The same is construction. The difference between people and bees is that the construction of bees is a reflection of instinct, and before construction, people will form ideas and frameworks in their minds. Therefore, if we compare home improvement to a battle, then the preliminary design of home improvement is the "battle plan" of this battle and the "soul bond" of home improvement.
In the early design, friends must do one thing, that is, make a detailed measurement of their rooms. Don't be lazy, you'd better measure yourself. The measurement contents mainly include:
1. Define the areas involved in the renovation process. Especially tile area, wall paint area, wallpaper area and floor area;
2, clear the bearing wall size. Especially it is necessary to design the wall size of furniture in the future.
(two) the main body is removed or changed.
When entering the construction stage, the main body removal is the first project, which mainly includes wall removal, wall building, wall skin removal, heating removal, plastic steel window replacement and so on. To put it bluntly, the main body demolition is to put up the framework of the construction site first.
(3) Hydropower transformation
Before the water circuit reform, the main structure should be basically completed. Between hydropower transformation and main demolition, some suggestions are put forward on the location of water inlet and socket on the range hood reserved by the developer. Mainly includes:
1, to see whether the position of the lampblack machine socket affects the installation of lampblack machine in the future;
2. See if the location of the water meter is appropriate;
3. See if the location of the water inlet is convenient for installing the sink in the future.
The first measurement of cabinets can be done by experienced friends themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately. The kitchen generally doesn't need to be waterproof.