Engineering Data Supervision Contract 1 Party A (Employer): _ _ _ _ _ _ (hereinafter referred to as Party A)
Party B (employee): _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)
Party A and Party B sign this contract on the principle of voluntariness, equality and consensus through consultation.
Rule number one. Term and validity of the contract:
After the expiration of this contract from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 2. Position and responsibilities of Party B:
1. From the date of signing this contract, Party B shall be responsible for the quality supervision of the construction project of Party A's Guodian Power Supply Station.
2. Be familiar with the engineering conditions, technical specifications and design drawings, control the construction progress and ensure the quality requirements.
3. Strictly implement the regulations of on-site supervision, check and sign every working procedure of the contractor according to the specifications, promptly put forward the non-conforming parts and ask the contractor to correct them. If major quality problems are found, report to Party A in time.
4. Supervise various tests of the contractor, including sampling, sample preparation, various standard tests and inspection tests. For any suspicious test results, a confirmation test should be carried out, and the contractor should be urged to sort out the test records and reports and file them in categories.
5. Conduct on-site verification and inspection of the bill of quantities submitted by the contractor on schedule.
6. Make supervision records and diaries, and report to Party A regularly and irregularly.
7, must strictly perform the supervision duties, and shall not take advantage of his position to engage in malpractices for personal gain, causing damage to Party A's interests. ..
8. Take full responsibility for personal and property safety during the contract period.
Article 3. Remuneration for work:
Party A shall pay Party B RMB yuan every month.
Article 4. Party B shall consciously obey the management and scheduling of Party A. ..
Article 5. Alteration, termination and rescission of the labor contract:
1. After the employment contract is signed according to law, both parties to the contract must fully perform their obligations stipulated in the contract, and neither party may change the contract without authorization. If it is really necessary to change the contract, both parties shall reach an agreement through consultation and change the contract according to the original signing procedure. If both parties can't reach an agreement, the original contract is still valid.
2. When the employment contract expires or the termination conditions agreed by both parties appear, the employment contract will be automatically terminated.
3. Party B fails to perform the labor contract.
4. Party B shall notify Party A in writing 30 days in advance if it wants to terminate the labor contract.
Article 6. Other matters:
1. This contract is made in triplicate, two for Party A and one for Party B, and shall come into effect after being signed and sealed by both parties.
2. In case of any conflict between the terms of this contract and the national laws and regulations, the national laws and regulations shall prevail.
3. Other matters that both parties think need to be agreed.
Party A (seal):
Representative (signature): _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B (signature): _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Engineering Data Supervision Contract 2 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _
Representative: _ _ _ _ _ _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _
Tel: _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
Representative: _ _ _ _ _ _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _
Tel: _ _ _ _ _ _ _ _ _ _ _
Risk warning: _ _ _ _ _ _ _ _ _ _ _
There are many ways of cooperation, such as setting up a company, developing software, buying and selling products, etc. Different cooperation methods involve different project contents, and the corresponding terms of the agreement may be quite different.
The terms of this agreement are based on specific projects and are for reference only. In practice, it is necessary to modify or redraft the terms according to the actual cooperation mode, project content, rights and obligations of both parties, etc.
After full consultation between Party A and Party B, the following terms of the cooperation agreement are reached for both parties to abide by.
I. Contents of cooperation
1. Party A has established _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. After the establishment of Party A's branch, Party B will come forward to contract the operation and management of Party A's branch, and Party B will undertake the supervision business in the name of Party A's branch and report it to Party A for the record. During the supervision period, Party A will supervise and manage Party B's affairs.
Two. Rights and obligations of Party A and Party B
Risk warning: _ _ _ _ _ _ _ _ _ _ _
The rights and obligations of all parties to the cooperation should be clearly agreed to avoid wrangling in the actual operation of the project.
Warm reminder again: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
1. Party A is responsible for providing valid business license and engineering supervision qualification certificate.
2. Party A shall conduct corresponding filing management for Party B's project supervision and provide corresponding business guidance for Party B's supervision.
3. Party B must strictly implement the supervision laws and regulations in accordance with the requirements of national engineering construction laws and regulations, strictly coordinate the supervision order, and ensure the quality of engineering supervision.
4. Party B must be equipped with corresponding engineering supervision professionals to ensure that the technical and quality requirements of engineering supervision are met in the process of engineering supervision. All engineering supervision technicians and management personnel shall be appointed and removed by Party B. ..
5. Party B must provide the corresponding financial statements to Party A on a monthly basis, report to Party A the agreed total price of undertaking the supervision project and the corresponding cost sharing in time, and pay the corresponding management fees on time according to the proportion agreed by both parties.
