20 19 Shenzhen Metro Construction Closed Section+Bus Adjustment Information

About the latest road closure and bus adjustment information in Shenzhen, everyone should know about it. After all, this has a lot to do with everyone's travel. This is the relevant information. Remember to take a detour to the right route for bus adjustment.

Traffic Adjustment and Road Closure during the Construction of zhu cun Station of the North Extension Line of Metro Line 4;

1. time

20 19 July 28th to June 24th, 2020 *** 180 days.

2. Roads

Closure construction of Yuzhu Street in Longhua District.

Bypass route

Vehicles passing through this section in the past can pass along Guanlan Avenue or other surrounding roads.

Traffic adjustment during the construction of Shuangyong Street Station of Metro 10 1 Line. Road closure:

1. time

20 19 July 28th to June 24th, 2020 *** 180 days.

2. Roads

Close Shuangyong Street (Pinghu Street intersection to Yu He South Street intersection), Shuangyong Street (Yu He South Street intersection to Xinli Street intersection), Shuangyong Street (Xinli Street intersection to Jingxin North Street intersection) and Shuangyong Street (Jingxin North Street intersection to Fenghuang Avenue intersection) for construction.

Bypass route

Vehicles passing through the above sections should be diverted to Ping Long Road, Shouzhen Street or other surrounding roads.

Second, the road changes direction:

1. time

20 19 July 28th to June 24th, 2020 *** 180 days.

2. Roads

Xinli Street (the intersection of Liyuan Street and Xinyuan Road) in Longgang District has been changed from two-way traffic to one-way traffic from south to north.

Traffic adjustment during subway 12 line and Heping Station project 1 construction. Road closure 1:

1. time

20 19 July 28th to 20 19 September 26th ***60 days.

2. Roads

Songfu Avenue (from Chongqing intersection to Daqiao intersection) is closed for construction.

Bypass route

Vehicles that used to pass this section can be changed to pass along Fuyuan No.1 Road, Yonghe Road or other surrounding roads.

Second, closed roads 2:

1. time

20 19 July 28th to 20 19 September 26th ***60 days.

2. Road closure

Bridges and roads (Fuyuan No.1 intersection to Yonghe intersection) are closed for construction.

Bypass route

Vehicles passing through this section can be diverted to Chongqing Road, Hexiu West Road or other surrounding roads.

Traffic adjustment and road closure during the construction of Xin 'an Park Station of Metro 12 line;

1. time

20 19 July 28th to June 6th, 2020 *** 180 days.

2. Roads

The closed construction of Baonong Lane 1 (Qianjin Lane 1 to Longjiang Lane 2).

Bypass route

Vehicles that used to pass this section can be changed to pass along Xin 'an Second Road, Shenzhen East Road or other surrounding roads.

Traffic Adjustment during the Construction of Baoshilu Station of Metro 13 Line

Road closure:

1. time

July 3 1, 20 19 to June165438+1October 28 * * 120 days.

2. Roads

Construction of Ruyi Road (from the intersection of Baoshi East Road to He Bin North Road) is closed.

Bypass route

Vehicles passing through this section in the past can be changed to pass along Shiyan Avenue, Baoshi South Road or other surrounding roads.

Traffic Adjustment during the Construction of Song Yuan Downstation of Metro Line 4. Road closure:

1. time

201July 9 18 to June 2020 141October *** 180 days.

2. Roads

Close the Guixin intersection of Guanlan Avenue for construction.

Bypass route

Vehicles passing through this section can be diverted along Lanhua Road, Yanhe East Road, Gui Lan Road, Gui Lan Middle Road or other surrounding roads.

Second, the road changes direction:

East Yanhe Road (Guanlan Avenue to Lanhua Road) in Longhua District has been changed from two-way traffic to one-way traffic.

Traffic adjustment and road closure during the blasting project of Lianhua Village Station of Metro 10 line;

1. time

July 2065 12 to 20201October 8 * *180, morning 10: 30 to 12: 30, afternoon 14: 00.

2. Roads

At that time, the intersection of Caitian Road and Lihong Road will be temporarily closed 1 minute for blasting construction, and vehicles and pedestrians are prohibited from entering the blasting construction area. Drivers and pedestrians are requested to observe traffic signs and markings and obey the command of the traffic police when passing through the above-mentioned sections within the above-mentioned time.

Adjustment during construction of Shigu Station of Metro 13 Line

Road closure:

1. time

70 days from July 1 1, 2065438+September 19 * *.

2. Roads

The closed construction of Dashier Road (Xiancha Road to Xiangu Road).

