Unconsciously, we realized that the hard work was over. Looking back on the work since this period, I have gained a lot, so I need to write a work summary carefully. But how to write a work summary to make a difference? The following is a summary of the project construction work I collected (selected 6 articles), hoping to help you.
Summary of project construction work 1 Time flies, time flies, and I have been working in the unit for half a year in a blink of an eye. This half year is an important journey in my life. During this period, with the help of leaders and the care and support of colleagues, I gradually completed the dual transformation and adaptation of this environment and role from surveying and mapping engineering to engineering department, from university to xx high-grade highway construction corporation. At the beginning and end of the year, I meditated on my work and life in the past six months and gained a lot. Now I will summarize my study and work in the past six months as follows:
I. Work:
In July of xx, I was lucky enough to work in xx High-grade Highway Construction Corporation and was assigned to theNo. 13 bid section of xx subgrade project. The engineering department is the leader of the company, mainly responsible for the management of planning and measurement. Engineering can exercise people and learn a lot at the same time. In this half year's study and work, I have learned the names of various parts of the bridge, learned a part of the highway drawings, mastered the relevant contents of the industry, and the sorting methods and laws of the completion data. During this period, I learned a lot and summarized some shortcomings. I need to work harder to learn relevant knowledge, go to the scene to learn more, and learn more on the spot. So in the next year, I am not afraid of the wind and the sun, and I have the opportunity to study more on the spot. Consciously strengthen study, learn from theory, learn from professional knowledge, learn from colleagues around you, gradually improve your theoretical level and business ability, overcome young impatience, be down-to-earth, improve your work initiative, be not afraid of many things, be not afraid of small things, and improve and improve yourself in bit by bit practice.
Second, the ideological aspect:
First of all, consciously strengthen political theory study and improve party spirit cultivation. The strong political learning atmosphere in the company deeply infected me. I actively participated in various learning activities organized by the company, paid attention to self-study and studied hard, further improved my theoretical level and political quality, strengthened my sense of honesty and self-discipline, and wrote an application for joining the party and an ideological report, hoping to join the ranks of the China * * * production party as soon as possible, and implored the company and the party to test it. Consult colleagues modestly at work and actively consult when encountering problems, which can be well solved. There is still a lot to learn in the future, so we should persevere.
Three. Xx year work plan:
This year, we mainly manage the completion data. Although I don't know much about it, I humbly ask the leaders to improve this aspect. At the same time, in the engineering department, I obey the arrangement of the leader, conscientiously complete the tasks assigned by the leader, and obey the arrangement of the organization.
The company's five reforms and five innovations have been well implemented, and we will continue to carry out the project of "comparing progress and creating image"; Compare quality and build high-quality projects; Create a cleaner government project than project management; Create a safer project than safe production; Compared with civilized construction, create a harmonious project. "
The above is a summary of my work for half a year. In the future, I will be down-to-earth, make achievements in this fertile land of xx high-grade highway construction corporation, and contribute my youth to xx high-grade highway construction corporation.
Engineering construction work summary 2 I entered the project management department of the company through recruitment on August, xx 10. From the engineering construction unit to the engineering construction unit, although my job position and role have changed greatly, it is also my first time to contact the budget quota of Zhejiang construction project, but with the care of the leaders and the help of my colleagues, with my professional foundation and work experience, plus hard study and research, I quickly adapted to the working environment and achieved good results. This work is briefly described as follows:
First of all, personal introduction.
1September, 1996 to1July, 1999, majoring in engineering cost in Hunan Urban Construction College. 1From July, 1999 to July, XX, I worked in the Fourth Engineering Co., Ltd. of China Railway 19th Bureau Group, engaged in budgeting, contract management, bidding management, etc. Xx years 10, participated in and passed the national cost engineer qualification examination.
II. Main achievements and achievements
1, strictly abide by the company's rules and regulations. At the beginning of my work, I carefully studied various rules and regulations such as Vico Outline, Daily Code of Conduct for Employees in Real Estate Sector, Basic Management System and Job Function Description, and kept them in mind, reminding myself to strictly abide by the company's rules and regulations and maintain the company's image. For example, come to work early every day, clean the office and create a clean working environment for colleagues.