Three. distribution of income
1. Party B shall pay USD _ _ _ _ _ _ _ _.
2. Management expenses shall be settled once every quarter.
Fourth, the liability for breach of contract
Risk warning: _ _ _ _ _ _ _ _ _ _ _
Although the contract is detailed, there is no guarantee that the partner will not breach the contract. Therefore, it is necessary to clearly stipulate the terms of breach of contract, and once one party breaches the contract, the other party can use it as the basis for recovery.
1. Party A must provide the corresponding business license and qualification certificate as agreed, otherwise Party B has the right to terminate this agreement at any time and demand Party A to compensate the corresponding losses.
2. Party B must pay the corresponding management fee according to this agreement. If the overdue period exceeds _ _ _ _ _ _ _ _ months, Party A has the right to dissolve this Agreement and require Party B to pay _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Verb (abbreviation for verb) dispute settlement
During the validity of the agreement, if there is any dispute between the two parties, it shall be settled through consultation on the principle of mutual understanding and mutual benefit. If negotiation fails, both parties may bring a lawsuit to the people's court where Party A is located.
Intransitive verb others
This agreement is signed in the form of _ _ _ _ _ _ _ _ _ _
Party A (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative (signature): _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative (signature): _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Engineering Data Supervision Contract 3 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ContractNo.: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _.
Legal Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
In accordance with the Contract Law of People's Republic of China (PRC) and relevant regulations, Party A and Party B have reached an agreement on the entrusted supervision of decoration project on the principle of honesty, credibility, equality and mutual benefit, and signed this contract.
Article 1 General situation of the project
The general situation of the projects entrusted by Party A to Party B for supervision (hereinafter referred to as "projects") is as follows:
1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ office building networking transformation.
2. Project location: Room: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. Project scale: The total investment is RMB _ _ _ (in words: _ _ _ _).
Article 2 Rights of Party A
1. Party A has the right to choose the general contractor and sign a contract with it.
2. Party A has the right to determine the project scale, design standards, planning and design, production process design and functional requirements for design and use, and to approve engineering design changes.
3. Party B must obtain the consent of Party A in advance to replace the chief supervision engineer.
4. Party A has the right to require Party B to submit monthly supervision reports and special reports within the scope of supervision business.
5. When Party A finds that Party B fails to perform the supervision duties according to the supervision contract, or colludes with the contractor to cause losses to Party A or the project, Party A has the right to ask Party B to replace Party B's personnel until the contract is terminated, and ask Party B to bear corresponding liability for compensation or joint liability for compensation.
Article 3 Obligations of Party A
1. Party A shall pay Party B the advance payment before Party B starts the supervision business.
2. Party A is responsible for coordinating all external relations of the project construction and providing external conditions for the supervision work. If part or all of the coordination work is entrusted to Party B as required, the entrusted work and corresponding remuneration shall be agreed in the special terms and conditions.
3. Party A shall provide Party B with the project-related engineering materials needed for the supervision work free of charge within the time agreed by both parties.
4. Party A shall make a written decision on all matters submitted by Party B in written form and required to be decided within the agreed time.
5. Party A shall authorize a resident representative who is familiar with the engineering situation and can make a decision within the specified time to contact Party B and inform Party B before replacing the resident representative.
6. Party A shall promptly notify the contractor of the selected contract in writing of the supervision right granted to Party B and the division of functions and supervision authority of Party B's main members, and make it clear in the contract signed with the third party.
7. Party A shall provide the following information within the time that does not affect Party B's supervision:
(1) List of manufacturers of raw materials, components and equipment cooperating with this project;
(2) Provide the cooperative units and the list of cooperative units related to this project.
8. Party A shall provide Party B with office space, communication facilities, employee housing and agreed facilities free of charge, and give reasonable economic compensation to Party B's own facilities.
Article 4 Party A's responsibilities
1. Party A shall perform the obligations stipulated in the entrusted supervision contract. If it violates this contract, it shall bear the liability for breach of contract and compensate the economic losses caused to Party B. ..
2. If Party B suffers losses due to reasons not attributable to Party B when handling entrusted business, it may claim compensation from Party A. ..
3. If Party A's claim against Party B cannot be established, Party A shall compensate Party B for all expenses arising from the claim.
Article 5 Rights of Party B
1. Within the scope of the project entrusted by Party A, Party B enjoys the following rights according to the authorization of Party A and relevant laws and regulations:
(1) The suggestion right to select the general contractor;
(2) the right to approve the selection of project subcontractors;
(3) The right to make suggestions to Party A on matters related to project construction, including project scale, design standards, planning and design, production process design, functional requirements, etc.
