobile phone dial-up interface), free consultation on project preferential information is provided, and direct bus service is provided.

Wuhan Chengtou Rongchuang Guobo City is located at the intersection of Sixin South Road and Ezhu Road in Hanyang. It is a 70-year-old ordinary residence with a small high-rise building, which was developed by Wuhan Xincheng International Expo Center Co., Ltd.

Wuhan Guo Bo New Town Project has a planned total area of 6,253 mu, a planned total construction area of 7 million square meters and a total investment of over 654.38 billion yuan. The 460,000-square-meter exhibition hall of the International Expo Center, the 654.38+100,000-square-meter conference center and the 265,438+100,000-square-meter super five-star intercontinental hotel have been completed and put into use, and the 500,000-square-meter global cultural center is under construction. In the future, the 300,000-square-meter super-high-rise riverside landmark twin-tower office building, 6.5438+0.2 million square meters-Wuhan Guo Bo New City, is the largest comprehensive urban project in the history of Wuhan's construction and development. Upon completion, it will form a multi-functional and compound Wuhan city sub-center with exhibition as the leading function and integrating exhibition, science and technology, culture, business, leisure, tourism and residence. Zone D of Guo Bo New Town in Wuhan is located in Sixin District, Hanyang District, Wuhan. The total project area is about 580,000 square meters, the planned construction area is about 6.5438+0.44 million square meters, the residential construction area is about 6.5438+0.88 million square meters, and the underground construction area is about 5.65438+0.08 million square meters. It consists of 7 plots from D8 to D654.38+0.4, and the overall planning layout is super high-rise building. Plot D 13 is located at the intersection of Huizhan South Road and Guo Bo Avenue. Plan the subway 12 line route in the future. The overall planning of the community is "two axes, two corridors, three districts and three cores". The two axes, D9 and D 13 respectively, are the east-west dynamic motion belt that runs through the whole plot, which increases the vitality of the community and separates the residential area from the commercial area. The third area is a high-quality commercial and residential area on the east and west sides; The three cores are the supporting core of public construction, the core of commercial street and the core of residence. This is an active youth community integrating residence, commerce and education, and it is the focus of Guo Bo New Town Project. The planned net land area is 67860.9 1 m2, and the plot ratio is 2.45; The total construction area is 232,502.85 square meters, and the floor area ratio is166,445.45 square meters, of which144,300 square meters is residential, and the area section is 85- 164 square meters. The total number of apartments is 1222, and the commercial area is about 12000 square meters. This is a block street. .

Property type: commercial-store, residential.

Current price: 13500 yuan/square meter.

Pre-sale certificate: Wufangkai Pre-sale [2023] No.491

Estimated opening time: 2023- 12-09.

Estimated delivery time: June 0, 20251

Planned families: 792 households

Number of parking spaces: there are 0 above-ground parking spaces, with people and vehicles separated, and 902 underground parking spaces, totaling 902.

Floor situation: plot C4 of Chengtou Sunac Guo Bo * * 10 includes residential 10 floor, including small high-rise 15 floor, high-rise 33 floor, small high-rise 1-7 # 15 floor and high-rise 8-15 floor.

Property features: along the subway, duplex, direct bus, self-sustaining business, mature supporting facilities and shopping center.

Peripheral facilities: There are 306 and 385 buses at the bus stop of Wenju Street on Ezhu Road. The project is only 700 meters away from Guo Bo Central Hub Port. At present, there are 16 bus lines (306, 385, 6 1, 5 17, 554, 580, etc. ) You can reach three towns in Wuhan. There are four subways planned around the project, of which Line 6 has been opened to traffic, 1 1, 12 and 16 are under construction, and 16 is expected to open to traffic in 20021year. This project is adjacent to Line 6, 16 Guo Bo Central South Station and 12 World Expo Road Station. Self-built kindergarten project 12 class, Simon International Kindergarten in Area C, and surrounding kindergartens in Wan Sida; Guanlan international Bilingual Kindergarten Primary and Secondary School Xijie Primary School Guo Bo Campus, Rose Garden Primary School, Zhongjiacun Primary School, Wuhan No.3 Middle School, Wuhan No.23 Middle School, Wuhan Foreign Language School, Cuiwei Road Middle School and other comprehensive shopping malls are connected to Zhongjiacun Business Circle in the north, Wangjiawan Business Circle in the west, and art commercial streets such as Wang Yongmeng Lecheng Hospital, Wuhan Yaxin General Hospital, Taikang Tongji (Wuhan) Hospital and Wuhan Chinese Medicine Hospital in the south, each with its own customs about 1.2.

Click to view: details of Wuhan Chengtou Rongchuang Guobo City.