Green building case introduction?

Green building refers to a kind of building that is harmless to the environment, can make full use of environmental natural resources and does not destroy the basic ecological balance of the environment. It can also be called sustainable development building, ecological building, returning to nature building, energy-saving and environmental protection building, etc.

The reason why green buildings emphasize indoor environment is because the mainstream idea in the field of air conditioning is to strive for a balanced relationship between the internal and external environment, while the internal environment, that is, health, comfort and productivity of building users, shows different needs.

Let's take a green building case as an example. Details are as follows:

The concrete contents of green building cases mainly include: (1) architectural conception, (2) architectural layout and function analysis, (3) active solar energy design, (4) passive solar energy design and (5) other technologies.

Among them, other technical analysis contents in this green building case include:

1) building greening-planting roof greening and balcony greening

By planting roofs, the building environment can be improved, the thermal insulation effect of buildings can be improved, and energy consumption can be reduced. Roof greening and balcony greening can not only improve the environment, but also make urban residents feel cordial and comfortable.

2) Rainwater collection system After the rainwater falls on the roof, part of it is absorbed by the planted roof, and most of it is recycled through the rainwater system on the roof. After the rainwater is recycled, some of it directly returns to the water circulation system of nature, some of it is used for irrigation of plants inside buildings, and some of it is used for floor cooling.

3) Improve the noise-the sound-absorbing floor base of perforated plate and double-layer glass sound-insulation wall is located between two urban roads, which makes a lot of noise. In order to improve the present situation, this work adopts multi-clock sound absorption and sound insulation technology.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.