2. Seriously study the budget information of Zhejiang Province. Although the principle of budgeting is the same, the "Zhejiang Construction and Installation Engineering Quota" is very different from the highway and railway engineering quotas that I used to contact more. Therefore, I first made a serious and systematic study of the budgeting materials in Zhejiang Province, and insisted on learning by doing. I quickly mastered the essentials and was able to complete the tasks assigned by the leaders independently. At the same time, in my spare time, I also learned to use "clever software" to prepare budget and "Luban software" to calculate steel bars, which greatly improved work efficiency. In the future work, I will continue to explore and learn, and make my work more detailed and perfect.
3. The final accounts audit of winding workshop and temporary works of Vico Flavor Group Co., Ltd. Dunhuang Branch is progressing smoothly. Although the winding workshop and temporary works have been completed for a long time, the relevant completion information is very incomplete, which brings great difficulties to the final accounts audit. After I took over this job, on the one hand, I actively asked the construction unit to improve the completion data.
On the other hand, use the existing data to calculate the number of projects and check the data. In order to accurately grasp the engineering situation and ensure the accuracy of calculation, I also went to the site to take a closer look. Through my efforts, this work is progressing rapidly at present, most of the materials needed for the final accounts audit of the project have been collected, and the budget of the winding workshop has been checked with the construction unit.
Summary of engineering construction work 3 On the basis of comprehensive control of dust pollution in the early stage of my project, we will continue to implement various dust control measures, strengthen the management of various construction sites, and strive to control dust pollution and improve air quality. The special dust control work in May of xx is summarized as follows:
First, the dust control effect
1. Facing the actual situation of large construction site, large earthwork excavation and difficult dust pollution control in my project area, a series of effective and decisive measures were taken to give full play to the project organization function. Through the cooperation of all parties, active measures such as centralized rectification, special rectification and all-weather inspection were taken, and some violations of dust pollution and dumping were rectified in strict accordance with the project dust prevention and control regulations, and the high-pressure situation of dust pollution control was always maintained. Fast, basic norms for earthwork excavation of buildings under construction within the jurisdiction, effective containment of leakage of construction muck transportation, basic elimination of dumping and scattering, and obvious improvement of road dust pollution.
2. On the basis of strengthening management, designated persons shall intensify road washing, sweeping and cleaning, and measures shall be taken to wash and dust the construction pavement, so as to effectively control road dust pollution. Avoid dust pollution and effectively improve the air and environmental quality.
Second, the existing difficulties and shortcomings
At present, our project department does not have enough specialized dust control personnel and control efforts. There are many dust control teams and projects, and coordination is difficult. Our project team lacks long-term control measures for loading muck (sand and gravel, polluted roads) and driving vehicles on the road, which makes it difficult to implement dust control and control measures. In some construction sites where the hardening of the site is not in place, the mud removal treatment is not enough when the transport vehicles come out, resulting in road pollution.
Third, the dust pollution rectification measures
In view of the existing problems, our project department has formulated a specific rectification plan. All relevant teams and responsible persons are required to formulate dust control measures in strict accordance with dust standards, wash equipment on time, adhere to wet operation, designate special personnel to be responsible for cleaning and sprinkling water to reduce dust, and earnestly do a good job in dust control on the construction site; The dust prevention and control working group adopts a combination of regular and irregular, regular and irregular ways to strengthen supervision, and once problems are found, it is ordered to rectify immediately.
Four. Work innovation and next work focus
Our project department will further strengthen the comprehensive improvement of dust, continue to strengthen the comprehensive improvement of engineering environment, and strengthen the implementation of special responsibility for dust control.
1. Make dust control responsibility a prerequisite for site construction, conduct daily assessment and sign assessment opinions as one of the elements of rewards and punishments for relevant teams and groups.
2. Strictly shut down the newly started construction site, and do not allow dust pollution problems in the newly started construction site, and sign dust pollution control agreements with relevant subcontractors.
3. Those who violate the dust prevention and control regulations of the Project Department shall be given heavy penalties.
Summary of Project Construction Work 4 In the process of project construction, according to the requirements of the Notice of Shandong Provincial Department of Housing and Urban-Rural Development on Carrying out Special Inspection of Dust Control in Urban Construction and Centralized Action Supervision of Construction Slag Control, Dust Control and Safety Protection, our unit has formulated a special treatment plan for muck control, dust control and safety protection to promote this work.
1, set up a leading group to control muck, control dust and ensure safety.
2. Set up a color steel enclosure at the construction site, with a height of not less than 1.8m, and install iron closed doors at the entrance and exit.
3. Vehicles entering and leaving the construction site must wash the wheels, and the road surface should be washed with water frequently; Vehicles transporting earthwork and muck on the construction site shall be closed or blocked.
