Introduction of Tianshui Railway Station Construction Project?

Tianshui Railway Station was built in 34 years (1945) and opened to traffic in 37 years (1948). It was the last railway station built by the government of the Republic of China on the mainland at that time, and it was also the westernmost railway station.

Tianshui Railway Station is a station on the Longhai Railway, which shoulders the task of getting on and off a large number of tourists every year. Under the jurisdiction of lanzhou railway administration, it is now a first-class station.

The development of history

Tianshui River Railway Station started construction in 34 years (1945) and was completed and opened to traffic in 37 years (1948). It was the last railway station built by the government of the Republic of China on the mainland at that time, and it was also the westernmost railway station.

Tianshui Railway Station was built mainly to complete the construction of the Longhai Line proposed by Dr. Sun Yat-sen in his industrial plan. Dr. Sun Yat-sen's plan to build the Longhai Line to the west of Tianshui, but the railway to the west was not built because the National Government was in jeopardy in 1948 (one year after the People's Liberation Army entered Tianshui, that is,1August 949).

1In August, 949, the railway station was taken over by the People's Liberation Army. 1952, rebuilt and opened to traffic.

1984 was electrified,/kloc-0 was completed and put into use in June 1989, and/kloc-0 was upgraded to a first-class station in February 1990. The building area is 3,800 square meters, and the actual completed area is 56 14 square meters. The new station building faces Maiji District (formerly known as Beidaobu) and has an offline structure. In order to cooperate with urban planning, asymmetric buildings are adopted and a bell tower with a height of 48 meters is set up.

Station scale

Tianshui River Railway Station has 10 arrival and departure lines and 9 shunting marshalling lines, and the traffic signal adopts 6502 centralized control equipment. Railway freight loading and unloading line, enterprise factory and mine special line, army special line 14. Freight yard10.2 million square meters, 7 warehouses and 2 freight loading and unloading business buildings, with micro-mechanism ticket charging to handle the arrival and delivery of vehicles, LTL and containers.

Business scope of Tianshui Railway Station

Passenger transport: handling passengers getting on and off; Check luggage and parcels.

Freight transportation: handling the delivery of whole vehicles, LTL and container goods; Handling the storage of the whole vehicle before the goods are transported; Do not handle the delivery of canned dangerous goods.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.