(4) According to the principle of safety and optimization, put forward suggestions to designers on technical problems in engineering design; If the proposed scheme may increase the project cost or extend the construction period, Party A's consent shall be obtained in advance. If it is found that the engineering design does not meet the quality standards of construction projects promulgated by the state or the design contract, Party B shall report to Party A in written form and ask the designer to correct it;
(5) According to the principles of quality assurance, time limit for a project and cost reduction, examine and approve the project construction organization design and technical scheme, make suggestions to the contractor, and submit a written report to Party A;
(6) Be responsible for the organization and coordination of relevant cooperative units in engineering construction, and report important coordination matters to Party A in advance;
(7) With the consent of Party A, Party B has the right to issue a commencement order, a suspension order and a resumption order, but it shall report to Party A in advance. If it fails to report in advance in case of emergency, it shall report to Party A in writing within 24 hours;
(8) the right to check the materials used in the project and the quality of the project. Have the right to notify the contractor to stop using materials, components and equipment that do not meet the design requirements, contract provisions and national quality standards; For processes, divisions, subdivisional works and unsafe construction operations that do not meet the specifications and quality standards, the contractor has the right to notify the contractor to stop work, rectify and rework. The contractor can only resume work after receiving the instruction from the supervision organization;
(9) the right to inspect and supervise the progress of the project, and the right to sign and recognize that the actual completion date of the project is ahead of or beyond the completion period stipulated in the project construction contract;
(10) within the scope of the project price agreed in the project construction contract, the right to sign and recognize the project payment and the right to veto the confirmation of the project settlement. Without the signature of the chief supervision engineer, Party A will not pay the project payment.
2. Under the authorization of Party A, Party B may propose changes to the contractual obligations of any contractor. If this seriously affects the project cost or quality or progress, such changes must be approved by Party A in advance. In case of emergency, if Party A fails to get approval in advance, Party B shall also inform Party A of the changes made as soon as possible. In the process of supervision, if the contractor's personnel are found to be ineffective, the supervision institution may require the contractor to replace the relevant personnel.
3. Within the scope of the entrusted project, any opinions and requirements (including claims) of Party A or the contractor to the other party must first be put forward to the supervision organization, which will study and handle the opinions and then negotiate with both parties. In case of dispute between Party A and the contractor, the supervision institution shall make independent judgment and mediate fairly according to its own functions. If the dispute between the two parties is mediated by the administrative department of construction of the government or arbitrated by an arbitration institution, the factual materials to prove it shall be provided.
Article 6 Obligations of Party B
1. Party B shall dispatch the supervision institutions and Party B's personnel required for supervision according to the contract, submit the list of appointed chief supervision engineers and main members of supervision institutions and supervision plans to Party A, and complete the supervision business within the scope of supervision projects agreed in the special terms and conditions of the supervision contract. During the performance of contractual obligations, the supervision work shall be reported to Party A on a regular basis as agreed in the contract.
2. When performing the obligations under this contract, Party B shall work diligently and conscientiously, provide suggestions suitable for Party A, and fairly safeguard the legitimate rights and interests of all parties.
3. The facilities and articles provided by Party A used by Party B belong to Party A's property. When the supervision work is completed or suspended, the facilities and remaining items shall be handed over to Party A in the time and manner agreed in the contract.
4. During the contract period or after the termination of the contract, confidential information related to the project and the contract business shall not be disclosed without the consent of the relevant parties.
Article 7 Responsibility of Party B
1. The responsibility period of Party B is the validity period of the entrusted supervision contract. In the process of supervision, if the date agreed in writing is exceeded due to the delay or delay of construction progress, both parties shall further agree to extend the contract period accordingly.
2. During the liability period, Party B shall perform the agreed terms. If Party B's fault causes economic losses to Party A, it shall compensate Party A. ..
3. Party B is not responsible for the contractor's violation of the quality requirements and completion (drawing and delivery) period stipulated in the contract. If the entrusted supervision contract cannot be fulfilled in whole or in part due to force majeure, Party B shall not be liable. However, Party A shall be liable for compensation for related matters that violate the provisions of Article 5.
4. When Party B's claim against Party A cannot be established, Party B shall compensate Party A for all expenses arising from the claim.
Article 8 Supervision remuneration and its payment
1. The total remuneration of the supervisor is RMB _ _ _ _ (in words: _ _ _ _).
2. The payment method of the above supervision fee is as follows.
3. If Party A fails to pay the supervision remuneration within the stipulated payment period, it shall pay Party B a late fee of% of the overdue amount every day.