4, earthwork shoveling, unloading and rolling in the process of spraying dust by designated personnel. When a transport vehicle loads earthwork, the highest point of earthwork shall not exceed 50 cm of the upper edge of the trench, and the edges on both sides shall be lower than the upper edge of the trench 10~20 cm, and shall be properly covered;
5. When earthwork is piled up in the construction site, measures such as covering, temporary surface maintenance and sprinkling water to reduce dust should be taken; Dust building materials such as cement on the construction site must be sealed or covered, and it is forbidden to store them in the open air.
6. The on-site construction access road should be covered with gravel according to the specific situation, and sprayed with water to reduce dust in time, or temporarily afforested;
7. All cement, sand, stones and granular materials entering the site must be covered with waterproof cloth to avoid dust. In the construction site, cement, lime powder and other materials that are easy to fly are stacked in closed warehouses to prevent dust; The powder scattered on the ground should be cleaned by sprinkling water in time, and it is not allowed to be scattered or exposed. It is forbidden to load and unload powdery materials such as cement and lime powder in windy weather.
8. In order to reduce the occurrence of dust on the construction site and the pollution of cast-in-place concrete to the ground, the main roads on the construction site are hardened with concrete.
9. When cleaning up construction waste, a closed special garbage chute or container should be used for lifting. It is forbidden to throw dust into the air. The construction site shall be provided with classified and sealed garbage stations, which shall be cleaned up and transported in time. When cleaning up and transporting, appropriate amount of water shall be sprayed to reduce dust.
10, the main roads on the construction site shall be watered by designated personnel at any time every day to suppress dust.
1 1, the operation surface should be cleaned up after work, and the surrounding buildings should be closed with external hanging nets. Before the scaffold is dismantled, the garbage in the horizontal net and scaffold should be cleaned up first, and then put into bags to avoid dust.
12, building demolition should be closed or dusted with water, cleaned in time, and operations are not allowed in windy weather.
13. All garbage on the construction site must be removed from the site on the same day and transported to the designated garbage disposal site in accordance with the regulations of the relevant government management agencies. Through the development of this dust activity, we have more deeply realized the importance of controlling the dust from muck, and improving the urban ambient air quality can guarantee the basic health of human beings, which is inseparable.
Start our unremitting efforts to control muck and dust. In the future work, our company will continue to take the treatment of muck and dust as an important part of safety work to ensure the effectiveness of this activity.
Summary of Engineering Construction Work 5 According to the Implementation Plan of Project Information Disclosure and Credit System Construction in the Engineering Construction Field of XX District of XX City (Resettlement Industry [20xx] 1No.) and the spirit of relevant meetings, combined with the actual situation of our bureau, the work is summarized as follows:
First, attach great importance to it, carefully organize and implement it in an orderly manner.
Our sub-bureau attaches great importance to project information disclosure and credit system construction in the field of engineering construction. First, hold a special meeting, designate a special person to be responsible for the implementation, clarify the disclosure content, form and time limit of "information", standardize the information disclosure procedures, and promote the orderly development of information disclosure. Second, relying on the portal website of the Bureau, comprehensively integrate information resources, establish a public service platform for project information and credit information covering land management, law enforcement and supervision, mining administration and other land and resources engineering construction fields, promote the sharing of information resources, and provide convenient and high-quality land and resources information services for all sectors of society and the general public.
Two, to further strengthen and standardize the work of information disclosure.
Our bureau has organized many meetings for research and deployment, expanded the contents involved in information disclosure to cover all land and resources management functions, clearly standardized the procedures for information submission and release and the division of responsibilities, and constantly improved the information release mechanism. At the same time, comprehensively collect project information disclosure materials and credit information of employees and units that can be disclosed, continuously enrich the content, comprehensively broaden the coverage of information disclosure, and combine project information, credit information and land and resources management to continuously improve the quality and level of information disclosure and better serve the economic and social construction of our region.
Third, strengthen supervision to ensure effective results.
First, standardize the management process, standardize the behavior of managers, and strictly formulate relevant regulations to prevent disciplinary actions such as project establishment and inspection, so that the behavior of all project managers can be well standardized and corrected.
