Drilling contract

Seven sample essays on drilling contracts

In a society where people believe in law more and more, the position of contract is becoming more and more important, and contract coordinates the relationship between people and things. I believe everyone is worried about writing another contract. The following are seven drilling contracts that I compiled for you, for reference only. Let's have a look.

Drilling Contract 1 Party A:

Party B:

1. Well depth 8 1 m, RMB per meter, totaling RMB.

2. Party A shall deduct RMB from the well fee and quartz sand. Geotextile elements.

Three. Other materials used in the well. Party B shall bear the electricity fee of RMB yuan for bamboo fiber cement.

Four. Mediate Party A's burden in the village.

5. All safety accidents on the shelf shall be borne by Party B. ..

VI. The well depth is 80-8 1 m. If the well is broken, Party B shall bear it. ..

Seven, after the completion of drilling, the remaining materials will be deducted from the payment of Party B..

Eight, Party A always * * deadline lunar calendar one day to complete the project, except the calendar.

Nine. Settlement method Party A shall pay Party B a settlement fee for each eye more than five days before the payment is completed. Both parties abide by the above conditions, and whoever breaches the contract will bear the consequences.

Party a: party b: MM DD YY.

The second part of the drilling contract sinking engineering construction contract

Employer (Party A):

Employer (Party B):

In order to solve the problem of irrigation and domestic water, Party A newly drilled a deep well about one meter. Party B is now entrusted with the construction. In order to ensure the quality and quantity of the project to be completed on schedule, this contract is signed through full consultation between both parties.

Article 1 General situation of the project

1, project name: deep water well project

2. Project location:

3. Project content and contract scope: drilling, well pipe installation, gravel pouring, hole sealing, well cementing, pump body installation, pumping, water quantity and water temperature detection.

5, engineering standards:

(1) According to the surrounding geological data, it is estimated that the well depth is around, and the actual well depth is determined by Party B according to the geological conditions during construction.

(2) The well tube materials used are:

(3) Water output: ton/hour, water temperature.

(4) Water quality standard: it meets the drinking water standard. (Approximate water quality of surrounding wells)

(5) Water stopping method: Mud ball stops water.

(6) Filter material: high-quality quartz sand is adopted to meet the requirements of gravel packing for completion.

(7) The model of the water pump is.

Article 3 Rights and obligations of Party A

1. Before the commencement date, provide Party B with 200 square meters of construction site without potential safety hazards. There are no construction obstacles such as houses, trees, high-voltage electricity in the air, communication cables and underground ditches on the surface.

2. Ensure that the roads and navigation channels leading to the construction site are unblocked, so that Party B can transport machines and tools and engineering materials normally during the construction period.

3. Provide electricity, water, mud discharge and residence for construction free of charge.

4, responsible for the determination of the site well location.

5. Assist Party B to do a good job in material storage and security at the construction site.

6, according to the provisions of article 6 of this contract, pay the project price and related expenses.

Article 4 Rights and Obligations of Party B

1, according to the requirements of Party A, put forward the design scheme of sinking engineering for construction.

2. Ensure that the construction is carried out according to the technical requirements of the contract, and accept the supervision of Party A and the supervisors.

3. The self-provided sinking tools shall be constructed by Party A, and the transportation expenses of the tools shall be borne by Party A..

4. Party B shall be responsible for the safety accidents during the construction.

5. Before completion, provide Party A with the actual well depth, well structure, water absorption horizon and water sealing technology.

6. Start work on time, complete it on time, and submit it to Party A for acceptance.

Article 5 Project acceptance

1. After the project is completed, Party A must organize acceptance within two days. If it is not accepted for use, the well is considered qualified.

2. The acceptance criteria shall be implemented in accordance with the provisions of Item 5 of Article 1 of this Contract and related regulations.

Article 6 Project Price and Payment

1, project price. The unit price of water well construction is RMB/meter.

2. The price of water pump is RMB.

3. Payment method and payment term: 60% of the total project cost shall be paid after the contract is signed and the construction machinery and personnel enter the site. When the well water is sent for inspection, all the project funds will be settled.

4. If the project cannot be started halfway due to Party A's water intake procedures or man-made reasons, Party A will give Party B RMB subsidy.

Article 7 During the performance of this contract, if there are matters not covered or individual clauses need to be changed, both parties may sign a supplementary agreement through consultation.

Article 8 This contract is made in duplicate, with each party holding one copy.

This contract shall come into effect as of the date of signature and seal by both parties.

Party A: Party B:

Article 3 of the Drilling Contract Party A (Owner):

Party B (construction party):

According to the provisions of the Economic Contract Law of the People's Republic of China and the Regulations on the Administration of Construction Market in Henan Province, and in combination with the trading rules of decoration engineering and the specific conditions of this project, the two parties reached the following agreement through friendly negotiation:

I. Main contents of the contract:

The drilling project shall be handed over to Party B for construction in form.

