Lingling chooses a good room for information consultation.

Set the total workload to 1. A weekly workload X. Then B's workload is (1/6-X).

4X+9( 1/6-X)= 1

X= 1/ 10

Then it takes 10 weeks for A to do it alone. B it takes 15 weeks. It's time to consider options.

Let's set a weekly salary of x, and the weekly salary is (5.2/6-X).

4X+9(5.2/6-X)=4.8

X=0.6

Then A needs 6W. B it needs 4W. Save money and consider B.