On May 28th 1 1: 40, the passenger ro/ro "Qiao Zhou 2" departing from Shengsi Li Zhushan Wharf slowly docked at Shenjiawan Passenger Terminal, which marked the official trial operation of the route from Sijiao to Shenjiawan.
Shenjiawan passenger terminal is an important part of Shenjiawan passenger terminal project. Located at the eastern end of Yangshan Deepwater Port, construction started on June 5, 2009. * * * There are 1000-ton passenger rolling berths, 500-ton high-speed passenger ships 1 berths and supporting facilities, which have long-term development space. The total length of the terminal is. At present, Shenjiawan Wharf only opens the four-corner round-trip route, and the sailing time from Sijiao Island to Xiaoyangshan will be reduced by about half an hour.
The reporter also learned from Shengsi County Transportation Bureau that as the hub passenger station of Zhoushan Islands' northward passage in the future, the Shenjiawan Passenger Transport Center project has entered the final stage, the breakwater has been completed, the passenger transport center building is undergoing interior decoration, and the supporting wiring roads are also accelerating the progress of the project, striving to be officially put into use as soon as possible.