Article 9 Term of Contract
_ _ _ _ months, starting from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 10 Settlement of disputes
Any dispute arising from the interpretation or performance of the relevant provisions of this contract shall be settled through friendly negotiation. If the settlement or mediation fails, either party may bring a lawsuit to the people's court with jurisdiction.
Article 11 Conditions for entry into force
1. This contract shall come into effect as of the date when the legal representatives or authorized agents of both parties sign and affix their official seals. All parties shall affix the seal of riding seam to the original contract.
2. This contract is made in duplicate and has the same legal effect. Each party holds one copy, and the rest is used to perform relevant legal procedures.
Party A (signature): _ _ _ _ _ _ _ _ _ _ _ Party B (seal): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Authorized Agent: (signature) _ _ _ _ _ _ _ _ _ Authorized Agent: (signature) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Address of the company: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Postal code: _ _ _ _ _ _ _ _ _ _ _ _ Postal code: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Phone number: _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ Phone number
Fax: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
E-mail: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Bank of deposit: _ _ _ _ _ _ _ _ _ _ _ _ _ Bank of deposit: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Account number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Entrusting Party of Engineering Data Supervision Contract 4 (hereinafter referred to as Party A)
Supervisor (hereinafter referred to as Party B)
Party A entrusts Party B to supervise the decoration project, and both parties agree to sign the following contract through consultation:
I. Service content, methods and requirements
1, service content:
① Project name: Deshantang Dongpu Pharmacy, Deshantang Jinjiting Pharmacy and Clinic, Deshantang Ruili Clinic.
③ Project scale: The total indoor construction area is about 1 000m2.
④ Supervision scope: interior part of decoration drawings.
(5) Service scope:
(1) Early supervision
Examining and approving design plans and drawings; Review the project budget; Within five working days after the design scheme is determined, calculate the engineering quantity according to the design drawings, prepare the budget according to the quota, and control the total cost of the whole project.
(2) Medium-term supervision
According to the drawings and material list, the materials of each node are accepted on site to prevent the construction unit from changing the brand and quality of the materials; Check the concealed engineering quality of each node and confirm whether each node is constructed according to the drawings; If it needs to be changed due to other factors such as design, site and drawings, dock with the construction unit to confirm the visa change;
(3) Late supervision
Audit of project settlement; Review the increase or decrease of the construction unit and the settlement when the project is completed.
2. Service mode:
① In the early stage of construction, Party B shall cooperate with Party A to complete the supervision and audit.
(2) During the construction period, Party B shall supervise the decoration construction process irregularly.
(3) In the later stage of construction, Party B shall review the project settlement and assist Party A to sign the project quality warranty contract.
3. Service Commitment:
(1) During the project supervision, Party B provides Party A with relevant rationalization suggestions according to the actual situation of the project.
(2) Party B provides supervision services for Party A with a positive, serious, responsible and fair service attitude.
(3) Party B shall monitor all important links of the project construction in detail to ensure that the project quality reaches the expected goal.
Two. The client provides the following conditions:
Provide Party B with the list of manufacturers of raw materials, spare parts and mechanical equipment related to this project, as well as the list of cooperative units and cooperative units related to this project.
Three. scope of authority
Within the scope of the entrusted project, Party A shall notify the construction unit in writing to grant Party B the following supervision rights:
1, correct selection of materials and inspection of construction quality.
2. The right to change the construction technology shall be approved by Party A. ..
3. Have the right to propose punishment suggestions to the construction unit.
4. Have the right to suggest the adjustment of the personnel of the construction unit and the right to manage the civilized construction on site.
5, the project starts, stops, resumes, delays, acceptance and other links to sign recognition.
6. Project payment audit. Without the signature and approval of Party B, Party A will not pay the right to operate the project 1 of the construction unit.
7. The right to monitor the quality, progress and cost of the project, and the right to sign the commencement date (in advance or overdue).
8. The right to organize and coordinate the presiding and cooperating units.
Four. Term of contract:
From the date of signing the contract, that is, 20x65438+February 1 to 20xx February 28th.
V. Supervision fee and payment method:
1. The supervision fee for this renovation is 80,000 yuan. [The supervision period is three months. If it is overdue for more than one month, the supervision fee will be increased by 10% as compensation]
2. Payment method:
During the contract period, the payment shall be made in two installments, with the first installment of 50%, ¥ XX,000 Yuan (in words: RMB 40,000 Yuan only). Party B shall be paid within three days after the signing of the contract, and 50% of the final payment (in words: RMB 40,000 only) shall be paid within three days after the completion of the project settlement.
