I want to decorate my house, with a building area of 9 1, 2 bedrooms and 2 living rooms, 1 kitchen, 1 bathroom. What are the precautions? Thank you!

1. Don't finish the partition of the shoe cabinet, leave some space for the ash of the shoes to leak to the bottom floor, and install lights above the sink and gas stove. When determining the location of the bathroom floor drain, we must first think about it and measure the size. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point no matter how inclined the brick is. s 5547588 r 5547 p 1 105-yazfk 0d 1

There is no design switch for the air conditioning socket in the bathroom. Especially for the electric water heater in the bathroom, it is advisable to use a plug two-stage switch. If you want to turn off the electric heater, it is dangerous to unplug it.

3. In the final analysis, the external corner treatment of brick still depends on the level of workers. If the bricklayer is good and the tools for grinding ceramic tiles are better, you should not hesitate to choose the method of grinding 45 degrees. In terms of effect, as long as the grinding is good, grinding the outer angle of 45 degrees is the most beautiful! If the level of workers is really not good, then you'd better choose to use an angle ruler, because the bad 45-degree angle grinding method is not as good as using an angle ruler.

It is also important to test the pressure after the water pipes are arranged. Everyone must be present during the test, and the test time should be at least 30 minutes, preferably 1 hour if conditions permit. 10 kg pressure, and finally passed the test without reducing energy.

5. When installing the plastic-steel door, be sure to calculate the size of the plastic-steel door frame protruding from the wall surface and inform the installer, so that the final door frame and the tiled wall surface are flat, beautiful and sanitary.

6. The carpenter's doorcase and the bricklayer's tiling should also be coordinated. When wrapping the door cover, you should consider whether the ground below (either side of the ground on both sides of the door) should be leveled with ceramic tiles or other cement mortar, because if the door cover is nailed before tiling, it will be wrapped all the way to the ground. When cement is used in the future, if the cement and the door cover are stained, it will lead to water absorption and mildew of the door cover wood.

7. The bottom of the mattress and the bedplate must be breathable. Generally, it is best to use fir boards as bed boards.

8. Try to use paper tape when drawing.

9. Pay attention when buying lamps: generally try to use glass, stainless steel, copper or wood (shelves). Generally don't buy any iron with other coatings and paints on it, which is easy to fade.

10. The washbasin should use ceramic basin as far as possible, and the glass basin is difficult to clean.

1 1. Hydropower reconstruction should be planned by themselves, and they are required to drive in a straight line. I watched them draw their own lines, and they all followed them. You must personally check and accept every project.

2. Waterproofing must be done well, and water must be tried.

13. Many verbal agreements in the construction have become a gap that has been slaughtered during the checkout, so it must be written in black and white, and the increased or decreased project price must be clearly asked and written.

4. If the floor is installed on the ground, the ground should be re-cemented and leveled.

15. For the kitchen door, it is best to use a carpenter who wants to decorate it into a wooden rail door.

16. Install as many power plugs as possible in the living room.

17. There is a partition outside the shower in the bathroom. You can't save yourself by pulling the shower curtain. Actually, it was very inconvenient, and the water spilled all over the floor.

8. The materials of doors and doorframes should be fine-grained materials.

19. Make sure that your waterway is OK before installing the cabinet.

20. Don't choose white for kitchen and bathroom floor tiles.

2 1. The ceiling should pay special attention to leveling putty before plastering Dulux.

22. Don't have too many lights in the living room, it's better to be concise, otherwise it will be like a lamp shop! ! !

23. Buy things that need to be installed and try to install the goods. It really doesn't include installation. After installation, you must insist on paying the full amount! !

24. When decorating, bring the business cards of the manufacturers and merchants you collected before.

25. It is best to remove the protective film of aluminum gusset plate before installation.

26. It is best to use shutter doors for shoe cabinets to prevent odor. A socket can be left next to the shoe cabinet for inserting and airing shoes.

27. A small lamp can be installed in the place where vegetables are cut.

If it is convenient, the restaurant can also install an exhaust fan, so that when eating hot pot or barbecue, the ceiling of the hall will not be dirty.

29. It's best to arrange a cabinet for sundries at the door, which can be placed on the shoe cabinet. It is convenient to put common things there, such as umbrellas, bags, scissors, change, medicines and so on.

20. Don't choose white for kitchen and bathroom floor tiles.

30. There is absolutely no need to use expensive smallpox. If you are not too worried about humidity and lampblack, it is recommended to brush waterproof paint with moisture-proof gypsum board, which is very beautiful. If you must use aluminum gusset ceiling, I suggest 1, not too expensive. 2. Use solid colors, especially the kitchen ceiling. Pure white will do. Unless the color matches the decoration style, it is easy to be out of harmony. Make up your mind and don't trust the eyes that sell the ceiling. Their eyes are really corny. 4, staring at the scene, it is very important to close the edge, don't let them be sloppy, or leave a black seam, which is ugly.

3 1. Third, if you need to punch holes, continue to stick tiles, and the exhaust holes of range hoods and water heaters should be pre-punched. It's inconvenient to wait until the tile is pasted. Therefore, before the renovation, you must choose the range hood, cooker and water heater to determine the size of the hole.

32. Considering that the customized cabinets are beautiful, but not durable, after synthesizing the opinions and experiences of some students on the Internet, the floor cabinets are made of cement, with ceramic tiles inside and outside, marble countertops, hanging cabinets and cabinet doors made of wood. The cabinets made by this method are durable and moisture-proof. And it doesn't cost much Many neighbors said yes, I didn't blow it.

33. After making the door cover, the plasterer began to install plaster lines and paint the walls. The wall of my house was originally flat, and 2-3 roads could be approved. When approving the ash, it is to polish it once, then brush the primer, polish it again after brushing, and finally brush the top coat twice with ICI. The whole wall looks smooth and flat, which is really good. After the wall smallpox project was completed, the carpenter began to make wardrobes. The wardrobe is made of 18cm Ye Wei brand core board with decorative board outside. Although it is not as beautiful as the furniture store, it is durable and the quality should be better than the one bought. I'm not afraid to stand on the board of the cabinet. I'm afraid not. The backboard is also thick, and I bought it very thin.

34. Other students must pay attention to the following points when pasting tiles: ① It is best to be on site; ② Some imperfect tiles can be pasted by workers in some invisible places in the future, such as cabinets, sinks and mirrors. Be careful not to let workers paste them in the above positions, otherwise nothing will be seen in the future and money will be wasted. (3) Before the wall brick and floor tile are pasted, the soaking time must be enough. (4) Be sure to block the floor drain with something to prevent the cement from falling and blocking. The floor drain in my house is blocked by falling cement. Looking for the management office to clear 30 doors and get a lot of mud. ⑤ Workers will not waste too many tiles when people are on site. My family wasn't there when I put up the tiles. Later, when I went to see them, a lot of bricks were wasted, which was very painful. All sweat and rice.

35. Length and height of the wall. If a bathroom has four walls, the length and height of each wall should be measured. Then deduct the area of a window and door. Finally, calculate the area of the ground. After you have measured your size, you can also take it to the shop selling tiles, and they will help you satisfy it again. Just add a 5% loss.

36. It is best to control the ceiling lamp in the bedroom, one by the door and the other by the bed, so as to avoid lying in bed and turning off the lights in winter.

37. The location, height and spacing of sockets must be calculated. Occasionally, the position of the card holder was hit by steel bars first, and then the card holder was found to be blocked by TV cabinets, microwave ovens and desks, so we had to move the position of the first two pieces of furniture higher. Finally, it is found that not only the height is not ergonomic, but also the stainless steel cabinet feet can't be bought properly, so we can only order aluminum feet.

Just install a light at the corner of the aisle, which is bright and effective.

39. I didn't consider the position of the dining table when I installed the lamp. Now the light is not in the middle of the table.

40. Don't use bathroom tiles in Tai Su. First, it is easy to get dirty, and second, it is too dull after a long time!

4 1. More sockets should be installed, furniture should be bought outside, the floor should be dirt-resistant and safe, the model rooms should be seen more, and the principle should be adhered to.

42. There is no need to buy expensive aluminum gusset plates. Very cheap aluminum gusset plate is far superior to PVC, and no matter how much it costs, there is no obvious difference. Pay special attention to the keel rather than the aluminum gusset itself when buying aluminum gusset plates (the goal of aluminum gusset plates is too big to be easily tampered with), and tricks are often played on the keel.

3. It is difficult to find a floor tile with satisfactory color, so I didn't find it. However, two unsatisfactory colors can be staggered and then turned at a 45-degree angle to achieve satisfactory results. This is a good suggestion made by the bricklayer himself.

44. If you hit the cabinet on the top of the balcony, add a layer of foam plastic board behind the cabinet, which has a very good heat insulation and waterproof effect. It is best to use fire-proof boards for balcony doors. The environment of the balcony is relatively poor.

45. If there is no suitable wood thread, it may be customized. The customized quality seems to be better than the sample. And customization is more personalized.

46. The stainless steel feet of bathroom cabinets are profiteering. Find some places on the back of the store and buy them at crazy prices.

47. When installing the door lock, you should pay attention to some wax on the lock tongue. If it is damaged, it will be too late to wax it. If there is no door suction, pay attention to prevent the handle from hitting the wall and being damaged.

Do not install door trash cans and countertop trash cans. Opening the cupboard door in summer will stink. You'd better put the trash can outside.

65. The small cupboard near the dining table is nice, and it is convenient to put something.

66. Personally, the performance requirements of mop bucket are not high. You can build one by yourself, laying tiles or mosaics to match the surrounding environment, which is both beautiful and economical.

67. The bathroom can be hung with hooks.

68. The bathroom is designed with a small cupboard for clothes, so you don't have to worry about forgetting to take clean clothes when taking a shower.

