Public participation information of environmental impact assessment of medical core area construction project in Dali Prefecture Hospital was first publicized.

According to the Measures for Public Participation in Environmental Impact Assessment (Decree No.4), Dali Medical Investment Management Co., Ltd. entrusted Yunnan Hu Bai Environmental Protection Technology Co., Ltd. to conduct an environmental impact assessment on the "Dali Bai Autonomous Prefecture People's Hospital Medical Core Area Construction Project". Now, the implementation of this project will be publicized to let the public know about this project, and at the same time, the public's attitude towards this project, opinions and suggestions on environmental protection will be collected, and they will be supervised by all the public.

I. Overview of the Project

Project Name: Construction Project of Medical Core Area of Dali Bai Autonomous Prefecture People's Hospital

Architectural nature: new building

Construction site: No.22 Renmin South Road, Xiaguan Town, Dali City (former site of Dali Health School, Yunnan Province)

Construction content and scale:

Dali Bai Autonomous Prefecture People's Hospital was founded in 194 1, located at No.35 Renmin South Road, Dali City, Yunnan Province. It is a three-level first-class general hospital integrating medical treatment, teaching and scientific research.

In order to optimize the allocation of medical and health resources in Dali in an all-round way and provide better medical and health services for people of all ethnic groups in the whole state, under the guidance of the general requirements of "basing on the present, focusing on the long-term, scientific planning and rational layout" of the state committee and government, according to the urban planning, it is planned to build the medical core area of Dali Bai Autonomous Prefecture People's Hospital at No.22 Renmin South Road, Xiaguan Town, Dali City (the former site of Dali Health School, Yunnan Province). With the goal of building a leading hospital in western Yunnan Medical Center with "first-class environment, first-class technology, first-class equipment, first-class management and first-class service", and according to the basic design concept of unified planning, reasonable layout, clear division of labor, convenient transportation, convenient management, controllable operation and sustainable development, we will build an energy-saving, intelligent and ecological third-class general hospital.

The total land area of the hospital is 78,493.73 square meters (1 17.74 mu), and there is a general practitioner training base in the land, with a total construction area of11square meter. This project plans to build the core parts of hospitals such as emergency center, outpatient department, inpatient department, medical technology center, critical care medical technology center, scientific research department and conference center, with a total construction area of about 320,000 square meters and a total design of 2,000 beds. It is planned to start construction in February 20 19, and it will be completed and put into use after 3-5 years of construction.

Second, the name and contact information of the construction unit

Dali zhouyitou management co., ltd

Contact: Luo Yuhang

Address: No.22, Renmin South Road, Dali City, Dali Bai Autonomous Prefecture, Yunnan Province (5th Floor, State Hospital Administration Office Building)

E-mail: dlzytgs @126.com.

3. Name and contact information of the environmental impact assessment agency?

Yunnan Hu Bai Environmental Protection Technology Co., Ltd.

Contact: Fan Lizhi

Address: No.0/66, Qianfu Road, Xishan District, Kunming, Yunnan.

Postal code: 650034

Four. Working procedures and contents of environmental impact assessment

The working procedure of environmental impact assessment is roughly divided into three stages: the first stage is the preparation stage, collecting relevant documents, publicizing the first environmental impact assessment and conducting preliminary field investigation; The second stage is the formal work stage, further engineering analysis and environmental status investigation, as well as some environmental impact prediction and evaluation; The third stage is the report preparation stage. The main work is to summarize and analyze all kinds of information and data obtained in the second stage, give conclusions and complete the preparation of environmental impact report documents.

The main contents of the environmental impact assessment of this project include: through on-site investigation and current situation monitoring, grasp the current situation of environmental quality and major environmental problems in the project construction area; Through engineering analysis, the pollution characteristics of the project are demonstrated and the emission of main pollutants of the project is calculated. Predict and analyze the scope and extent of the possible pollution impact of this project on the local environment, and then put forward the countermeasures for further pollution prevention and control; From the point of view of environmental protection, the feasibility of engineering project construction is clarified, which provides scientific basis for decision-making by higher authorities and environmental management departments, environmental management by construction units and optimization of specific project design by design units.

Verb (the abbreviation of verb) is the main problem of soliciting public opinions

Mainly solicit public opinions and suggestions on the environmental impact, pollution prevention measures, site selection and other environmental protection aspects of this project.

Six, the main way of public opinion.

After the information is publicized, the public can download the "Public Opinion Form" to fill in, and give feedback on opinions and suggestions by e-mail and letter. , or directly contact the construction unit or environmental impact assessment unit by telephone or interview. Express opinions and opinions on the project and environmental impact assessment. Please leave your name, address and effective contact information for a return visit if necessary.

Seven. Time limit for public comments

From the date of this public announcement to the completion of the first draft of the environmental impact report of this project, the public can put forward opinions related to environmental impact assessment to the construction unit.