Liability for breach of contract of intransitive verbs:
1. During the supervision responsibility period, if Party B's fault causes economic losses to Party A, Party A has the right to deduct the corresponding loss expenses from Party B's supervision expenses.
2. Party B shall not bear the losses caused by Party A's failure to perform the authority granted to Party B. ..
3. If Party A fails to pay the supervision fee to Party B on schedule, it shall bear a penalty of 5‰ of the contract price for each day overdue.
Seven. Disputes and solutions:
1. In case of any dispute between Party A and Party B on the responsibility of project supervision, a decision shall be made based on whether Party B's specific supervision behavior conforms to the relevant national supervision norms and standards.
2. If the project supervision responsibility cannot be determined, Party A and Party B have the right to submit it to the relevant department for determination or to the relevant arbitration institution for arbitration.
3. Losses and economic compensation caused by breach of contract or termination of contract shall be settled by both parties through consultation. If negotiation fails, it shall be submitted to the relevant arbitration institution for arbitration or bring a lawsuit to the people's court.
Eight, this contract is made in duplicate, each party holds two copies, which will take effect after signing and automatically become invalid after the project is completed.
Company of Party A (seal): Party B (seal):
Entrusted agent (signature) Entrusted agent (signature):
Address of Party A: Address of Party B:
Tel: Tel:
Year, month, sun, moon, sun.
Project data supervision contract 5 Party A: _ _ _ _ _ _ _
Party B: _ _ _ _ _ _
In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A and Party B, following the principles of equality, voluntariness, fairness and good faith, have reached the following agreement on entrusting Party B to demolish all houses (including all buildings (structures) and attachments) within the project land.
I. Overview of the Project
1, project name:
2. Project location:
3, project content and main quantities:
4. Contract price:
Second, the responsibilities of both parties.
(1) Party A's responsibilities:
1. Assist Party B to determine the buildings, attachments and related equipment for project demolition.
2. Supervise the organization, safety protection measures, site management and project implementation during the construction of this project, and check the project progress and construction quality.
3. Organize the project completion acceptance in time.
(II) Party B's responsibilities:
1. According to the project contents and requirements agreed in Article 1 of this Agreement, ensure that the above-ground buildings (structures), attachments, equipment relocation and site leveling are completed within the agreed time limit (relocation means that the outdoor terrace elevation is 0. 00) and dirt garbage removal, etc.
2. Comply with national, provincial and municipal regulations on the construction of this project. Party B shall not subcontract the project. During the construction process, the representative of Party B shall stay at the site for a long time to command and coordinate until the end of the project.
3. Appoint _ _ as the representative of Party B at the construction site, be responsible for the management of the construction site of this project, and implement measures such as safe production, civilized construction, dust prevention and dust reduction to ensure that the construction site meets the management requirements of relevant government departments.
4. In the whole process of project construction, Party B shall take adequate and effective safety measures in strict accordance with the construction specifications, and shall be responsible for the safety of nearby buildings that have not been demolished. In case of any safety accident or damage to adjacent buildings during construction, Party B must bear all legal and economic responsibilities.
5. Actively cooperate with Party A's requirements, dismantle it while accepting it, and advance the project progress as soon as possible.
Third, the liability for breach of contract
1. If the construction period is delayed due to Party B's reasons, Party A will deduct it from Party B's demolition business expenses according to the standard of 500 yuan/day.
2. In the process of construction, if Party A fails to cooperate with or violate one of Party B's responsibilities in a timely and effective manner, Party A has the right to invite other construction units to carry out construction, and Party B shall leave the site unconditionally without interference.
Four. any other business
1. In case of any dispute between Party A and Party B during the performance of this contract, both parties shall settle it through consultation in a common, understanding and friendly manner; If negotiation fails, you can apply for mediation to the construction administrative department where the project is located; If mediation fails, it may be submitted to Xiamen Arbitration Commission for arbitration.
2. If the construction period is delayed due to the shutdown caused by Party A or natural factors of force majeure, or the demolition is blocked by the relocated households, the construction period will be postponed.
3. If there are matters not covered in the implementation of this contract, Party A and Party B may sign a supplementary contract or agreement separately through consultation, and the supplementary contract or agreement has the same legal effect as this contract.
Verb (abbreviation of verb) This contract is signed on _ _ _ _ _ _ _ _ _ _ _.
Party A: _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Representative: _ _ _ _ _ _ _ _ _ _ _ Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Date of Signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _