When handing over the house, the seemingly simple embryo room actually has a lot of knowledge. When we get the new house, we should examine it carefully. If there are some small defects that need to be repaired in time, then talk about the places that need attention.
The first is the laying of water and electricity pipes in the house. Although the specific laying still needs to be designed and implemented by itself, the main pipes and lines should be done by the builder when the house is handed over. Therefore, when handing over the house, we should carefully check whether there are any problems with these pipelines, and if there are, we should deal with them as soon as possible.
Then, the doors and windows are closed. The degree of closure of doors and windows largely determines our future living comfort, so we should focus on checking the closure of door frames. Furthermore, the waterproof performance of the floor wall is also very important, especially in the kitchen and bathroom. If there is water leakage, it must be promptly reported to the contractor and repaired in time, otherwise it will be in trouble after renovation.
In addition, the flatness of the ground also has a great influence on our decoration. The condition of the wall is also very important for our house, because the wall is the most important part of our house, especially whether the load-bearing wall meets the standard is very important for our house.