The second is to strengthen supervision and accountability. Intensify the investigation and handling of cases and severely punish corruption. It is necessary to carry out the investigation and handling of cases throughout the whole process of special investigations, so as to find them together, investigate them together, never tolerate them, and give full play to the disciplinary and deterrent effects of investigating cases. Focusing on investigating and dealing with illegal cases of land and mineral approval and transfer, we will seriously investigate and deal with cases in which leading cadres use their powers to interfere in the approval and transfer of land and mining rights for personal gain, and seriously investigate and deal with illegal cases such as illegal land grant, land transfer at low prices, unauthorized changes in planning, illegal land acquisition and demolition. Relevant units and responsible persons who have caused adverse consequences in violation of relevant laws and regulations should be strictly investigated for responsibility.
The third is to further improve the system and establish a long-term mechanism. Strengthen the system construction of key parts and key links. Further strengthen the supervision of land acquisition approval and post-approval, establish an effective mechanism to prevent and correct illegal land grant, and improve the collective joint examination system for construction land approval; Further improve the examination and approval system for the transfer of exploration and mining rights, and establish a scientific and standardized mining rights evaluation system. Do a good job of connecting laws and regulations. Use the online supervision e-government open platform to strengthen the supervision and management of key engineering construction fields, and put the principle of openness and transparency in government affairs throughout the whole process of land use rights, mining rights approval and transfer.
Summary of Project Construction Work 6 In order to implement the spirit of Document Jian Fa (20xx) No.434 and ensure the quality and quantity of affordable housing projects in our county are completed, our bureau attaches great importance to the quality and safety inspection of affordable housing projects, and earnestly organizes the establishment of an inspection leading group to conduct self-inspection and rectification work on the construction of affordable housing projects in the county. The self-inspection work of our bureau is hereby notified as follows:
First, check the basic situation:
Under the great attention of the bureau leaders, our county conducted a comprehensive and systematic inspection of the affordable housing projects under construction, and made a serious summary and rectification of the safety and quality problems found in the inspection. The affordable housing project under construction in our county is mainly the construction of low-rent housing. In the inspection of its construction projects, we found the following problems:
1, the information of the engineering industry is not perfect, and the relevant person in charge is not serious and comprehensive, which requires rectification and improvement.
2. The dislocation of the stair beams and columns in some projects needs to be rectified jointly by the constructor and the designer.
3, the project entered the main project construction (2-3 floors), and the supervision unit failed to organize the basic power distribution acceptance in time.
4. The personal safety awareness on the construction site is low, and the construction safety protection measures are unscientific and unreasonable.
Second, the causes of the problem analysis
1, the safety guarantee system of the construction unit is not perfect, the safety responsibility system is not implemented, the number of safety officers is insufficient, the safety investment is insufficient, the project manager and safety officers fail to perform their safety duties effectively, and the safety protection of the on-site entities is not in place.
2. The construction unit did not seriously carry out the work in strict accordance with the quality requirements of the affordable housing project of the Ministry of Construction, and the quality consciousness became a mere formality, and did not attach great importance to the quality and safety requirements of the construction project.
3. The safety supervision of the supervision unit is not in place, and there is no safety supervision engineer. The investigation work is a mere formality, and major hidden dangers are not reported in time.
4. The construction unit has a poor awareness of quality and safety, fails to organize the project construction according to the basic construction procedures, fails to attach great importance to the construction of affordable housing projects, fails to form an effective management mechanism, and fails to solve the existing problems in time.
5. The safety management awareness and management level of municipal engineering construction units are low, and the responsible subjects generally pay insufficient attention to safety, so safety supervision needs to be standardized.
6, the construction unit, supervision unit, some staff work sense of responsibility is not strong, problems are not solved in time, the work is not put in place in time.
Third, the next work requirements
In view of the above problems, urge all construction enterprises to attach great importance to it, raise awareness, establish and improve the quality and safety guarantee system of affordable housing projects, and increase investment in quality and safety; Effectively take effective measures to greatly improve the technical level of construction safety and safety supervision of enterprises, and strengthen the responsibility of quality and safety work of relevant responsible persons of enterprises.
Under the careful supervision of our bureau, the problems have been rectified in time, and the construction of affordable housing projects in our county is proceeding healthily and orderly. I believe that under the cordial care and guidance of the city leaders, our county will be able to hand over a socially satisfactory affordable housing project. Our bureau will further strengthen safety supervision and services to prevent similar problems from happening. Strengthen the construction of safety and quality standardization, strengthen publicity and guidance in accordance with the overall requirements of ministries and agencies and municipal bureaus, increase the quality and safety supervision of affordable housing projects, comprehensively promote the further improvement of the construction quality of affordable housing projects in our county, carry out safety and quality standardization activities of affordable housing projects, and improve the construction safety level.
;