At present, Hunan Province has sent a letter to the Hubei Provincial Department of Transportation, mainly pushing Yizhang Expressway through Wufeng Yuyangguan and Hongshan, Shimen Road, Hunan Province, to Cilixi.
Yi Zhang expressway-Construction Significance
The operating mileage of Yizhang Expressway (Yichang-Zhangjiajie Expressway) is about187km, starting from Dangyang Shuanglian and connecting with Jingyi Expressway and Baoyi Expressway. Yichang, which is about 100 km, is designed as a two-way four-lane highway. At present, Hunan Province has sent a letter to the Hubei Provincial Department of Transportation. The main direction of Yizhang Expressway is Yichang, which passes through Yuyang Pass in Wufeng, Hunan Province and Hongshan in Shimen Road to Cili. Yizhang Expressway will be started on 20 1 1, and will be fully completed and opened to traffic during the Twelfth Five-Year Plan period, ending the history of no expressway in Wufeng. Yizhang Expressway is not only a golden tourist passage connecting Zhangjiajie, Hu Ping, Chaibuxi, Three Gorges and Shennongjia, but also a north-south passage of Wuling Mountain Economic Cooperation Planning Area, and it is also a link connecting Hunan and Hubei friendship.
Yizhang expressway-Start-Stop Route
Yidu to Wufeng (Yuyangguan) Yichang to Zhangjiajie expressway starts from Yangjiaochong, Quanxinfan Village, Zhicheng Town, Yidu City, connects to the south bank of the proposed Baiyang Yangtze River Highway Bridge, and crosses the proposed Yueyang to Yichang expressway Yichang section. The line runs south through Yaojiadian, niejiahe and Wangjiafan in Yidu City, crosses Baimaxi, Poshi River and Quanfu River, and ends at Wang Fu River in Yidu City.
Yizhang expressway-Highway Connection Line
According to Zhong Da's consultation, there are two new connecting lines in expressway, Yizhang: Wangjiafan connecting line 4.10/km, with 52 meters /2 medium bridges; The new Yuyangguan connecting line is 2.655 kilometers, the bridge is 524.5 meters, and the middle tunnel is 1 132 meters. The total budgetary estimate for the preliminary design of this project is 4,665,438 million yuan +0.07 billion yuan, and the total construction period is 48 months.
The above is the introduction of Zhong Da Consulting to Yizhang Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.