2. Total Project Cost (in words)

3. Project content: ① Party A agrees that Party B's drilling depth is tentatively set at meters. If the sampling of drilling water does not meet the drinking water standard, with the consent of Party A, Party B can increase the drilling depth. (2) The drilling cost per meter is tentatively determined according to the 500 yuan standard. (3) According to the drilling position determined by Party A, if Party B encounters gravel stratum, causing damage to Party B's drill bit, Party A shall bear the cost of purchasing the drill bit.

4. Project payment method: 65% deposit will be paid on the day of signing the contract.

5. The construction period is days, from year to year.

6. The warranty period of the project is one year.

7. Settle the balance within three days after the completion of the project.

8. According to Party A's requirements, Party B provides Party A with a set of water intake equipment, including a deep water well pump and a well house, and the amount is included in the general project contract.

For the project located on the urban road, Party A shall pay 30% of the half-year payment, and 5% of the balance after the project is completed, and provide a set of water supply equipment without tower, which is RMB.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 4 of Drilling Contract Party A: Baishi Town Civil Affairs Office

Party B:

In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties hereby conclude this contract on the matter that Party A entrusts Party B to dig wells through consultation.

I. Project site

Yinshanjiao Home for the Aged in Baishi Township.

Second, the project and related requirements

1. construction project: a deep water well with a depth of120m. The borehole diameter is 600 mm, and the well pipe diameter is 300 mm.

2. Technical requirements: Ensure normal water use in dry season, with water output of 35 m3/ hour.

3. The construction electricity cost generated by drilling shall be borne by the drilling construction unit.

Third, the time limit for a project requirements

The construction period of this project is: 20x65438+February 1 to 20x65438+February 25th, and the construction period is 25 working days.

Fourth, the project price

The project price is 450 yuan/m, and the total price is 54,000 yuan only (this item is120m, and the increase or decrease of well depth shall be settled according to the facts). The above total price is the expenses paid by Party A to Party B, including the main material cost, auxiliary material cost, labor cost and transportation and miscellaneous expenses of the engineering cement pipe.

All expenses, etc. In addition, Party A will not pay any fees to itself. If there is any change in drilling depth, the actual quantities after acceptance shall prevail.

Verb (abbreviation of verb) payment terms

After Party B enters the site, Party A will pay 20,000 yuan in advance, and the rest will be paid in one lump sum after Party B's project is completed and accepted.

Liability for breach of contract of intransitive verbs

1. If the completion is overdue due to Party B's reasons, Party B shall pay a penalty of RMB 200.00 to Party A for each day overdue, and compensate Party A for the resulting economic losses.

2. If either party violates the terms of this contract, it shall pay 30% of the total contract price to the observant party as liquidated damages, and bear all economic losses caused to the other party.

Seven, quality and safety in production

1. Party B shall carry out the construction in strict accordance with relevant standards and specifications. If there are other unqualified problems such as dry wells or the water output fails to meet the prior agreement, Party B shall unconditionally bear all the expenses and return the 20,000 yuan paid by Party A in advance.

2. Safety in production: Party B shall provide safety education to construction personnel. In case of casualties, Party B shall bear all responsibilities and pay all expenses.

Party A: Party B:

Legal representative:

Year after year, month after month, year after year.

Article 5 of Drilling Contract Party A (Owner):

Party B (construction party):

According to the provisions of the Contract Law of People's Republic of China (PRC) and the Regulations on the Administration of Construction Market, and in combination with the trading rules of decoration engineering and the specific conditions of this project, both parties have reached the following agreement through friendly negotiation:

I. Main information of the contract:

The drilling project shall be handed over to Party B for construction in form.

2. Total Project Cost (in words)

3, engineering data:

(1) Party A agrees that Party B's drilling depth is tentatively set at meters. If the sampling of drilling water does not meet the drinking water standard, Party B may increase the drilling depth with the consent of Party A..

(2) The drilling cost per meter is tentatively determined according to 500 yuan standard.

(3) According to the drilling position determined by Party A, if Party B encounters gravel stratum, causing damage to Party B's drill bit, Party A shall bear the cost of purchasing the drill bit.

4. Project payment method: 65% deposit will be paid on the day of signing the contract.

5. The construction period is days, starting from _ _ _ _ _ and ending at _ _ _ _ _.

6. The project warranty period is _ _ _ _ _ _ years.

7. Settle the balance within _ _ _ days after the project is completed.

8. According to Party A's requirements, Party B brings Party A a set of water intake equipment, including a deep water well pump and a well house, and the amount is included in the general project contract.

