The project cost consulting enterprise qualification is valid for ()

The validity period of the qualification of engineering cost consulting enterprises is generally 3 years.

Duration:

The qualification of engineering cost consultation has a time limit, generally 3 years.

If the qualification expires and it is necessary to continue to engage in engineering cost consulting activities, an application for qualification renewal shall be submitted to the qualification licensing authority 30 days before the expiration of the qualification validity period. The qualification licensing organ shall make a decision on whether to approve the extension according to the application. If the extension is granted, the validity period of qualification shall be extended for 3 years.

Second, Grade B qualification

1. Among enterprise investors, the number of registered cost engineers shall not be less than 60% of the total number of investors, and their capital contribution shall not be less than 60% of the total registered capital.

2. The technical director has obtained the registration certificate of cost engineer, has the senior professional title of engineering or engineering economy, and has been engaged in the professional work of engineering cost for more than 10 years.

3, full-time professionals not less than 12 people, among them, there are not less than 8 people with intermediate titles in engineering or engineering economics, and there are not less than 6 people who have obtained the registration certificate of cost engineer, and other people have the qualification certificate of cost engineer.

Industrial advantages, resource allocation, and occupation at both ends;

1, industrial advantages

With the qualification guarantee, in addition to the qualification guarantee, there is also a double 60% guarantee, which makes the cost engineer have an important position in the engineering cost consulting industry.

There are technical barriers, over 60? Cumulative quota, as well as infrastructure financial management regulations and projects? Calculation rules, list pricing specifications, etc. All constitute? The threshold is higher.

Step 2 Configure resources

Follow the capital? The flow of people and population flows in two lines. The State Council and the CPC Central Committee put forward the regional development war of Guangdong-Hong Kong-Macao Greater Bay Area, xiong'an new area, Yangtze River Economic Belt, Central Urban Agglomeration, Chengdu-Chongqing Economic Circle and the construction of new socialist countryside? . State capital? And the population will inevitably flow to these areas.

3. Occupy both ends of the smile curve.

The front end of the smile curve of engineering cost and even engineering consultation is feasibility study and design, and the back end is operation and maintenance, all of which are high. Moisten the area. Do you want to stabilize the middle end of the existing business focus before sending it to the front end and back end? .