Bypass route

Vehicles passing through this section in the past can be changed to pass along Dashiyi Road or other surrounding roads.

Traffic adjustment during the construction of Longcheng West Station of Metro 16 Line 1. Road closure 1;

1. time

201July 9 1 1 to 201June 918 * * 95 days.

2. Roads

Gexi 3rd Road (intersection of Huangge Road and Weisan Street in Sha Tin) is closed for construction.

Bypass route

Vehicles that used to pass through this section can be changed to pass along Gexi No.2 Road or other surrounding roads.

Second, closed roads 2:

1. time

201July 9 1 1 to 201June 918 * * 95 days.

2. Road closure

Shatin Wai New Street (Ruyi Road to Gexi Road) is closed.

Bypass route

Traffic can be diverted to Second Street in Sha Tin Wai or other peripheral roads.

Traffic adjustment and road closure during the construction of Shuanglong Station of Metro 16 line;

1. time

2065438+July 5, 2009 to 2020 65438+1October1* *180 days.

2. Roads

Fu Jia Street (Changsheng Street to Xinglong Street) is closed.

Bypass route

Vehicles passing through this section in the past can be diverted to Jincheng Street, Jinlong Street or other surrounding roads.

Traffic Adjustment during the Construction of Gangxia North Comprehensive Transportation Hub Project of Subway

Road closure:

1. time

20 19 July 20th to June 9th, 2020 *** 173 days.

2. Roads

The underground passage on the west side of Shennan Huanggang Interchange was closed for construction.

Bypass route

Vehicles that originally left Fuke No.1 Road for Shennan Avenue eastbound or Huanggang Road southbound via this closed section can be diverted from Shennan Avenue westbound via the internal road on the east side of Shenzhen International Innovation Center, and then turn around and turn into Shennan Avenue eastbound or Huanggang Road southbound via Shennan Avenue (citizen center section).

Traffic Adjustment During the Construction of Kexing Station of Metro 13 Line I Road Closure 1:

1. time

201June 2009 to 201918 February 18 * * 180 days.

2. Roads

Ke Hua Road (Keyuan Road to Kewei Road) is closed.

Bypass route

Vehicles passing through this section can be diverted along Wenhua Road, Kefeng Road or other surrounding roads.

Second, the road is changed to 1:

1. time

201June 2009 to 201918 February 18 * * 180 days.

2. Roads

The two-way traffic of Wenhua route is adjusted to one-way traffic from west to east.

Second, the road changes direction 2:

1. time

201June 2009 to 201918 February 18 * * 180 days.

2. Roads

The two-way traffic of Kefeng route is adjusted to east to Xidan.

Adjustment of Four Bus Lines in Longhua District In order to further improve the public transport service level in Longhua District, Shenzhen Public Transport Administration has adjusted four bus lines in Longhua District.

Adjustment time: from August 1, 2065438.

E 1 1 line

E 1 1 line, add Yixiu New Village 1 pair of bus stops in both directions.

No.37 express bus

The bidirectional operation of bus line 37 of the high-speed bus from Li Guang Industrial Zone Station to Minle Subway Station North Bus Station was adjusted to one-way operation from Li Guang Industrial Zone Station to Huangting Guangchang Station.

The road leading to Huang Ting Square was changed from sightseeing road and Meiguan Expressway to sightseeing road, Meiguan Expressway, Huanggang Road, Li Hong Road, Caitian Road, Hua Fu Road, Wuzhong Xin Road, Hua Fu No.3 Road, Zhongxin No.4 Road and Hua Fu Road.

Cancel four unilateral bus stops such as "Liguangshekang Center, Jiekun Industrial Zone, Dafu Industrial Zone Intersection and Yijia Industrial Zone", and add seven unilateral bus stops such as "Minle Subway Station ③, Meilong Tianqiao, Great Wall Development, Lianhua Second Village ②, Armed Police Detachment, Fortune Building and Gangxia Subway Station".

When the service time is adjusted to 06:25-07:50.

B92 1 line

B92 1 Two-way increase of lines 1 pairs of stops.

B769 line

The B769 line from Longhua Station in Silicon Valley to IKEA Industrial Park Station was adjusted to Fuan Yayuan Station to Hengkengwei Bus Station.

The service roads are adjusted from Yijia Road, Fu Rong Road, Hua Fu Road, Fu Qian Road, Nuclear Power Road, Yuexing Road, Guanlan Renmin Road, Guanlan Avenue and Dahe Road to Fu Qian Road, Yijia Road, Fu Rong Road, Hua Fu Road, Fu Qian Road, Nuclear Power Road, Yuexing Road, Guanlan Renmin Road, Dahe Road, Guanlan Renmin Road, Ping 'an Road and Feng Jia Road.

