Yan Yan expressway introduced?

Yan 'an Yanchang National expressway, referred to as Yan 'an Expressway for short, numbered G22( 1 1), starts from Majiagou, Yan 'an, passes through Shaanxi and ends at the border of Shaanxi, with a total length of1/6.52km.. Yanchang expressway was officially completed and opened to traffic on June 4th, 2005. The following is the introduction of the construction network to the basic situation of salt rock expressway:

The route from Yan 'an to Yanchuan expressway starts from Majiagou, north of Yan 'an, connects with Baomao expressway via the junction interchange, and then passes through fengcun Township, Tsinghua Border Township, Long Yuan Miao Township, Yaodian Town, Ganguyi Town, Heijiabao Township of Yanchuan County, Yuju Town, Wen 'anyi Town, Yanchuan Town, Ma Jiahe Township, Tu Gang Township and Yanshuiguan Town of Yanchuan County eastward, and builds a Yellow River bridge next to Liu Jia. Total length of the route116.52km. The whole line adopts two-way four-lane expressway technical standard, starting from Majiagou to Yaodian section 37. 1km, Yanchuan to Shaanxi-Shaanxi junction section 33.4km, design speed 80km/h, subgrade width 24.5m, Yaodian to Yanchuan section 46.2km, design speed 100km/h and subgrade width 26 m. The total investment is 654.38+00.62 billion yuan.

Yan Yan opened to traffic in expressway.

On September 27th, the reporter learned from the Municipal Transportation Bureau that the Wanhua Link Line, the first phase project of Yan-Yan Expressway and the capacity expansion project of Huang-Yan Expressway, was officially opened to traffic at 8: 00 this morning.

Yan 'an Economic and Technological Development Zone is located in the northeast of our city. The project starts about 700 meters west of Kawaguchi Bridge in the northeast of Yan 'an, connects with National Highway 2 10, and passes through Kawaguchi Bridge and Liqu Town to Yangshan Bridge of North Railway Station. The whole line adopts the first-class highway technical standard, with two-way six lanes, with a total length of 6.6 13km, a design speed of 60km/h and a subgrade width of 32 m. The construction of Wanhua connecting line of Huangyan expressway expansion project starts from Wanhua toll station of Huangyan expressway expansion project and connects with Nanbin Road of majiawan via Fuma Village and Zhangping Village. The whole line is designed according to the first-class highway standard, with four lanes in two directions, with a total length of 8.385km, a design speed of 60km/h and a subgrade width of 23 m.

It is reported that these two highway construction projects are the key projects in the city. Among them, the Wanhua connecting line of Huangyan expressway expansion project will greatly facilitate the high-speed vehicles from Wanhua to get on and off, which is of great significance to broaden the urban framework, improve the urban traffic capacity and promote Yan 'an's economic and social development, especially the development of tourism. After the opening of the first phase of the Yan-Yan Expressway connecting line, it will effectively alleviate the traffic congestion in the Economic Development Zone, provide a convenient passage for the efficient, safe and rapid transfer of vehicles between the urban area and national trunk lines such as 2 10 and Yan-Yan Expressway, and is of great significance for strengthening the traffic connection between the Economic Development Zone and the central city. Improve the service level of urban road network, ease the traffic pressure in the Economic Development Zone, expand the urban development space of Yan 'an, improve the regional traffic environment, and promote the healthy development of the Economic Development Zone.

The above is an introduction to Yan Yan's network construction in expressway. For more information about expressway, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.