Basic profile
Expressway from Shenyang to Haikou was originally a part of expressway, and now it is the route from Shenyang to Haikou in the national unified expressway plan, and it is the only expressway that runs through the southeast coastal areas of China.
The country code is G 15. The total length is 37 10 km. It starts in Shenyang, Liaoning Province, passes through 8 provinces and cities of Liaoning, Shandong, Jiangsu, Shanghai, Zhejiang, Fujian, Guangdong and Hainan, and ends in Haikou, Hainan Province. (The following cities are all prefecture-level and above cities. For details, you can check the column "Situation along the route" through counties and cities. )
Liaoning section: Shenyang, Liaoyang, Anshan, Yingkou and Dalian;
Shandong section: Yantai, Qingdao and Rizhao;
Jiangsu section: Lianyungang, Yancheng, Nantong and Suzhou;
Shanghai section;
Zhejiang section: Jiaxing, Ningbo, Taizhou and Wenzhou;
Fujian section: Ningde, Fuzhou, Putian, Quanzhou, Xiamen and Zhangzhou;
Guangdong section: Chaozhou, Shantou, Jieyang, Shanwei, Huizhou, Shenzhen, Dongguan, Guangzhou, Foshan, Jiangmen, Yangjiang, Maoming and Zhanjiang;
Hainan section: Haikou.
The total length is 3642 kilometers. At present, except Xuwen-Haikou section, the whole line has been opened to traffic (Dalian-Yantai is temporarily connected by ferry, and the Bohai Bay cross-sea bridge is planned to be built in the future).
The planned route of shenyang-haikou expressway consists of Shenyang-Lianyungang section of the original national trunk line, Lianyungang-Shanghai section of Jiayin-Nanping line, and Shanghai-Haikou section of the same third line.
Tongsan expressway, also known as National Highway 0 10, or National Roads 0 10 and G0 10, starts from Tongjiang City, Heilongjiang Province and ends in Sanya City, Hainan Province, with a total length of 5,700 kilometers.
Shenyang-Dalian expressway is managed by Liaoning expressway Administration Bureau, which has three management offices, and its main business is divided into road administration, maintenance, toll collection, communication and operation. Shenyang-Dalian expressway was built in 1984 with a total cost of 2.2 billion RMB. 1September, 1990, Shenyang-Dalian expressway was opened to traffic, with a total length of 375 kilometers, connecting Shenyang, Liaoyang, Anshan, Yingkou and Dalian, creating a precedent for the construction of long-distance expressway in China. In May 2002, the expansion project was carried out for more than two years.
Yuantong San expressway
Tongsan Expressway will be renamed as "Shenhai"
Tongsan expressway, also known as National Highway 0 10 (or "National Highway 0 10 Line" and "G0 10 Line"), starts in Tongjiang City, Heilongjiang Province and ends in Sanya City, Hainan Province, with a total length of 5,700 kilometers. It is the longest trunk line in the "five verticals and seven horizontals" planned by the state, and it is also the only expressway that runs through the coastal areas of China. On June 2004, the whole line was connected at 65438+1 October1.
Shenyuan to Dalian expressway
Now the Liaoning section of Shenhai Expressway is the original Shenda Expressway.
All the projects in Shenyang-Dalian expressway are designed and constructed according to international standards, and domestic materials, high-tech and advanced equipment are adopted, so that all the projects can reach high quality. Construction started on June 27th 1984, and the whole line was officially opened to traffic on June 27th 1990. It cost 2.2 billion. 1July 992 12 to 14, which passed the national acceptance. 1993 expressway Construction of Shenyang University won the first prize of National Science and Technology Progress Award. 1994 won the sixth national excellent engineering design gold medal.
Known as "the first road in China", Shenyang-Dalian expressway was built in 1984 and 1990, with four lanes in both directions. By the end of 5438+0 in 2006, the whole line of Shenyang-Dalian Expressway had been in operation 1 1 year, and some sections had reached 13 years, reaching the overhaul period.
200 1 The Liaoning Provincial Party Committee and the provincial government made a scientific decision, and decided to carry out the reconstruction and expansion of Shenyang-Dalian expressway in accordance with the principle of "one step in place and moderate advance" and the two-way eight-lane standard. The total length of the reconstruction and expansion project is 347.859 kilometers, with a total investment of 7.2 billion yuan. The project started on May 28th, 2002 and was completed on August 22nd, 2004 one month ahead of schedule. After the reconstruction and expansion, the expressway of Shenyang-Dalian has a wide view of the route, a gentle alignment, and various control indexes such as subgrade, pavement and bridge are superior to the current standards. It has become a demonstration project for the reconstruction and expansion of expressway by the Ministry of Communications, and it is a two-way eight-lane expressway with the highest domestic standard, the longest mileage and the most advanced facilities.
The above is the basic information of Shenhai Expressway. If you want to know more about Shenhai Expressway, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.