For the project located on the urban road, Party A shall pay 30% of the half-year payment, and 5% of the balance after the project is completed, and provide a set of water supply equipment without tower, which is RMB.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 6 Through equal consultation, Party A and Party B of the drilling contract reach the following terms on the matter that Party A entrusts Party B with drilling:

1. Project location: near the school gate.

Two. Duration requirements: the duration is 20xx February 20th +20xx February 25th, 5 calendar days.

III. Project and related requirements:

1. construction project: the actual depth of the well depends on the groundwater level.

2. Specification of well pipe: the inner diameter is 90cm, and the outer diameter is 100cm, so as to ensure the smooth movement of submersible pump and maintenance personnel.

3. Requirements of the well fort: it must be firm and flat.

4. Water depth requirement: 60 cm

Fourth, the project price:

Drilling depth is less than 6m 1, 1.800 yuan; More than 50 cm, no extra charge; () If it exceeds 50 cm, it shall be paid according to the labor service price per meter of 300 yuan, and the total price shall be subject to the actual drilling depth (meters under the pipe).

2. The total project price is the expenses payable by Party A to Party B, including all expenses such as auxiliary materials, labor, transportation and miscellaneous expenses, and Party A does not pay any expenses to Party B. ..

Verb (abbreviation of verb) payment method: After the project is completed and accepted by Party A, Party A pays 90% of the total price to Party B, and reserves 10% of the total price as a quality guarantee, which will be paid one year later.

Obligations undertaken by Party A for intransitive verbs:

1, arrange the site needed for construction in time.

2. Ensure the water and electricity supply required for the construction and bear the expenses.

Seven. Obligations undertaken by Party B:

1, responsible for exploration and related facilities required for drilling.

2. To ensure the safe construction, Party B shall take full responsibility for all accidents such as casualties caused by violation of operating rules.

3. After well washing and dredging, ensure that the well depth is not less than 7m. And assist the school to fill the excavated earthwork into the bunker in the playground.

4. In case of waste wells, collapse, no effluent or substandard effluent due to quality problems, Party A shall pay the labor cost of RMB 0/00 per meter, but choose another site to drill wells, and Party B shall be responsible for timely repair.

5. In case of quality and technical problems within one year (warranty period) after the well is used, Party B shall be responsible for maintenance and solution.

6. Except for the two obligations that Party A shall undertake, Party B shall be responsible for other project matters not included in this contract.

Eight. For matters not covered in this contract, both parties may sign a supplementary contract separately, which has the same effect as this contract.

IX. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.

Party A: Party B:

Date of signing this contract: year month day.

In order to improve the drilling quality, clarify the relationship of responsibilities, rights and interests between Party A and Party B, and achieve the purpose of mutual benefit, Party A and Party B hereby conclude this contract through consultation:

Party A: Owner: Luzhou Tianyuan Packaging Products Co., Ltd.

Party B: Construction Party:

Legal representative:

I. Overview of the Project:

1. Well location: within the factory area of Tianyuan Company.

2. Well structure: industrial water well.

3. Well depth: until the water source is drained.

4. Requirements: After the well is completed, pump water with 8 cm water pipe, and the water source adequacy must reach more than 24 hours. If no water comes out after drilling, Party B shall bear the engineering losses.

Second, the project cost:

1, 100000 yuan. (Ensure adequate water supply)

Three. Party A's responsibilities:

1. unconditionally provide Party B with water and electricity for construction.

Four. Party B's responsibilities:

1, responsible for ensuring the engineering quality.

2, responsible for drilling must use 160 pipeline for construction.

3. Be responsible for equipment transportation and wellhead installation.

4. Safety responsibility: Party B shall be responsible for the construction personnel, equipment and production safety.

Verb (abbreviation of verb) supplementary clause:

1. This contract is signed by the representatives of both parties and takes effect on the same day, with legal effect. After the completion of well drilling, Party A will automatically cancel it after paying all the expenses of the project.

2. This contract is made in duplicate, with each party holding one copy. Other matters not covered shall be settled by both parties through consultation.

Party A: Party B:

Representative: representative:

Tel: _ _ _ _ _ Tel: _ _ _ _ _ _

date month year

Employer (Party A):

Employer (Party B):

In order to solve the problem of office and domestic water, Party A newly drilled a deep water well of about 150m. Party B is now entrusted with the construction. In order to ensure the quality and quantity of the project to be completed on schedule, this contract is signed through full consultation between both parties.

I. Overview of the Project

1, project name: deep water well project

2. Project location:

3. Project content and contract scope: drilling, well pipe installation, gravel pouring, hole sealing, well cementing, pump body installation, pumping, water quantity and water temperature detection.

