Let the railway line introduce?

Tongrang Railway Line crosses Nenjiang River from Tongliao to northeast and enters Daqing Oilfield in Heilongjiang Province. It is connected with Binzhou Railway at Daqing West Railway Station (formerly known as Ranghulu Station), which started in July 1964 and was put into operation in February 1966, with a total length of 42 1 km. It is a railway that mainly transports oil to Daqing Oilfield. Tongrang Line is a state-owned railway trunk line. From Tongliao Station in Inner Mongolia Autonomous Region to Daqing West Station in Heilongjiang Province. After crossing the Liaohe River, it crosses the Xinhe River in the northeast of Baolong Mountain, connects with the Pingqi Line at Taipingchuan Station, connects with the Changbai Line (Changchun to Baicheng) via Qingfeng, Gongnong Lake, Gan 'an and Yuqian to Daan North Station, and connects with Binzhou Line via Nenjiang via Taiyangsheng and Wuxing to Daqing West Station. The total length is 42 1 km, and it is 1 12.9 km in Inner Mongolia Autonomous Region. This line is an important part of railway network construction in eastern and northeastern Inner Mongolia. It is a 1 class railway trunk line with semi-automatic blocking and annual transportation capacity of 109 10000 tons.

Station along the line

Heilongjiang Province: Daqing West Railway Station, Zhuangzhi Station, Independent Tun Station, Yinlang Station, Chuangye Village Station, Linyuan Station, Bacun Station, Wuxing Station, Xinhua Tun Station, Lizhi Station, Taiyangsheng Station, Labor Tun Station and Zhao Xin Station.

Jilin Province: Jin Kui Dabei Station, Jianshe Station, Haituozi Station, Gan 'an Station, Guanzijing Station, Gongnong Lake Station, Jubao Station, Qingfeng Station and Taipingchuan Station.

Inner Mongolia Autonomous Region: Aoli Notification Station, Baolongshan Station, Gaolintun Station, Tongliao East Station and Tongliao Station.

Line jurisdiction

Railway bureau boundary

Tongrang Railway is a state-owned railway jointly managed by Harbin Railway Bureau and Shenyang Railway Bureau. The boundary between Litchi Station and Taiyangsheng Station in Daqing City, Heilongjiang Province is the Railway Bureau.

Station management

Daqing West Railway Station-Litchi Station: it belongs to Daqing Railway Depot of Harbin Railway Bureau;

Taiyangsheng Station-Taipingchuan Station: subordinate to Baicheng Depot of Shenyang Railway Bureau;

Desheng Village Station-Tongliao East Station: It belongs to Tongliao Locomotive Depot of Shenyang Railway Bureau.

Line maintenance management

Daqing West Railway Station-Litchi Station: maintained by Ranghu Road Works Section of Harbin Railway Bureau;

Taiyangsheng Station-Taipingchuan Station: maintained by Baicheng Works Section of Shenyang Railway Bureau;

Desheng Village Station-Tongliao East Station: maintained by Tongliao Works Section of Shenyang Railway Bureau.

Locomotive routing

Route of original locomotive of Tongrang Railway:

Daqing West Railway Station-Litchi Station: Ranghulu Locomotive Depot of Qiqihar Railway Branch of Harbin Railway Bureau (Ranghulu Locomotive Depot of Harbin Railway Bureau);

Taiyangsheng Station-Tongliao Station: undertaken by Daanbei Locomotive Depot of Changchun Railway Branch of Shenyang Railway Bureau;

All trains stop at litchi station to change locomotives.

Route of existing locomotives of Tongrang Railway;

All the existing locomotives of Tongrang Railway are delivered by Tongliao Locomotive Depot of Shenyang Railway Bureau (Liaoning Section of Shenyang Railway Bureau), and the locomotives will not be replaced.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.