G 12 Hunwu Expressway consists of the original national trunk line, the third branch line from Changchun to Hunchun and the national key highway from Changbai Mountain to Aershan from Changchun to Ulanhot.
Service area information
Name Chainage K47 Tumen Service Area Yanji Service Area K11+Kloc-0/00 Antu Service Area K 173+600 Dunhua Service Area K2 19+600 Huangnihe Service Area K256+200 Jiao.
G 12 1 1 Jihei Expressway (Jilin-Heihe) Route: Jilin-Lan Shu-Wuchang-Harbin-Mingshui-Heihe [Port].
Jilin section: under construction.
Heilongjiang section: Jihejie to Bei 'an is under construction, and Bei 'an to Heihe has been connected.
The expressway consists of the Heihe-Jilin section of the former national key highway Heihe-Tonghua line.
G 12 12 Ji Shen expressway (Shenyang-Jilin) route: Shenyang-Fushun-Meihekou-Jilin.
The whole line has been opened to traffic.
Related ring expressway
G 1203 Baicheng Ring Expressway: Baicheng West (Houjia)-Baicheng North (Dongfeng)-Baicheng East (workers and peasants)-Industrial Park (Hui Jin Street)-Baicheng South (Xingfu Avenue) has been fully opened, and Baicheng South (Xingfu Avenue)-Economic Development Zone (Xinhua Road)-Baicheng West (Houjia) has been closed for construction.
G0 102 Changchun Ring Expressway: The whole line has been opened to traffic.
G 120 1 Jilin Ring Expressway: Hongqi-Jiangmifeng-Tiannan-Fengman
The whole line has been opened to traffic.
G 1202 Songyuan Ring Expressway
The whole line has been opened to traffic.
The above is the introduction of G 12 mixed-martial expressway by Construction Network. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.