69. The belt drying of washing machine is seriously unrealistic, except for the only yellow mildew day in a year. Thick clothes and bath towels are still wet, just let the sun sterilize them. I'm overdrawn and need to deposit some money.

70. I made a laundry pool in the laundry room to wash some things by hand. I thought I used it less, so I bought a cheap terry faucet. I didn't expect this washbasin to be so convenient that it became the most commonly used washroom in my home. What rags, socks and floor towels are all washed inside, and even hand washing is mostly there.

7 1. Lighting strips are really not practical. It hasn't been opened since the renovation. Lights up when guests come. I forgot to install this thing myself. I wanted to have a romantic party, but now there are not many opportunities to turn on the spotlights.

72. The biggest lesson is that the simpler the decoration, the better, less pollution, less money and peace of mind.

73. Practical things:

① A storage room with reasonable design.

(2) A sink for washing dirt on the north balcony. It is different from the washbasin in the bathroom and the bucket for washing vegetables and dishes in the kitchen.

(3) You can pull the faucet to wash your hair in the bathroom. TX, who never washes her hair in the basin, is an exception.

(4) Easy-to-clean floor and suitable cleaning tools.

(5) Kitchen countertop work light.

74. When you buy a toilet, you must measure your hole spacing. Otherwise, it really is ...

75. It is best to measure the elevation of the kitchen floor tiles before they are dried to see if the lowest point is a floor drain, or if they are squabbled with the decoration team after drying, many cells will die.

76. The nacrite of the Great Wall used for the window sill is made of 800X800 tiles. Manufacturers cut and grind the edges, and masons stick them together. Nice pattern. It hasn't radiated yet.

77. The shower room in the bathroom must be large enough to use transparent glass, so that bathing in it will not be cramped.

78. Tile jointing should not use white cement jointing. In less than a month, it turned into a black seam, which was ugly. As a result, I bought a sealant and hooked it myself. I was tired.

79. There should be boards under the artificial stone in the cupboard. Results It was found after installation. Now I dare not cut meat on it. I promised to fix it for almost two months, but I haven't installed it (only once).

80. Don't believe the designer's bewitch. Of course, you can visit several decoration companies and extract something really useful from each design. The key is what you want to dress up as.

8 1. If the original developer of the floor drain has installed that "bowl", don't take it out.

82. Try the water after the tile on the bathroom floor is pasted, and rework it as soon as the running water slows down. The running water in my house was very slow, and my heart softened at that time. There is always a little water in the shower now, which makes the shower nozzle of our main defender idle for hundreds of dollars. Now I've been thinking about how to remedy it.

83. When installing the wash basin, we should consider the relative position with the mirror, the shelf for putting the toothbrush cup and the towel rack.

84. When buying a mirror, you should consider the position of the mirror headlights. If you don't want to install the reflector headlight for the time being, the size of the reflector should be able to cover the reserved line of the reflector headlight.

85. Make a small cabinet on the balcony where the washing machine is placed, which is convenient for putting some sundries, such as those in washing powder. Beautiful and practical.

86 .. Be sure to pay attention to the upstairs to make it waterproof ... or it will drip down upstairs and make the hanging cabinets and walls messy. .........

87. Don't blindly follow the trend of online group buying. Later, it was found that some people would bargain cheaper than group buying.

88. There must be more sockets on the TV background wall. Once the TV and DVD are installed, you will find that the socket is not enough.

89. Before changing the waterway, it is necessary to consider the details of the washbasin installed in the future, such as whether it is the left basin or the right basin, and where the inlet and outlet should be located. Otherwise, after changing it, I found that the washbasin of the photo could not hold it!

As for curtains, you'd better keep a copy of that size for yourself and explain to the boss that we can't reduce the size. If it's gone, what's going on? Or watch him cut the cloth himself.

9 1. Decoration construction process:

1, enter the site and tear down the wall to build it.

2. Do a 24-hour closed water test on the bathroom and kitchen floor (the developer needs to complete this task).

3. Trenching, hydropower transformation and acceptance.

4. Buried trunking concealed hydropower renovation project, and waterproof project will be started when there is no leakage in closed water test.

5, bathroom, kitchen wall disk.

6, carpentry comes into play, hanging smallpox, plaster Angle line.

7, door cover, window cover. Make a wooden cabinet frame.

8. At the same time, make all kinds of wooden doors, modeling doors and flat pressing.

9. Brush the board with dust-proof paint (clear oil).

10, leveling and laying of marble countertops on windowsill.

1 1, veneer, thread, hardcover.

12, wall foundation treatment, polishing and leveling.

13, the joints of furniture and doors should be glued (edged).

14, wall oil ICI at least three times.

15, furniture paint enters the site, and the paint is patched.

16, corner treatment, floor tiles, solid wood or composite wood floors, waterproof marble strips, and skirting lines.

17, installation and debugging of lamps, sanitary wares, handles and door locks.

18, cleaning, floor tile joint repair, return.

19, preliminary acceptance within the decoration company.