Second, the preparation before construction

1. Both parties shall determine the well location before construction.

2. Discharge of electricity, water and mud for Party B's construction.

3. Party A and Party B * * * agree to start construction on June 30th, 20xx and complete it on July 2nd, 20xx.

4. Party B shall not subcontract or contract this project to a third party for construction.

Three. Project scope and completion standards

1. The drilling project in this contract shall be contracted by Party B in the form of contract works and materials, and all the construction facilities, tools and personnel required for the project shall be borne by Party B. Party B shall have the qualification recognized by the construction project.

2. The project referred to in this contract is: borehole diameter ≧600mm, reinforced concrete welded pipe around the well (length 4m× inner diameter 300mm).

3. Within three days after the completion of the well, Party A and Party B shall go to the construction site for acceptance, and the verticality of the well shall be subject to the fact that the head of the three-inch submersible pump can be smoothly lowered to the bottom of the well.

(1) The unit price of the project is 500 yuan per meter. The latest mode of drilling contract.

(2) Party B shall charge according to the drilling footage and the actual drilling depth, and pay it 10 day after Party B issues an invoice after passing the acceptance.

(3) Party B shall bear the cost of water, electricity and oil for drilling.

Fourth, the completion acceptance

1, acceptance by sections (including well depth, pipe laying diameter and filler). The signatures of Party A and Party B and relevant departments shall be used as the basis for acceptance.

2. The drilling depth should be measured and used as evidence of settlement.

Verb (abbreviation for verb) Other matters

1. Party B shall ensure that the water output of completion reaches ≧10-15t/hour. If the water output is less than10t/h, Party A shall pay 50% of the single well project cost.

2. During the construction period, Party B shall pay attention to safe construction. In case of casualty accident, Party B shall bear all casualty expenses.

3. After Party B transports the drilling equipment to the construction site, the construction period may be postponed due to power failure and force majeure caused by human factors.

4. Other matters shall be settled by both parties through consultation on the principle of not affecting the construction period.

This contract is made in quadruplicate, with each party holding two copies. This contract shall come into effect after being signed and sealed by both parties.

Party A (official seal): Party B (official seal):

Legal representative:

Authorized customer: authorized customer:

Date of signature: * * year, month and day.

Article 7 of the drilling contract Party A:

Party B:

Through equal consultation, Party A and Party B reach the following terms on the matter that Party A entrusts Party B to drill wells:

I. Project Location: xx City, xx Province

Two. Duration requirements: the duration is 20xx years to 20xx years, with calendar days.

III. Project and related requirements:

1. construction project: when you look at the water well, the actual number of meters underground is not less than 150m.

2. Specification of well pipe: inner diameter is 286mm, outer diameter is 350mm, and length is 8000mm, so as to ensure smooth movement of submersible pump.

3. Material selection: the pipeline is welded cement pipe, and the filter material must be screened rice stone mixed with coarse sand.

4. Requirements of the well fort: it must be firm and flat.

5. Technical requirements: Ensure that the water output and sediment concentration meet the national standards in Code for Construction of Motor Wells.

Fourth, the project price:

1, the unit price per meter of well drilling is RMB, and the total price is subject to the actual depth of well drilling (meters of pipe running).

2. The unit price and total price are the expenses paid by Party A to Party B, including all expenses such as main materials, auxiliary materials, labor, transportation fees and taxes. In addition, Party A will not pay any fees to Party B. ..

Verb (abbreviation of verb) payment method: After the project is completed and accepted by Party A, Party A pays 90% of the total price to Party B, and reserves 10% of the total price as a quality guarantee, which will be paid one year later.

Obligations undertaken by Party A for intransitive verbs:

1, arrange the site required for construction and dig the reservoir in time.

2. Ensure the water and electricity supply required for the construction and bear the expenses.

Seven. Obligations undertaken by Party B:

1. Organize the construction according to the national construction specifications for motor wells, and be responsible for the exploration work and related facilities required for drilling.

2. To ensure the safe construction, Party B shall take full responsibility for all accidents such as casualties caused by violation of operating rules.

3. After well washing and dredging, ensure that the well depth is not less than 150m.

4. Party B shall be responsible for timely repairing the abandoned wells, collapses, non-effluent or unqualified effluent caused by quality problems.

5. If there are quality and technical problems within one year (warranty period) after the tube well is used, Party B shall be responsible for free maintenance and solution.

6. Except for the two obligations that Party A shall undertake, Party B shall be responsible for other project matters not included in this contract.

Eight. For matters not covered in this contract, both parties may sign a supplementary contract separately, which has the same effect as this contract.

Nine. This contract is made in quadruplicate, two for each party, and shall come into effect as of the date of signature.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _