I don't know when the highway from Jingyuan to Huining in Baiyin City, Gansu Province will be repaired.

I am happy to answer for you:

Last spring, it was said that construction would start in autumn, and in autumn, it was said that construction would start next spring. It's 20 15 now. I don't know if we can start work in spring. No one can say for sure. So far, Jinghui officials have not announced the exact commencement date and construction plan, and it is estimated that the possibility of starting this year is very high.

Just got the news:

G247 Jingyuan-Huining Highway Reconstruction Project Bidding Announcement Source: Gansu Economic Daily Author: Anonymous Update: 201416 Font: large, medium and small.

Tender Notice for Survey and Design of Jingyuan-Huining Highway Reconstruction Project on G247 Line

Transaction number: gj141014127.

1.

Bidding conditions

The highway reconstruction project of Jingyuan-Huining section of G247 line was approved by Gansu Provincial Department of Transportation. The project owners are Gansu Baiyin Highway Administration Bureau and Huining County Transportation Bureau. Construction funds are composed of state investment and local self-raised funds. The bidders are Baiyin Highway Administration Bureau of Gansu Province and Huining County Transportation Bureau. The project has met the requirements of survey and design bidding, and the survey and design of this project is now subject to public bidding.

2.

Project overview and bidding scope

(1) Construction scale and technical standards

The starting point of the project is located in Nagato, Jingyuan County, and it is arranged from north to southeast, and the end point is located in Houjiachuan Township, Huining County (at the junction of Huining County and Tongwei County). Total length of the route 145.375 km (30.0 km in Jingyuan County and 1 15.375 km in Huining County). The whole line adopts secondary highway technical standards. According to different paragraphs, the design speed is 60Km/h and 40Km/h respectively.

(2) Survey and design cycle

Preliminary survey and design: 20 14

165438+1before October 30th; B. Survey and design of construction drawing: submit the drawings, bill of quantities and technical specifications required for the construction drawing and the bid invitation of sub-section (preparation of construction bidding documents) to the tenderee before 20 14 12 15.

(3) Bidding scope

The survey and design of this project includes preliminary survey and design, construction drawing survey and design, follow-up services (including construction bidding service, construction site service and defects liability period service), preparation of budget, drawings used in construction bidding documents, preparation of bill of quantities and other materials.

I hope I can help you, please adopt it.