The two sides canceled four pairs of bus stops such as Longhua Market Supervision Bureau, Guanlan Guohong Shopping Mall, Dahe Road and Fuji Xerox, and added six pairs of bus stops such as Fenglu, Hexi, Guancheng, Nanyue Pharmaceutical, Xintang Village and Yijia Industrial Park Pier.

Increase the one-way bus stop from Guanhu Taxation Office to Fuan Yayuan Bus Terminal 1, cancel the one-way bus stop from koi fish Farmers' Market to Hengkengwei Bus Terminal 1, and increase the one-way bus stop from koi fish 1.

The service time of Hengkengwei Bus Terminal was adjusted from 07:00-20:40 to 06: 10-20:00, and that of Fu 'an Yayuan Bus Terminal was adjusted from 06:20-20:00 to 07:00-20:50.

Shenzhen Universiade subway station 16 bus line relocation Due to the influence of the construction of Universiade hub station, the original Universiade subway connection station needs to be relocated. Recently, the bus line 16 passing through the Universiade subway station has been adjusted:

M3 14 line:

One terminal station was changed from the Universiade subway connection station to the first and last bus stations of Hongmian Road.

Some roads in the direction of Hongmian Road Passenger Station were adjusted from Longgang Avenue and Longfei Avenue to Longgang Avenue, Longfei Avenue, Longxiang Avenue, Ainan Road and Longge Road, while some roads in the direction of Shatoujiao Passenger Station were adjusted from Longfei Avenue and Longgang Avenue to Longge Road, Longfei Avenue and Longgang Avenue.

The direction of the first and last stops of Hongmian Road is increased by 1 unilateral bus stop.

The direction of Sha Tau Kok Passenger Station has been increased 1 unilateral bus station.

M3 16 line:

One terminal station was changed from the subway bus connecting station of Universiade to the first and last bus stations of Hongmian Road.

Some roads in the direction of the first and last stations of Hongmian Road were adjusted from Longgang Avenue and Longfei Avenue to Longgang Avenue, Longfei Avenue, Longxiang Avenue, Ainan Road and Longge Road, while some roads in the direction of Fuping Main Station were adjusted from Longfei Avenue and Longgang Avenue to Longge Road, Longfei Avenue and Longgang Avenue.

Add 1 unilateral bus stop in the direction of the first and last stops of Hongmian Road and 1 unilateral bus stop in the direction of Fuping main station.

The service hours of the first and last stations of Hongmian Road were adjusted from 06:00-20:30 to 05:45-20:30, and the service hours of Fuping main station were adjusted from 07:00-2 1:30 to 07:00-2 1:45.

M546 line:

One terminal station was changed from the subway bus connecting station of Universiade to the first and last bus stations of Hongmian Road.

Some roads in the direction of the first and last stations of Hongmian Road were adjusted from Longgang Avenue and Longfei Avenue to Longgang Avenue, Longfei Avenue, Longxiang Avenue, Ainan Road and Longge Road, and some roads in the direction of Pingshan Biling Station were adjusted from Longfei Avenue and Longgang Avenue to Longge Road, Longfei Avenue and Longgang Avenue.

The two sides added 1 pairs of bus stops in the direction of Pingshan Campus of Kangning Hospital, 1 unilateral bus stops in the direction of the first and last stations of Hongmian Road, and 1 unilateral bus stops in the direction of Pingshan Biling Station.

The service hours of the first and last stations of Hongmian Road were adjusted from 05:30-2 1:00 to 05:20-2 1:00, and the service hours of Pingshan Biling Main Station were adjusted from 07:00-22:40 to 07:00-22:50.

M294, M322, M547 and M303 Series:

The two sides canceled the Universiade subway connection station 1 to the bus stop, and added the Universiade subway connection station ① 1 to the westbound direction of Longfei Avenue.

The eastbound direction of Longfei Avenue is increased by 1 "Universiade subway connecting station ②" unilateral bus stop.

M305 line:

1 terminal changed from Universiade subway bus connecting station to Universiade subway connecting station ①.

M367, M3 17, N28 and B852 lines:

1 terminal changed from Universiade subway connecting station to Universiade subway connecting station ③.

Peak lines M3 18, M446 and 90:

1 terminal changed from Universiade subway connecting station to Universiade subway connecting station ④.

Peak line 180:

The two sides canceled the bus stop of "Universiade subway connection station" 1 and added "Universiade subway connection station ③"1.

Other roads and stops of the above 16 bus lines remain unchanged.