Wen Yi model employer (Party A) of steel structure contract safety agreement:
Contractor (Party B):
Party A entrusts the renovation project of bicycle shed to Party B for construction. In accordance with the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, and following the principles of equality, voluntariness, fairness and good faith, Party A and Party B reach an agreement on this project, and hereby sign this contract, the contents of which are as follows:
Article 1: Project Content and Contract Scope
1, project content:
2. Scope of contract:
Article 2: Contract Price and Method
1. Contract price: calculated as per square meter 120 yuan, and calculated as per square meter 200 yuan for bicycle shed, without invoice and any extra expenses.
2. Contracting method: quantity and material contracting is adopted according to the project content.
Article 3: Time limit requirements
The duration of this contract is 20 days, and the commencement date is subject to the visa of Party A after foundation pouring.
Article 4: Payment and settlement of project funds
Project cost yuan; Steel structure members of carport; The ground contains earthwork excavation, concrete and smooth surface elements. The total project cost is RMB, including RMB for steel structure and RMB for bricklayer. Pay the full amount after the bricklayer's project is completed, pay 95% after the steel structure is qualified, keep 5% as the quality deposit, and pay the balance without quality problems within one year.
Article 5: Project Quality
1. The quality of this project must conform to the specifications, industry standards and steel structure acceptance standards, and the quality level is qualified.
2. If the quality is unqualified, it must be reworked according to the requirements of Party A, and the cost of rework shall be borne by Party B, and the construction period shall not be extended.
3. Party B shall establish a complete quality inspection system, do a good job of self-inspection, and make timely rectification when problems are found.
Article 6: Safe production and civilized construction
Party B must take strict and scientific safety protection measures to carry out civilized construction, ensure construction safety, receive safety education and abide by safety production regulations. If Party B fails to perform the above obligations, resulting in property losses and personal injuries to construction workers or third parties, Party B shall bear the responsibilities and expenses arising therefrom.
Article 7: Obligations of both parties
1. Party A's responsibilities:
(1) is responsible for on-site coordination, management, supervision and inspection of project quality, safety and civilized production.
(2) According to the contract, Party A's project audit shall pay the project payment in time.
2. Party B's responsibilities:
(1) Party B shall, in accordance with the scope and requirements of the contract, complete the specified project contents with good quality and quantity on schedule.
(2) Party B must obey the command of Party A's management personnel, carry out the construction according to the safety technical specifications, and meet the acceptance standards promulgated by the state. In case of violation, the engineer has the right to propose to stop work or be responsible for Party B's rework.
If there are serious problems in the project quality and construction period, or Party A fails to make rectification for many times, Party A may terminate the contract and entrust others to carry out the construction, and Party B shall be responsible for the losses caused thereby.
(3) During the construction period, Party B shall promptly clean up the construction waste to the place designated by Party A to keep the site clean and tidy. Before the project is completed and accepted and handed over, the site should be carefully cleaned so as to clean up the site after work.
Article 8: Project Acceptance
1. If Party B thinks that the project has the conditions for completion acceptance, it shall notify Party A for acceptance.
2. Party A shall organize the project acceptance within the agreed time after receiving the notice. If the site does not meet the qualification requirements or the site is not cleaned up, Party A will put forward rectification opinions and organize acceptance after rectification.
Article 9: Warranty Period and Final Settlement
This project is based on honesty. During the warranty period (calculated from the date of completion acceptance), Party B will earnestly perform its responsibilities. Thoughtful service, on call, to ensure the quality of warranty. If Party B does not cooperate, Party A has the right to ask others to repair it on its behalf, and the expenses shall be borne by Party B. ..
Article 10: supplementary provisions
1. Matters not covered in this contract shall be settled by both parties through consultation. In case of serious differences, both parties shall sign a supplementary agreement.
2. This contract is made in quadruplicate, three for Party A and one for Party B. It shall come into effect after being signed and sealed by both parties. After the contract comes into effect, the project balance will be paid off and the warranty period will automatically terminate.
Signature of Party A: Signature of Party B:
Xx year month day
Article 2 Safety Agreement for Steel Structure Contracting Mode Party A: Party B:
According to the house demolition method negotiated by Party A and Party B, the following agreement is reached on the sale of entrusted demolition of Hanhai Taiyuan:
First, the scope of sales:
2. Due to the widening of the North Ring Road, our company is entrusted by Hanhai Taiyuan to sell to Party B the dismantled steel structure housing of Hanhai Taiyuan Sales Department, including all the steel products of Hanhai Taiyuan Sales Department approved by Party A through negotiation.
Three. Total contract price:
The contract price is: 4. Demolition requirements:
Total duration of demolition: calendar days.
Demolition date: 20 10 to 20 10.
Dismantle according to Party A's requirements. Office supplies, doors, tables and chairs, decorations, carpets, lamps, solid wood floors, sculptures, etc. required by Party A shall be dismantled by Party A, and the rest shall be owned by Party B. V. Rights and obligations of both parties:
1. Party A is responsible for the on-site organization and coordination of Party B;
2. Party A is responsible for the management and coordination of site demolition;
3. Party B shall be responsible for removing the garbage generated during the on-site construction to the off-site and bear the corresponding expenses;
4. Party B shall avoid potential accidents during construction. If an accident is caused by Party B, Party B shall bear relevant responsibilities and losses;
Payment method of intransitive verbs:
On the date of signing this contract, Party B shall pay a deposit of RMB 20,000.00 Yuan to Party A; The remaining RMB one hundred and forty thousand Yuan only shall be paid in one lump sum before Party B's personnel enter the site to start construction.
This agreement is made in duplicate and shall come into force as of the date of signature by both parties.
Party A: (Seal) Authorized Agent: (Signature) Tel: MM DD YY.
Party B: (Seal) Authorized Agent: (Signature) Tel: MM DD YY.
Model safety agreement of Party A, steel structure contractor:
Party B:
1. According to the Contract Law and relevant national standards, Party A and Party B, based on the principles of fairness, reasonableness and mutual benefit, signed the following terms through friendly negotiation:
1, project name:
2. Project location:
Second, the project scope and construction content:
1. Scope of work: civil engineering and steel roof engineering within the scope shown in the construction drawing provided by Party A. ..
2. Construction content: All the nodes shown in the drawings and the requirements for answering questions in the bidding documents and drawings shall be implemented.
Third, the technical conditions
Party A shall provide the construction drawings, which shall be implemented in accordance with the bidding documents, Q&A and construction contract specifications.
Fourth, the price:
The total contract price is 9.8 million yuan.
In words: RMB: nine million eight hundred thousand yuan.
Verb (abbreviation of verb) payment terms
65,438+00% in advance after signing the contract: RMB will be paid after the steel structure column enters the site. After the formal installation of the project, the relevant payment methods will be implemented in accordance with the contract between Party A and the owner.
The responsibilities of both parties of intransitive verbs:
1. Party A's responsibilities:
(1) Before Party B's construction, Party A shall provide the approved construction drawings, and provide the qualified civil bearing surface, pop up the axis, confirm the elevation, and the construction site has the construction conditions.
2. Party B's responsibilities:
(1) Party B shall construct in strict accordance with the overall design requirements.
(2) Party B shall strictly abide by JGJ7-9 1 and GB 50205-200 1, and all materials shall meet the design requirements and relevant national standards and specifications.
(3) Party B shall provide qualified products, and the materials, specifications and brands must meet the requirements of the owner.
(4) Party B shall guarantee the construction period and civilized construction, and the project manager must coordinate all matters at the construction site. During the construction, Party B shall be responsible for the accidents caused by Party B.. ..
Seven, time limit for a project:
Party B must complete the fabrication and installation of the ground floor including civil works within 70 days of the effective working day, with a fine of 2,000 yuan for one day exceeding and a reward of 65,438 yuan+0,000 yuan for one day in advance.
Eight: rewards and punishments
1. Party A breaches the contract.
(1) If Party A fails to pay the project payment as agreed in the contract, which leads to the impossibility of construction, it shall be implemented according to Paragraph 4 of Article 26 of the General Conditions.
(2) If Party A fails to pay the settlement price for project completion without justifiable reasons, the general terms and conditions shall prevail.
Paragraph 3 of Article 33 has been implemented.
(3) Party A's failure to perform the contractual obligations causes economic losses to the contractor, the construction period is postponed, and Party B is compensated for the breach of contract.
2. Party B violates this contract.
(1) If Party B fails to complete the project according to the completion date agreed in the agreement or the extension of the construction period agreed by the engineer, it shall be implemented according to paragraph 2 of General Conditions 14.
(2) If the project quality is not up to standard due to Party B's reasons, it shall be implemented according to Article 15 1.
(3) When Party B fails to perform its contractual obligations or fails to perform its obligations according to the terms agreed in the main contract, Party A has the right to deduct the performance bond of Party B..
Nine: accept
After Party B's installation is completed, Party A shall organize relevant units to conduct acceptance inspection according to JGJ7-9 1 and JGJ78-9 1 within 7 days, otherwise it will be deemed as qualified.
X. others
1. This contract is made in quadruplicate, with Party A and Party B holding two copies respectively.
2. Matters not covered shall be settled through negotiation.
3. If both parties disagree with the terms of the contract, the contract signed by Party A and the owner shall prevail.
4. Party A is responsible for supervising the whole process of purchasing colored steel plates and profiles, and has the final decision.
5. Party B shall not default on the wages of migrant workers. If Party A is in arrears, Party B has the right to deduct the deposit and delay the payment of project funds to Party B. ..